Bidding package "Audit of finalization of completed projects" belongs to 02 additional construction investment projects in 2023 of Lao Cai Power Company (1. Project: Installing battery pack No. 02 at 110kV Van Ban Station ( E20.40), Tang Loong 3 110kV Station (E20.45), Sa Pa 110kV Station (E20.54); 2. Project: Replacing long-time operating distribution transformers with degraded quality, on the power grid managed by Lao Cai Power Company with a new MBA)
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2300031883-00
Notice type
Real announcement
Project name
Bidding package "Audit of finalization of completed projects" belongs to 02 additional construction investment projects in 2023 of Lao Cai Power Company (1. Project: Installing battery pack No. 02 at 110kV Van Ban Station ( E20.40), Tang Loong 3 110kV Station (E20.45), Sa Pa 110kV Station (E20.54); 2. Project: Replacing long-time operating distribution transformers with degraded quality, on the power grid managed by Lao Cai Power Company with a new MBA)
Project objective
Ensure reliable DC power supply for DC loads at Van Ban 110kV Stations (E20.40), Tang Loong 3 110kV Stations (E20.45) and Sa Pa 110kV Stations (E20.54) operated by the Electricity Company Management of Lao Cai; Improving the operating capacity of distribution substations, improving the reliability of power supply, ensuring safety in operation management, and minimizing grid failures. Meeting the demand for electricity supply for socio-economic development
Authority
Director of Lao Cai Power Company
Project management Type
The investor directly manages the project
Implementation location
Lao Cai province
Project approval ID
785/QĐ-PCLK
Project approval date
13/07/2023
Approval authority
Công ty Điện lực Lào Cai
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register
3. QD duyet KHLCNT KT 02 DA bo sung.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet