Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Trung tâm phát triển quỹ đất huyện Phú Xuyên as follows:
- Has relationships with 0 contractor.
- Announced 26 investment development project, of which 25 projects have not yet announced the prequalification documents.
- Announced 24 contractor selection plans with a total of 73 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 3 packages (with 4 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 10 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 10 packages with results that do not have tender notice or prequalification notice.
- There are 72 packages that have not fully posted the contractor selection results. Of these 72 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,007,145,029 VND, of which the total winning bid value is: 1,993,397,029 VND.
- The savings rate is: 0.68%.
Data analysis results of DauThau.info software for bid solicitors Trung tâm phát triển quỹ đất huyện Phú Xuyên as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,007,145,029 VND, in which the total winning value is: 1,993,397,029 VND.
- The savings rate is: 0.68%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 26 investment and development projects.
- As the owner of 24 Contractor selection plan in which 24 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 4 bidding packages in which 4 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Trung tâm phát triển quỹ đất huyện Phú Xuyên has posted the request Contractor selection plan (investment preparation step) for the project: Moving and returning the medium- and low-voltage power systems to serve the site clearance of the project: Construction of infrastructure in Chau Can commune, Phu district Xuyen of the investor Trung tâm phát triển quỹ đất huyện Phú Xuyên with 3 bidding package.
20/07/2023 11:31
Bid solicitor Trung tâm phát triển quỹ đất huyện Phú Xuyên has posted Tender Notice Tender package No 11: Construction cost of the investor Trung tâm phát triển quỹ đất huyện Phú Xuyên with the form Open bidding.
15/07/2023 11:19
Trung tâm phát triển quỹ đất huyện Phú Xuyên Posted Development Investment Project Building a technical system for the auction of residential land use rights at the House of Culture, Thuong village, Chuyen My commune, Phu Xuyen district.
12/07/2023 09:09
Trung tâm phát triển quỹ đất huyện Phú Xuyên Posted Development Investment Project Moving and returning medium and low voltage power systems and transformer stations to serve site clearance of the project: Nam Tien A Kindergarten.
06/07/2023 14:14
The Bid solicitor Trung tâm phát triển quỹ đất huyện Phú Xuyên has posted the results of the bidding package Package 02: Cost of planning the total ground at the rate of 1/500, construction survey, preparation of economic and technical reports of the investor Trung tâm phát triển quỹ đất huyện Phú Xuyên.
05/07/2023 16:33
Trung tâm phát triển quỹ đất huyện Phú Xuyên Posted Development Investment Project Building a technical infrastructure for the auction of residential land use rights in the center of the commune, Tam Thuong village, Quang Lang commune.
04/07/2023 11:11
The Bid solicitor Trung tâm phát triển quỹ đất huyện Phú Xuyên has posted the request Contractor selection plan (investment preparation step) project of building technical infrastructure of residential land use right auction area in Mau Cua area (phase 2), Thuy Phu village, Nam Tien commune of the investor Trung tâm phát triển quỹ đất huyện Phú Xuyên with 3 bidding package.
03/07/2023 15:19
Trung tâm phát triển quỹ đất huyện Phú Xuyên Posted Development Investment Project Building a technical infrastructure for the auction of residential land use rights in the Mau Shop area (phase 2), Thuy Phu village, Nam Tien commune.
03/07/2023 14:14
The Bid solicitor Trung tâm phát triển quỹ đất huyện Phú Xuyên has posted the results of the bidding package Package 01: Cost of mapping the current status of 1/500 scale, land clearance cadastral map of 1/500 scale, planting site clearance landmarks of the investor Trung tâm phát triển quỹ đất huyện Phú Xuyên.
01/07/2023 11:09
The Bid solicitor Trung tâm phát triển quỹ đất huyện Phú Xuyên has posted the request Contractor selection plan (investment preparation step) for the work of Moving and returning the telecommunications technical infrastructure system to serve the site clearance of the inter-commune road project Van Hoang - Hoang Long - Tri Trung - Phu Tuc (section from Noi Coi bridge to Phu Tuc trunk road) of the investor Trung tâm phát triển quỹ đất huyện Phú Xuyên with 3 bidding package.
27/06/2023 16:44
The data sheet has been partially hidden, to see the full information please Login or Register
Trung tâm phát triển quỹ đất huyện Phú Xuyên publishes the plan Contractor selection plan (investment preparation step) for the project: Moving and returning the medium- and low-voltage power systems to serve the site clearance of the project: Construction of infrastructure in Chau Can commune, Phu district Xuyen with 3 bidding package .
20/07/2023 11:31
Trung tâm phát triển quỹ đất huyện Phú Xuyên publishes Tender Notice Tender package No 11: Construction cost in the form Open bidding .
15/07/2023 11:19
Trung tâm phát triển quỹ đất huyện Phú Xuyên announced the results of the bid package Package 02: Cost of planning the total ground at the rate of 1/500, construction survey, preparation of economic and technical reports .
- Winning bidder:
05/07/2023 16:33
Trung tâm phát triển quỹ đất huyện Phú Xuyên publishes the plan Contractor selection plan (investment preparation step) project of building technical infrastructure of residential land use right auction area in Mau Cua area (phase 2), Thuy Phu village, Nam Tien commune with 3 bidding package .
03/07/2023 15:19
Trung tâm phát triển quỹ đất huyện Phú Xuyên announced the results of the bid package Package 01: Cost of mapping the current status of 1/500 scale, land clearance cadastral map of 1/500 scale, planting site clearance landmarks .
- Winning bidder:
01/07/2023 11:09
Trung tâm phát triển quỹ đất huyện Phú Xuyên publishes the plan Contractor selection plan (investment preparation step) for the work of Moving and returning the telecommunications technical infrastructure system to serve the site clearance of the inter-commune road project Van Hoang - Hoang Long - Tri Trung - Phu Tuc (section from Noi Coi bridge to Phu Tuc trunk road) with 3 bidding package .
27/06/2023 16:44
Trung tâm phát triển quỹ đất huyện Phú Xuyên publishes the plan Contractor selection plan (investment preparation step) for the project Move and return the medium and low voltage power system to serve the site clearance of the inter-commune road project Van Hoang - Hoang Long - Tri Trung - Phu Tuc (section from Noi Coi Bridge to Phu Tuc trunk road) with 3 bidding package .
27/06/2023 16:33
Trung tâm phát triển quỹ đất huyện Phú Xuyên publishes the plan Plan for selecting contractor (preparatory step for investment) project Moving and returning telecommunications technical infrastructure system for site clearance work of Bach Ha - Minh Tan inter-commune road project (phase 2) with 3 bidding package .
27/06/2023 15:55
Trung tâm phát triển quỹ đất huyện Phú Xuyên publishes the plan Contractor selection plan (preparatory step for investment) project Moving and returning low-voltage power system for site clearance of Bach Ha - Minh Tan inter-commune road project (phase 2) with 3 bidding package .
27/06/2023 14:47
Trung tâm phát triển quỹ đất huyện Phú Xuyên publishes the plan Contractor selection plan in the project investment preparation phase Moving and returning the 35KV medium voltage pole and line system for site clearance of the project Construction technical infrastructure for the auction of residential land use rights in Cong Dam area, village Mai Trang, Minh Tan Commune, Phu Xuyen District with 3 bidding package .
21/06/2023 15:05
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Trung tâm phát triển quỹ đất huyện Phú Xuyên has posted the request Contractor selection plan (investment preparation step) for the project: Moving and returning the medium- and low-voltage power systems to serve the site clearance of the project: Construction of infrastructure in Chau Can commune, Phu district Xuyen of the investor Trung tâm phát triển quỹ đất huyện Phú Xuyên with 3 bidding package.
20/07/2023 11:31
Bid solicitor Trung tâm phát triển quỹ đất huyện Phú Xuyên has posted Tender Notice Tender package No 11: Construction cost of the investor Trung tâm phát triển quỹ đất huyện Phú Xuyên with the form Open bidding.
15/07/2023 11:19
Trung tâm phát triển quỹ đất huyện Phú Xuyên Posted Development Investment Project Building a technical system for the auction of residential land use rights at the House of Culture, Thuong village, Chuyen My commune, Phu Xuyen district.
12/07/2023 09:09
Trung tâm phát triển quỹ đất huyện Phú Xuyên Posted Development Investment Project Moving and returning medium and low voltage power systems and transformer stations to serve site clearance of the project: Nam Tien A Kindergarten.
06/07/2023 14:14
The Bid solicitor Trung tâm phát triển quỹ đất huyện Phú Xuyên has posted the results of the bidding package Package 02: Cost of planning the total ground at the rate of 1/500, construction survey, preparation of economic and technical reports of the investor Trung tâm phát triển quỹ đất huyện Phú Xuyên.
05/07/2023 16:33
Trung tâm phát triển quỹ đất huyện Phú Xuyên Posted Development Investment Project Building a technical infrastructure for the auction of residential land use rights in the center of the commune, Tam Thuong village, Quang Lang commune.
04/07/2023 11:11
The Bid solicitor Trung tâm phát triển quỹ đất huyện Phú Xuyên has posted the request Contractor selection plan (investment preparation step) project of building technical infrastructure of residential land use right auction area in Mau Cua area (phase 2), Thuy Phu village, Nam Tien commune of the investor Trung tâm phát triển quỹ đất huyện Phú Xuyên with 3 bidding package.
03/07/2023 15:19
Trung tâm phát triển quỹ đất huyện Phú Xuyên Posted Development Investment Project Building a technical infrastructure for the auction of residential land use rights in the Mau Shop area (phase 2), Thuy Phu village, Nam Tien commune.
03/07/2023 14:14
The Bid solicitor Trung tâm phát triển quỹ đất huyện Phú Xuyên has posted the results of the bidding package Package 01: Cost of mapping the current status of 1/500 scale, land clearance cadastral map of 1/500 scale, planting site clearance landmarks of the investor Trung tâm phát triển quỹ đất huyện Phú Xuyên.
01/07/2023 11:09
The Bid solicitor Trung tâm phát triển quỹ đất huyện Phú Xuyên has posted the request Contractor selection plan (investment preparation step) for the work of Moving and returning the telecommunications technical infrastructure system to serve the site clearance of the inter-commune road project Van Hoang - Hoang Long - Tri Trung - Phu Tuc (section from Noi Coi bridge to Phu Tuc trunk road) of the investor Trung tâm phát triển quỹ đất huyện Phú Xuyên with 3 bidding package.
27/06/2023 16:44
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trung tâm phát triển quỹ đất huyện Phú Xuyên has posted 24 of the contractor selection plan, which contains 73 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trung tâm phát triển quỹ đất huyện Phú Xuyên has posted 4 Tender Notice in the 3 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trung tâm phát triển quỹ đất huyện Phú Xuyên has posted 10 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 10 package, canceled the bid 0 package (among the bidding packages above).
- There are 10 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: Investor Trung tâm phát triển quỹ đất huyện Phú Xuyên has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm phát triển quỹ đất huyện Phú Xuyên is the investor of 4 package, of which 4 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm phát triển quỹ đất huyện Phú Xuyên is the owner of 24 contractor selection plan. In which, they self-invite 24 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Trung tâm phát triển quỹ đất huyện Phú Xuyên is the investor of 26 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code