Data analysis results of DauThau.info software for bid solicitors Trung tâm Phát triển quỹ đất huyện Mê Linh as follows:
- Has relationships with 2 contractor.
- Announced 4 investment development project, of which 4 projects have not yet announced the prequalification documents.
- Announced 9 contractor selection plans with a total of 31 bidding packages, of which 5 prequalification documents have not found the investment project.
- Has invited bids for 4 packages (with 4 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 2 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 29 packages that have not fully posted the contractor selection results. Of these 27 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 9,567,381,000 VND, of which the total winning bid value is: 9,544,490,000 VND.
- The savings rate is: 0.24%.
Data analysis results of DauThau.info software for bid solicitors Trung tâm Phát triển quỹ đất huyện Mê Linh as follows:
- Has relationships with 2 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 9,567,381,000 VND, in which the total winning value is: 9,544,490,000 VND.
- The savings rate is: 0.24%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 4 investment and development projects.
- As the owner of 9 Contractor selection plan in which 9 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 4 bidding packages in which 4 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Trung tâm Phát triển quỹ đất huyện Mê Linh has posted the request The plan for selecting contractors for the remaining bidding packages for the construction project of the resettlement area at the resettlement site-VK serving the site clearance of sections of the investment project to build Ring Road 4- Ha Noi Capital Region, the section through the area. Van Khe commune, Me Linh district of the investor Trung tâm Phát triển quỹ đất huyện Mê Linh with 3 bidding package.
20/07/2023 11:58
The Bid solicitor Trung tâm Phát triển quỹ đất huyện Mê Linh has posted the request Plan to select contractors for technical infrastructure construction projects to auction land use rights at point X3 in the countryside of Lang Gan, Van Loi village, Tam Dong commune, Me Linh district of the investor Trung tâm Phát triển quỹ đất huyện Mê Linh with 2 bidding package.
28/06/2023 13:47
Trung tâm Phát triển quỹ đất huyện Mê Linh Posted Development Investment Project Construction of technical infrastructure for auction of land use rights at point X3 in the field of Lang Gan, Van Loi village, Tam Dong commune, Me Linh district.
27/06/2023 16:16
The Bid solicitor Trung tâm Phát triển quỹ đất huyện Mê Linh has posted the results of the bidding package Package 04: Entire part of construction work of the investor Trung tâm Phát triển quỹ đất huyện Mê Linh.
09/06/2023 14:54
The Bid solicitor Trung tâm Phát triển quỹ đất huyện Mê Linh has posted the results of the bidding package Package 04: Entire part of construction work of the investor Trung tâm Phát triển quỹ đất huyện Mê Linh.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG CHU PHAN
09/06/2023 14:37
The Bid solicitor Trung tâm Phát triển quỹ đất huyện Mê Linh has posted the request Plan to select contractors for several project packages: Construction of resettlement areas at resettlement sites-VK serving site clearance of sections of ring road 4 construction investment project of the investor Trung tâm Phát triển quỹ đất huyện Mê Linh with 5 bidding package.
05/06/2023 09:38
Trung tâm Phát triển quỹ đất huyện Mê Linh Posted Development Investment Project Construction of resettlement areas at resettlement sites-VK in service of site clearance of sections of Ring Road 4 construction investment project - Hanoi capital region, section through Van Khe commune, Me Linh district.
05/06/2023 09:09
The Bid solicitor Trung tâm Phát triển quỹ đất huyện Mê Linh has posted the request Contractor selection plan in the project investment preparation stage: Construction of technical infrastructure of the land area for auction of land use rights at HL2 point, Me Linh commune, Me Linh district of the investor Trung tâm Phát triển quỹ đất huyện Mê Linh with 3 bidding package.
22/05/2023 08:58
The Bid solicitor Trung tâm Phát triển quỹ đất huyện Mê Linh has posted the request Plan for contractor selection in the stage of preparation for work investment (item): Demolition of works and structures on land, transportation of construction waste due to demolition of construction works, within the project site clearance landmark : Investment in construction of Ring road 4 - Hanoi Capital Region (section through Me Linh district) of the investor Trung tâm Phát triển quỹ đất huyện Mê Linh with 2 bidding package.
22/05/2023 08:37
Trung tâm Phát triển quỹ đất huyện Mê Linh Posted Development Investment Project Demolition of works and structures on land, transportation of construction waste due to demolition of construction works, within the project site clearance landmark: Investment and construction of Ring Road 4 - Hanoi Capital Region (section through the locality) Me Linh district table).
22/05/2023 08:08
The data sheet has been partially hidden, to see the full information please Login or Register
Trung tâm Phát triển quỹ đất huyện Mê Linh publishes the plan The plan for selecting contractors for the remaining bidding packages for the construction project of the resettlement area at the resettlement site-VK serving the site clearance of sections of the investment project to build Ring Road 4- Ha Noi Capital Region, the section through the area. Van Khe commune, Me Linh district with 3 bidding package .
20/07/2023 11:58
Trung tâm Phát triển quỹ đất huyện Mê Linh publishes the plan Plan to select contractors for technical infrastructure construction projects to auction land use rights at point X3 in the countryside of Lang Gan, Van Loi village, Tam Dong commune, Me Linh district with 2 bidding package .
28/06/2023 13:47
Trung tâm Phát triển quỹ đất huyện Mê Linh announced the results of the bid package Package 04: Entire part of construction work .
- Winning bidder: CÔNG TY CỔ PHẦN THƯƠNG MẠI PHÁT TRIỂN CÂY XANH TRƯỜNG VÂN
09/06/2023 14:54
Trung tâm Phát triển quỹ đất huyện Mê Linh announced the results of the bid package Package 04: Entire part of construction work .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG CHU PHAN
09/06/2023 14:37
Trung tâm Phát triển quỹ đất huyện Mê Linh publishes the plan Plan to select contractors for several project packages: Construction of resettlement areas at resettlement sites-VK serving site clearance of sections of ring road 4 construction investment project with 5 bidding package .
05/06/2023 09:38
Trung tâm Phát triển quỹ đất huyện Mê Linh publishes the plan Contractor selection plan in the project investment preparation stage: Construction of technical infrastructure of the land area for auction of land use rights at HL2 point, Me Linh commune, Me Linh district with 3 bidding package .
22/05/2023 08:58
Trung tâm Phát triển quỹ đất huyện Mê Linh publishes the plan Plan for contractor selection in the stage of preparation for work investment (item): Demolition of works and structures on land, transportation of construction waste due to demolition of construction works, within the project site clearance landmark : Investment in construction of Ring road 4 - Hanoi Capital Region (section through Me Linh district) with 2 bidding package .
22/05/2023 08:37
Trung tâm Phát triển quỹ đất huyện Mê Linh publishes Tender Notice Package 04: Entire part of construction work in the form Open bidding .
28/04/2023 14:28
Trung tâm Phát triển quỹ đất huyện Mê Linh publishes Tender Notice Package 04: Entire part of construction work in the form Open bidding .
28/04/2023 14:28
Trung tâm Phát triển quỹ đất huyện Mê Linh publishes Tender Notice Package 04: Entire part of construction work in the form Open bidding .
28/04/2023 14:28
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Trung tâm Phát triển quỹ đất huyện Mê Linh has posted the request The plan for selecting contractors for the remaining bidding packages for the construction project of the resettlement area at the resettlement site-VK serving the site clearance of sections of the investment project to build Ring Road 4- Ha Noi Capital Region, the section through the area. Van Khe commune, Me Linh district of the investor Trung tâm Phát triển quỹ đất huyện Mê Linh with 3 bidding package.
20/07/2023 11:58
The Bid solicitor Trung tâm Phát triển quỹ đất huyện Mê Linh has posted the request Plan to select contractors for technical infrastructure construction projects to auction land use rights at point X3 in the countryside of Lang Gan, Van Loi village, Tam Dong commune, Me Linh district of the investor Trung tâm Phát triển quỹ đất huyện Mê Linh with 2 bidding package.
28/06/2023 13:47
Trung tâm Phát triển quỹ đất huyện Mê Linh Posted Development Investment Project Construction of technical infrastructure for auction of land use rights at point X3 in the field of Lang Gan, Van Loi village, Tam Dong commune, Me Linh district.
27/06/2023 16:16
The Bid solicitor Trung tâm Phát triển quỹ đất huyện Mê Linh has posted the results of the bidding package Package 04: Entire part of construction work of the investor Trung tâm Phát triển quỹ đất huyện Mê Linh.
09/06/2023 14:54
The Bid solicitor Trung tâm Phát triển quỹ đất huyện Mê Linh has posted the results of the bidding package Package 04: Entire part of construction work of the investor Trung tâm Phát triển quỹ đất huyện Mê Linh.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG CHU PHAN
09/06/2023 14:37
The Bid solicitor Trung tâm Phát triển quỹ đất huyện Mê Linh has posted the request Plan to select contractors for several project packages: Construction of resettlement areas at resettlement sites-VK serving site clearance of sections of ring road 4 construction investment project of the investor Trung tâm Phát triển quỹ đất huyện Mê Linh with 5 bidding package.
05/06/2023 09:38
Trung tâm Phát triển quỹ đất huyện Mê Linh Posted Development Investment Project Construction of resettlement areas at resettlement sites-VK in service of site clearance of sections of Ring Road 4 construction investment project - Hanoi capital region, section through Van Khe commune, Me Linh district.
05/06/2023 09:09
The Bid solicitor Trung tâm Phát triển quỹ đất huyện Mê Linh has posted the request Contractor selection plan in the project investment preparation stage: Construction of technical infrastructure of the land area for auction of land use rights at HL2 point, Me Linh commune, Me Linh district of the investor Trung tâm Phát triển quỹ đất huyện Mê Linh with 3 bidding package.
22/05/2023 08:58
The Bid solicitor Trung tâm Phát triển quỹ đất huyện Mê Linh has posted the request Plan for contractor selection in the stage of preparation for work investment (item): Demolition of works and structures on land, transportation of construction waste due to demolition of construction works, within the project site clearance landmark : Investment in construction of Ring road 4 - Hanoi Capital Region (section through Me Linh district) of the investor Trung tâm Phát triển quỹ đất huyện Mê Linh with 2 bidding package.
22/05/2023 08:37
Trung tâm Phát triển quỹ đất huyện Mê Linh Posted Development Investment Project Demolition of works and structures on land, transportation of construction waste due to demolition of construction works, within the project site clearance landmark: Investment and construction of Ring Road 4 - Hanoi Capital Region (section through the locality) Me Linh district table).
22/05/2023 08:08
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trung tâm Phát triển quỹ đất huyện Mê Linh has posted 9 of the contractor selection plan, which contains 31 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trung tâm Phát triển quỹ đất huyện Mê Linh has posted 4 Tender Notice in the 4 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trung tâm Phát triển quỹ đất huyện Mê Linh has posted 2 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 2 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trung tâm Phát triển quỹ đất huyện Mê Linh has a relationship with 2 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm Phát triển quỹ đất huyện Mê Linh has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm Phát triển quỹ đất huyện Mê Linh is the investor of 4 package, of which 4 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm Phát triển quỹ đất huyện Mê Linh is the owner of 9 contractor selection plan. In which, they self-invite 9 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Trung tâm Phát triển quỹ đất huyện Mê Linh is an investor with 2 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm Phát triển quỹ đất huyện Mê Linh is the investor of 4 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register