Data analysis results of DauThau.info software for bid solicitors Trung tâm phát triển quỹ đất huyện ba vì as follows:
- Has relationships with 4 contractor.
- Announced 5 investment development project, of which 5 projects have not yet announced the prequalification documents.
- Announced 4 contractor selection plans with a total of 17 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 6 packages (with 7 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 16 packages that have not fully posted the contractor selection results. Of these 13 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 57.14%, Consultancy 42.86%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,836,567,000 VND, of which the total winning bid value is: 1,785,595,000 VND.
- The savings rate is: 2.78%.
Data analysis results of DauThau.info software for bid solicitors Trung tâm phát triển quỹ đất huyện ba vì as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 2.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 57.14%, Consulting 42.86%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,836,567,000 VND, in which the total winning value is: 1,785,595,000 VND.
- The savings rate is: 2.78%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 5 investment and development projects.
- As the owner of 4 Contractor selection plan in which 4 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 7 bidding packages in which 7 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted the results of the bidding package Package 03: The whole construction part of the investor Trung tâm phát triển quỹ đất huyện ba vì.
07/07/2023 09:26
Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted Tender Notice Package 03: The whole construction part of the investor Trung tâm phát triển quỹ đất huyện ba vì with the form Open bidding.
04/07/2023 08:52
Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted Tender Notice Tender package No 03: Consulting on topographic survey, preparation of technical plan, cost estimate of the investor Trung tâm phát triển quỹ đất huyện ba vì with the form Open bidding.
30/06/2023 11:09
Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted Tender Notice Package 03: The whole construction part of the investor Trung tâm phát triển quỹ đất huyện ba vì with the form Open bidding.
28/06/2023 16:21
The Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted the results of the bidding package Package 02: Survey and design - estimate of the investor Trung tâm phát triển quỹ đất huyện ba vì.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ PHÁT TRIỂN ĐIỆN LỰC HÀ NỘI
20/06/2023 16:38
Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted Tender Notice Package 07: The whole construction part of the investor Trung tâm phát triển quỹ đất huyện ba vì with the form Open bidding.
20/06/2023 14:45
Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted Tender Notice Package 03: The whole construction part of the investor Trung tâm phát triển quỹ đất huyện ba vì with the form Open bidding.
31/05/2023 14:51
The Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted the request Relocating Trung voltage and substation road of Ba Vi Power Company under the Project: Renovating and upgrading provincial road 414C to Thuan My commune (connecting Suoi Hai tourist area with Thuan My hot mineral water resort), district Ba Vi of the investor Trung tâm phát triển quỹ đất huyện ba vì with 3 bidding package.
31/05/2023 10:11
Trung tâm phát triển quỹ đất huyện ba vì Posted Development Investment Project Relocating Trung voltage and substation road of Ba Vi Power Company under the Project: Renovating and upgrading provincial road 414C to Thuan My commune (connecting Suoi Hai tourist area with Thuan My hot mineral water resort), district Ba Vi.
31/05/2023 10:10
The Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted the request Moving the 0.4kV power line of Ba Vi Power Company under the Project: Renovating and upgrading provincial road 414C to Thuan My commune (connecting Suoi Hai tourist area with Thuan My hot mineral water resort), district Ba Vi of the investor Trung tâm phát triển quỹ đất huyện ba vì with 5 bidding package.
31/05/2023 09:49
The data sheet has been partially hidden, to see the full information please Login or Register
Trung tâm phát triển quỹ đất huyện ba vì announced the results of the bid package Package 03: The whole construction part .
- Winning bidder:
07/07/2023 09:26
Trung tâm phát triển quỹ đất huyện ba vì publishes Tender Notice Package 03: The whole construction part in the form Open bidding .
04/07/2023 08:52
Trung tâm phát triển quỹ đất huyện ba vì publishes Tender Notice Tender package No 03: Consulting on topographic survey, preparation of technical plan, cost estimate in the form Open bidding .
30/06/2023 11:09
Trung tâm phát triển quỹ đất huyện ba vì publishes Tender Notice Package 03: The whole construction part in the form Open bidding .
28/06/2023 16:21
Trung tâm phát triển quỹ đất huyện ba vì announced the results of the bid package Package 02: Survey and design - estimate .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ PHÁT TRIỂN ĐIỆN LỰC HÀ NỘI
20/06/2023 16:38
Trung tâm phát triển quỹ đất huyện ba vì publishes Tender Notice Package 07: The whole construction part in the form Open bidding .
20/06/2023 14:45
Trung tâm phát triển quỹ đất huyện ba vì publishes Tender Notice Package 03: The whole construction part in the form Open bidding .
31/05/2023 14:51
Trung tâm phát triển quỹ đất huyện ba vì publishes the plan Relocating Trung voltage and substation road of Ba Vi Power Company under the Project: Renovating and upgrading provincial road 414C to Thuan My commune (connecting Suoi Hai tourist area with Thuan My hot mineral water resort), district Ba Vi with 3 bidding package .
31/05/2023 10:11
Trung tâm phát triển quỹ đất huyện ba vì publishes the plan Moving the 0.4kV power line of Ba Vi Power Company under the Project: Renovating and upgrading provincial road 414C to Thuan My commune (connecting Suoi Hai tourist area with Thuan My hot mineral water resort), district Ba Vi with 5 bidding package .
31/05/2023 09:49
Trung tâm phát triển quỹ đất huyện ba vì publishes the plan Construction of technical infrastructure for land use right auction area in Doc Ky area, La Thien village, Tan Hong commune with 6 bidding package .
27/05/2023 15:58
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted the results of the bidding package Package 03: The whole construction part of the investor Trung tâm phát triển quỹ đất huyện ba vì.
07/07/2023 09:26
Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted Tender Notice Package 03: The whole construction part of the investor Trung tâm phát triển quỹ đất huyện ba vì with the form Open bidding.
04/07/2023 08:52
Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted Tender Notice Tender package No 03: Consulting on topographic survey, preparation of technical plan, cost estimate of the investor Trung tâm phát triển quỹ đất huyện ba vì with the form Open bidding.
30/06/2023 11:09
Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted Tender Notice Package 03: The whole construction part of the investor Trung tâm phát triển quỹ đất huyện ba vì with the form Open bidding.
28/06/2023 16:21
The Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted the results of the bidding package Package 02: Survey and design - estimate of the investor Trung tâm phát triển quỹ đất huyện ba vì.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ PHÁT TRIỂN ĐIỆN LỰC HÀ NỘI
20/06/2023 16:38
Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted Tender Notice Package 07: The whole construction part of the investor Trung tâm phát triển quỹ đất huyện ba vì with the form Open bidding.
20/06/2023 14:45
Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted Tender Notice Package 03: The whole construction part of the investor Trung tâm phát triển quỹ đất huyện ba vì with the form Open bidding.
31/05/2023 14:51
The Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted the request Relocating Trung voltage and substation road of Ba Vi Power Company under the Project: Renovating and upgrading provincial road 414C to Thuan My commune (connecting Suoi Hai tourist area with Thuan My hot mineral water resort), district Ba Vi of the investor Trung tâm phát triển quỹ đất huyện ba vì with 3 bidding package.
31/05/2023 10:11
Trung tâm phát triển quỹ đất huyện ba vì Posted Development Investment Project Relocating Trung voltage and substation road of Ba Vi Power Company under the Project: Renovating and upgrading provincial road 414C to Thuan My commune (connecting Suoi Hai tourist area with Thuan My hot mineral water resort), district Ba Vi.
31/05/2023 10:10
The Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted the request Moving the 0.4kV power line of Ba Vi Power Company under the Project: Renovating and upgrading provincial road 414C to Thuan My commune (connecting Suoi Hai tourist area with Thuan My hot mineral water resort), district Ba Vi of the investor Trung tâm phát triển quỹ đất huyện ba vì with 5 bidding package.
31/05/2023 09:49
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trung tâm phát triển quỹ đất huyện ba vì has posted 4 of the contractor selection plan, which contains 17 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted 7 Tender Notice in the 6 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trung tâm phát triển quỹ đất huyện ba vì has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm phát triển quỹ đất huyện ba vì has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm phát triển quỹ đất huyện ba vì is the investor of 7 package, of which 7 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm phát triển quỹ đất huyện ba vì is the owner of 4 contractor selection plan. In which, they self-invite 4 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Trung tâm phát triển quỹ đất huyện ba vì is an investor with 4 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm phát triển quỹ đất huyện ba vì is the investor of 5 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register