Bridge over Ayun River to Ia Yeng Commune (From Highway 25 to Ia Yeng Commune); Item: Relocating water supply pipes
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2300021205-00
Notice type
Real announcement
Project name
Bridge over Ayun River to Ia Yeng Commune (From Highway 25 to Ia Yeng Commune); Item: Relocating water supply pipes
Project objective
Building the Ayun River and using the two projects above to declare and enter the XA Ia Yeng is the most important part of the traffic storm, specializing in agriculture and human development in the area. cii
hin ti (is cu xi phon); working together to complete the criteria for rural construction in Ta Yeng and Phu Thin communes and for economic and social development.
Implementation location
Huyện Phú Thiện, Gia Lai province
Project approval ID
91/QĐ-UBND
Project approval date
15/03/2023
Approval authority
Uỷ ban nhân dân huyện Phú Thiện
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register
91Vv phê duyệt Phương án - Dự toán chi tiết bồi thường,.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet