Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân huyện Đông Sơn as follows:
- Has relationships with 2 contractor.
- Announced 20 investment development project, of which 20 projects have not yet announced the prequalification documents.
- Announced 14 contractor selection plans with a total of 67 bidding packages, of which 4 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 67 packages that have not fully posted the contractor selection results. Of these 54 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 37,915,477 VND, of which the total winning bid value is: 37,914,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân huyện Đông Sơn as follows:
- Has relationships with 2 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 37,915,477 VND, in which the total winning value is: 37,914,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 20 investment and development projects.
- As the owner of 14 Contractor selection plan in which 14 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 62 bidding packages in which 0 packages are self-invited, and 62 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Ủy ban nhân dân huyện Đông Sơn Posted Development Investment Project Infrastructure of Dong But residential area, pine forest town, Dong Tien commune, Dong Son district - Area B.
11/07/2023 07:07
Ủy ban nhân dân huyện Đông Sơn Posted Development Investment Project Infrastructure Dong But residential area, Rung Thong town, Dong Tien commune, Dong Son district – Zone A.
10/07/2023 11:11
Ủy ban nhân dân huyện Đông Sơn Posted Development Investment Project The zoning plan of 1/2000 scale, area 09, belongs to the general planning of Thanh Hoa urban area, Thanh Hoa province.
05/07/2023 09:09
Ủy ban nhân dân huyện Đông Sơn Posted Development Investment Project The zoning plan of 1/2000 scale, area 12, belongs to the general planning of Thanh Hoa urban area, Thanh Hoa province.
05/07/2023 09:09
Ủy ban nhân dân huyện Đông Sơn Posted Development Investment Project Surveying and planning zoning at the scale of 1/2000 of area 11, under the general planning of Thanh Hoa urban area, Thanh Hoa province.
05/07/2023 09:09
Ủy ban nhân dân huyện Đông Sơn Posted Development Investment Project Zoning plan of 1/2000 scale area 10, under the general planning of Thanh Hoa urban area, Thanh Hoa province.
05/07/2023 09:09
The Bid solicitor Ủy ban nhân dân huyện Đông Sơn has posted the request Project contractor selection plan: Install street and street name signs in Rung Thong town, Dong Son district - Item: Install street name signs of the investor Ủy ban nhân dân huyện Đông Sơn with 4 bidding package.
23/06/2023 15:07
The Bid solicitor Ủy ban nhân dân huyện Đông Sơn has posted the request Urban trunk road, Rung Thong town (Connecting National Highway 45 with East-West Highway in Thanh Hoa city) of the investor Ủy ban nhân dân huyện Đông Sơn with 6 bidding package.
19/06/2023 17:27
Ủy ban nhân dân huyện Đông Sơn Posted Development Investment Project Urban trunk road, Rung Thong town (Connecting National Highway 45 with East-West Highway in Thanh Hoa city).
19/06/2023 17:17
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân huyện Đông Sơn publishes the plan Project contractor selection plan: Install street and street name signs in Rung Thong town, Dong Son district - Item: Install street name signs with 4 bidding package .
23/06/2023 15:07
Ủy ban nhân dân huyện Đông Sơn publishes the plan Urban trunk road, Rung Thong town (Connecting National Highway 45 with East-West Highway in Thanh Hoa city) with 6 bidding package .
19/06/2023 17:27
Ủy ban nhân dân huyện Đông Sơn publishes the plan 110kV transmission line works for site clearance for construction: Urban trunk road, Rung Thong town (Connecting National Highway 45 with East-West Highway, Thanh Hoa city) with 4 bidding package .
19/06/2023 17:07
Ủy ban nhân dân huyện Đông Sơn announced the results of the bid package Package 02: Prepare bidding documents, evaluate construction bids .
- Winning bidder: CÔNG TY CỔ PHẦN PHÁT TRIỂN XÂY DỰNG LAM SƠN
16/06/2023 15:14
Ủy ban nhân dân huyện Đông Sơn publishes the plan Road from National Highway 45 to Giang 15A, section passing Dong Thanh Commune School, Dong Son District with 6 bidding package .
16/06/2023 14:28
Ủy ban nhân dân huyện Đông Sơn publishes the plan Construction contractor selection plan: Installing street nameplates in Dong Phu, Dong Nam, Dong Thinh, Dong Son communes with 4 bidding package .
15/06/2023 16:45
Ủy ban nhân dân huyện Đông Sơn publishes the plan New residential area infrastructure opposite Thai Long Company, Hiep Khoi village, Trieu Xa village, Dong Tien commune, Dong Son district, Thanh Hoa province with 4 bidding package .
14/06/2023 14:55
Ủy ban nhân dân huyện Đông Sơn publishes the plan Renovating Dong Son High School 2 with 5 bidding package .
03/06/2023 15:55
Ủy ban nhân dân huyện Đông Sơn publishes the plan Road of Trieu Tien village, Dong Tien commune, Dong Son district (section from MB Dong Quan rice tree to Nghe connecting with Trieu Xa village 1 to the sports center of the commune) – Item: Moving the electricity road to serve land clearance with 5 bidding package .
31/05/2023 16:42
Ủy ban nhân dân huyện Đông Sơn announced the results of the bid package Tender package No 01: Consultancy on preparation of Bid Documents, Bid evaluation .
- Winning bidder:
17/05/2023 15:33
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân huyện Đông Sơn Posted Development Investment Project Infrastructure of Dong But residential area, pine forest town, Dong Tien commune, Dong Son district - Area B.
11/07/2023 07:07
Ủy ban nhân dân huyện Đông Sơn Posted Development Investment Project Infrastructure Dong But residential area, Rung Thong town, Dong Tien commune, Dong Son district – Zone A.
10/07/2023 11:11
Ủy ban nhân dân huyện Đông Sơn Posted Development Investment Project The zoning plan of 1/2000 scale, area 09, belongs to the general planning of Thanh Hoa urban area, Thanh Hoa province.
05/07/2023 09:09
Ủy ban nhân dân huyện Đông Sơn Posted Development Investment Project The zoning plan of 1/2000 scale, area 12, belongs to the general planning of Thanh Hoa urban area, Thanh Hoa province.
05/07/2023 09:09
Ủy ban nhân dân huyện Đông Sơn Posted Development Investment Project Surveying and planning zoning at the scale of 1/2000 of area 11, under the general planning of Thanh Hoa urban area, Thanh Hoa province.
05/07/2023 09:09
Ủy ban nhân dân huyện Đông Sơn Posted Development Investment Project Zoning plan of 1/2000 scale area 10, under the general planning of Thanh Hoa urban area, Thanh Hoa province.
05/07/2023 09:09
The Bid solicitor Ủy ban nhân dân huyện Đông Sơn has posted the request Project contractor selection plan: Install street and street name signs in Rung Thong town, Dong Son district - Item: Install street name signs of the investor Ủy ban nhân dân huyện Đông Sơn with 4 bidding package.
23/06/2023 15:07
The Bid solicitor Ủy ban nhân dân huyện Đông Sơn has posted the request Urban trunk road, Rung Thong town (Connecting National Highway 45 with East-West Highway in Thanh Hoa city) of the investor Ủy ban nhân dân huyện Đông Sơn with 6 bidding package.
19/06/2023 17:27
Ủy ban nhân dân huyện Đông Sơn Posted Development Investment Project Urban trunk road, Rung Thong town (Connecting National Highway 45 with East-West Highway in Thanh Hoa city).
19/06/2023 17:17
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy ban nhân dân huyện Đông Sơn has posted 14 of the contractor selection plan, which contains 67 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân huyện Đông Sơn has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy ban nhân dân huyện Đông Sơn has a relationship with 2 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân huyện Đông Sơn has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân huyện Đông Sơn is the owner of 14 contractor selection plan. In which, they self-invite 14 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ủy ban nhân dân huyện Đông Sơn is an investor with 19 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân huyện Đông Sơn is the investor of 20 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register