Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Trung tâm phát triển quỹ đất thành phố Hạ Long as follows:
- Has relationships with 0 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 3 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 6 packages (with 6 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 2 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 50.00%, Consultancy 16.67%, Non-consultancy 33.33%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 99,869,000 VND, of which the total winning bid value is: 99,869,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Trung tâm phát triển quỹ đất thành phố Hạ Long as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 50.00%, Consulting 16.67%, Non-consulting 33.33%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 99,869,000 VND, in which the total winning value is: 99,869,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 3 Contractor selection plan in which 3 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 6 bidding packages in which 6 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted the request Plan to select contractor to perform the work: Measure and draw the current status of site clearance, set up landmarks, make an extract of the land plot file for site clearance for the project: New construction of Quang La Middle & High School in Quang La commune, city Ha Long. of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long with 1 bidding package.
19/07/2023 17:34
Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted Tender Notice Tender package No 01 - Construction insurance of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long with the form Shortened competitive offer.
26/06/2023 18:50
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted the results of the bidding package Design consultancy, project estimation of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long.
23/06/2023 17:04
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted the request plan to select consulting contractors to prepare design documents - cost estimates: Moving water supply pipelines for site clearance of Quang Ninh Lung Hospital Upgrade and Expansion Project of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long with 1 bidding package.
03/06/2023 09:17
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted the request plan for selection of consulting contractors to make design documents - cost estimates: Relocating power lines and substations to serve site clearance of the project of upgrading and expanding Quang Ninh Lung Hospital of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long with 1 bidding package.
03/06/2023 09:12
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted the results of the bidding package Package 03: Construction supervision of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long.
28/04/2023 16:42
Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted Tender Notice Tender package No 01 - Construction insurance of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long with the form Shortened competitive offer.
24/04/2023 14:49
Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted Tender Notice Package 04 - Construction supervision consultancy of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long with the form Open bidding.
24/04/2023 14:31
Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted Tender Notice Package 06 -Construction of works of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long with the form Open bidding.
24/04/2023 14:12
Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted Tender Notice Tender package No 04: Construction work of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long with the form Open bidding.
07/04/2023 10:21
The data sheet has been partially hidden, to see the full information please Login or Register
Trung tâm phát triển quỹ đất thành phố Hạ Long publishes the plan Plan to select contractor to perform the work: Measure and draw the current status of site clearance, set up landmarks, make an extract of the land plot file for site clearance for the project: New construction of Quang La Middle & High School in Quang La commune, city Ha Long. with 1 bidding package .
19/07/2023 17:34
Trung tâm phát triển quỹ đất thành phố Hạ Long publishes Tender Notice Tender package No 01 - Construction insurance in the form Shortened competitive offer .
26/06/2023 18:50
Trung tâm phát triển quỹ đất thành phố Hạ Long announced the results of the bid package Design consultancy, project estimation .
- Winning bidder:
23/06/2023 17:04
Trung tâm phát triển quỹ đất thành phố Hạ Long publishes the plan plan to select consulting contractors to prepare design documents - cost estimates: Moving water supply pipelines for site clearance of Quang Ninh Lung Hospital Upgrade and Expansion Project with 1 bidding package .
03/06/2023 09:17
Trung tâm phát triển quỹ đất thành phố Hạ Long publishes the plan plan for selection of consulting contractors to make design documents - cost estimates: Relocating power lines and substations to serve site clearance of the project of upgrading and expanding Quang Ninh Lung Hospital with 1 bidding package .
03/06/2023 09:12
Trung tâm phát triển quỹ đất thành phố Hạ Long announced the results of the bid package Package 03: Construction supervision .
- Winning bidder:
28/04/2023 16:42
Trung tâm phát triển quỹ đất thành phố Hạ Long publishes Tender Notice Tender package No 01 - Construction insurance in the form Shortened competitive offer .
24/04/2023 14:49
Trung tâm phát triển quỹ đất thành phố Hạ Long publishes Tender Notice Package 04 - Construction supervision consultancy in the form Open bidding .
24/04/2023 14:31
Trung tâm phát triển quỹ đất thành phố Hạ Long publishes Tender Notice Package 06 -Construction of works in the form Open bidding .
24/04/2023 14:12
Trung tâm phát triển quỹ đất thành phố Hạ Long publishes Tender Notice Tender package No 04: Construction work in the form Open bidding .
07/04/2023 10:21
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted the request Plan to select contractor to perform the work: Measure and draw the current status of site clearance, set up landmarks, make an extract of the land plot file for site clearance for the project: New construction of Quang La Middle & High School in Quang La commune, city Ha Long. of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long with 1 bidding package.
19/07/2023 17:34
Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted Tender Notice Tender package No 01 - Construction insurance of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long with the form Shortened competitive offer.
26/06/2023 18:50
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted the results of the bidding package Design consultancy, project estimation of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long.
23/06/2023 17:04
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted the request plan to select consulting contractors to prepare design documents - cost estimates: Moving water supply pipelines for site clearance of Quang Ninh Lung Hospital Upgrade and Expansion Project of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long with 1 bidding package.
03/06/2023 09:17
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted the request plan for selection of consulting contractors to make design documents - cost estimates: Relocating power lines and substations to serve site clearance of the project of upgrading and expanding Quang Ninh Lung Hospital of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long with 1 bidding package.
03/06/2023 09:12
The Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted the results of the bidding package Package 03: Construction supervision of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long.
28/04/2023 16:42
Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted Tender Notice Tender package No 01 - Construction insurance of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long with the form Shortened competitive offer.
24/04/2023 14:49
Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted Tender Notice Package 04 - Construction supervision consultancy of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long with the form Open bidding.
24/04/2023 14:31
Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted Tender Notice Package 06 -Construction of works of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long with the form Open bidding.
24/04/2023 14:12
Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted Tender Notice Tender package No 04: Construction work of the investor Trung tâm phát triển quỹ đất thành phố Hạ Long with the form Open bidding.
07/04/2023 10:21
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trung tâm phát triển quỹ đất thành phố Hạ Long has posted 3 of the contractor selection plan, which contains 3 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted 6 Tender Notice in the 6 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trung tâm phát triển quỹ đất thành phố Hạ Long has posted 2 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 2 package, canceled the bid 0 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: Investor Trung tâm phát triển quỹ đất thành phố Hạ Long has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm phát triển quỹ đất thành phố Hạ Long is the investor of 6 package, of which 6 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm phát triển quỹ đất thành phố Hạ Long is the owner of 3 contractor selection plan. In which, they self-invite 3 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code