Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Trường THPT Bình Minh as follows:
- Has relationships with 0 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 7 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 1 packages with results that do not have tender notice or prequalification notice.
- There are 7 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 23,774,000 VND, of which the total winning bid value is: 23,774,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Trường THPT Bình Minh as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 23,774,000 VND, in which the total winning value is: 23,774,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 3 Contractor selection plan in which 3 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 1 bidding packages in which 1 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Trường THPT Bình Minh has posted the request Repairing the outdoor stage of Binh Minh High School of the investor Trường THPT Bình Minh with 3 bidding package.
30/06/2023 20:19
The Bid solicitor Trường THPT Bình Minh has posted the results of the bidding package Tender package: Construction supervision of the investor Trường THPT Bình Minh.
07/06/2023 08:00
The Bid solicitor Trường THPT Bình Minh has posted the request Renewing the fence separating sports fields from school buildings and flower beds. Make basketball poles, volleyball courts, badminton courts of the investor Trường THPT Bình Minh with 1 bidding package.
31/05/2023 09:20
The Bid solicitor Trường THPT Bình Minh has posted the request Repair of annex 3, roof, garage, concrete yard, fence of Binh Minh High School of the investor Trường THPT Bình Minh with 3 bidding package.
27/05/2023 08:47
The data sheet has been partially hidden, to see the full information please Login or Register
Trường THPT Bình Minh publishes the plan Repairing the outdoor stage of Binh Minh High School with 3 bidding package .
30/06/2023 20:19
Trường THPT Bình Minh announced the results of the bid package Tender package: Construction supervision .
- Winning bidder:
07/06/2023 08:00
Trường THPT Bình Minh publishes the plan Renewing the fence separating sports fields from school buildings and flower beds. Make basketball poles, volleyball courts, badminton courts with 1 bidding package .
31/05/2023 09:20
Trường THPT Bình Minh publishes the plan Repair of annex 3, roof, garage, concrete yard, fence of Binh Minh High School with 3 bidding package .
27/05/2023 08:47
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Trường THPT Bình Minh has posted the request Repairing the outdoor stage of Binh Minh High School of the investor Trường THPT Bình Minh with 3 bidding package.
30/06/2023 20:19
The Bid solicitor Trường THPT Bình Minh has posted the results of the bidding package Tender package: Construction supervision of the investor Trường THPT Bình Minh.
07/06/2023 08:00
The Bid solicitor Trường THPT Bình Minh has posted the request Renewing the fence separating sports fields from school buildings and flower beds. Make basketball poles, volleyball courts, badminton courts of the investor Trường THPT Bình Minh with 1 bidding package.
31/05/2023 09:20
The Bid solicitor Trường THPT Bình Minh has posted the request Repair of annex 3, roof, garage, concrete yard, fence of Binh Minh High School of the investor Trường THPT Bình Minh with 3 bidding package.
27/05/2023 08:47
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường THPT Bình Minh has posted 3 of the contractor selection plan, which contains 7 of the bidding package. See full list here
Summary: The Bid solicitor Trường THPT Bình Minh has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 1 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: Investor Trường THPT Bình Minh has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trường THPT Bình Minh is the owner of 3 contractor selection plan. In which, they self-invite 3 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code