Architectural overhaul of 18 substations in Soc Son district (Substations: Thanh Ha Resettlement, Bac Son Resettlement, Da Hoi, Xuan Son, Pho Ny 1, Xuan Dong 1, Lai Cach 1, Xuan Tao 1, Electric Power University, Xuan Duc 2, Ve Son Doai 1, Coc Luong, Ngo Dao 1, Phu Tang 2, Duc Hoa 1, Bac Vong 1, Dong Ngan, Ve Son Dong 1)
Project number
PR2300016699-00
Notice type
Real announcement
Project name
Architectural overhaul of 18 substations in Soc Son district (Substations: Thanh Ha Resettlement, Bac Son Resettlement, Da Hoi, Xuan Son, Pho Ny 1, Xuan Dong 1, Lai Cach 1, Xuan Tao 1, Electric Power University, Xuan Duc 2, Ve Son Doai 1, Coc Luong, Ngo Dao 1, Phu Tang 2, Duc Hoa 1, Bac Vong 1, Dong Ngan, Ve Son Dong 1)
Project objective
Architectural overhaul of 18 substations in Soc Son district: Thanh Ha Resettlement, Bac Son Resettlement, Da Hoi, Xuan Son, Pho Ny 1, Xuan Dong 1, Lai Cach 1, Xuan Tao 1, Truong Electricity University, Xuan Duc 2, Ve Son Doai 1, Coc Luong, Ngo Dao 1, Phu Tang 2, Duc Hoa 1, Bac Vong 1, Dong Ngan, Ve Son Dong 1
Authority
Director Vu Tuan Anh
Project management Type
The investor directly manages the project
Implementation location
Huyện Sóc sơn, Ha Noi city
Project approval ID
1051/QĐ-PCSOCSON ngày 05/05/2022
Project approval date
05/05/2022
Approval authority
Công ty Điện lực Sóc Sơn
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register
QĐPD PAKT 45 - ĐẠI TU 18 TBA (1).pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans for this project
NO |
Contractor selection plan ID |
Contractor selection plan name |
Total investment |
1
|
Contractor selection plan (investment preparation phase) for the project: Overhauling architecture of 18 substations in Soc Son district (Substations: Thanh Ha Resettlement, Bac Son Resettlement, Da Nang). Hoi, Xuan Son, Street 1, Xuan Dong 1, Lai Cach 1, Xuan Tao 1, Electric Power University, Xuan Duc 2, Ve Son Doai 1, Coc Luong, Ngo Dao 1, Phu Tang 2, Duc Hoa 1 , Bac Vong 1, Dong Ngan, Ve Son Dong 1)
|
2.997.750.000 VND |
Total amount |
2.997.750.000 VND |
Statistical table of bidding packages under the project
Statistics by type of bidding package |
Statistics by form |
Online bidding value (billion VND) |
Number of bidding packages whose results have been posted |
Goods |
Civil Works |
Consulting |
Other categories |
Non-Consulting |
Online |
Offline |
0 |
0 |
2 |
0 |
0 |
1
|
1 |
0.02
|
1
|