Building a drainage system to prevent flooding for the area in front of Ho Tram Parish, Phuoc Thuan commune
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2300027187-00
Notice type
Real announcement
Project name
Building a drainage system to prevent flooding for the area in front of Ho Tram Parish, Phuoc Thuan commune
Project objective
Construction investment and construction of a drainage system to prevent flooding for the area in front of Ho Tram Parish, Phuoc Thuan commune is very necessary and urgent to overcome the situation of flooded roads, ensure the connection of the system. existing drainage system in the area, gradually improving the environment, improving people's living standards, promoting economic and social development in the region.
Authority
Xuyen Moc District People's Committee
Project management Type
The investor hires a project management consultant
Implementation location
Huyện Xuyên Mộc, Ba Ria Vung Tau province
Project approval ID
1859/QĐ-UBND
Project approval date
29/03/2023
Approval authority
Ủy ban nhân dân huyện Xuyên Mộc
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet