Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau as follows:
- Has relationships with 11 contractor.
- Announced 10 investment development project, of which 8 projects have not yet announced the prequalification documents.
- Announced 12 contractor selection plans with a total of 25 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 17 packages (with 17 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 48 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 33 packages with results that do not have tender notice or prequalification notice.
- There are 25 packages that have not fully posted the contractor selection results. Of these 25 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 51,049,951,764 VND, of which the total winning bid value is: 50,373,448,988 VND.
- The savings rate is: 1.33%.
Data analysis results of DauThau.info software for bid solicitors Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau as follows:
- Has relationships with 11 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 51,049,951,764 VND, in which the total winning value is: 50,373,448,988 VND.
- The savings rate is: 1.33%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 10 investment and development projects.
- As the owner of 12 Contractor selection plan in which 12 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 17 bidding packages in which 17 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau Posted Development Investment Project Maintenance and repair of Kenh Coc embankment.
25/06/2023 20:20
The Bid solicitor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau has posted the request Maintenance and repair of Kenh Coc embankment of the investor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau with 2 bidding package.
25/06/2023 20:11
The Bid solicitor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau has posted the request Dredging Ut Noi Channel of the investor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau with 2 bidding package.
25/06/2023 20:04
The Bid solicitor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau has posted the request Dredging of the Anti-American Canal (the section of Da - Ben Dia culvert) of the investor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau with 2 bidding package.
25/06/2023 17:30
The Bid solicitor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau has posted the request Dredging Binh Dinh River of the investor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau with 2 bidding package.
25/06/2023 17:22
Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau Posted Development Investment Project Dredging Binh Dinh River.
25/06/2023 17:17
Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau Posted Development Investment Project Dredging of the Anti-American Canal (the section of Da - Ben Dia culvert).
25/06/2023 17:17
Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau Posted Development Investment Project Dredging Ut Noi Channel.
25/06/2023 17:17
The Bid solicitor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau has posted the request Dredging the Sau Dong Canal of the investor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau with 2 bidding package.
24/06/2023 20:31
The Bid solicitor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau has posted the request Dredging Tan Dien Canal of the investor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau with 2 bidding package.
24/06/2023 20:20
The data sheet has been partially hidden, to see the full information please Login or Register
Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau publishes the plan Maintenance and repair of Kenh Coc embankment with 2 bidding package .
25/06/2023 20:11
Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau publishes the plan Dredging Ut Noi Channel with 2 bidding package .
25/06/2023 20:04
Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau publishes the plan Dredging of the Anti-American Canal (the section of Da - Ben Dia culvert) with 2 bidding package .
25/06/2023 17:30
Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau publishes the plan Dredging Binh Dinh River with 2 bidding package .
25/06/2023 17:22
Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau publishes the plan Dredging the Sau Dong Canal with 2 bidding package .
24/06/2023 20:31
Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau publishes the plan Dredging Tan Dien Canal with 2 bidding package .
24/06/2023 20:20
Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau publishes the plan Dredging Tram Bau canal with 2 bidding package .
24/06/2023 20:11
Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau publishes the plan Dredging the My Binh dike channel with 2 bidding package .
24/06/2023 20:03
Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau publishes the plan Repairing sluices 6 with 2 bidding package .
23/06/2023 10:07
Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau publishes the plan Repairing sluices of SD5 with 2 bidding package .
23/06/2023 09:53
The data sheet has been partially hidden, to see the full information please Login or Register
Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau Posted Development Investment Project Maintenance and repair of Kenh Coc embankment.
25/06/2023 20:20
The Bid solicitor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau has posted the request Maintenance and repair of Kenh Coc embankment of the investor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau with 2 bidding package.
25/06/2023 20:11
The Bid solicitor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau has posted the request Dredging Ut Noi Channel of the investor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau with 2 bidding package.
25/06/2023 20:04
The Bid solicitor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau has posted the request Dredging of the Anti-American Canal (the section of Da - Ben Dia culvert) of the investor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau with 2 bidding package.
25/06/2023 17:30
The Bid solicitor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau has posted the request Dredging Binh Dinh River of the investor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau with 2 bidding package.
25/06/2023 17:22
Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau Posted Development Investment Project Dredging Binh Dinh River.
25/06/2023 17:17
Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau Posted Development Investment Project Dredging of the Anti-American Canal (the section of Da - Ben Dia culvert).
25/06/2023 17:17
Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau Posted Development Investment Project Dredging Ut Noi Channel.
25/06/2023 17:17
The Bid solicitor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau has posted the request Dredging the Sau Dong Canal of the investor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau with 2 bidding package.
24/06/2023 20:31
The Bid solicitor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau has posted the request Dredging Tan Dien Canal of the investor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau with 2 bidding package.
24/06/2023 20:20
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau has posted 12 of the contractor selection plan, which contains 25 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau has posted 17 Tender Notice in the 17 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau has posted 48 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 48 package, canceled the bid 0 package (among the bidding packages above).
- There are 33 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau has a relationship with 11 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau is the investor of 17 package, of which 17 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau is the owner of 12 contractor selection plan. In which, they self-invite 12 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau is an investor with 11 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm Quản lý, khai thác công trình thủy lợi Cà Mau is the investor of 10 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code