Data analysis results of DauThau.info software for bid solicitors TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA as follows:
- Has relationships with 1 contractor.
- Announced 18 investment development project, of which 17 projects have not yet announced the prequalification documents.
- Announced 30 contractor selection plans with a total of 100 bidding packages, of which 17 prequalification documents have not found the investment project.
- Has invited bids for 3 packages (with 3 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 97 packages that have not fully posted the contractor selection results. Of these 78 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 33.33%, Construction 0%, Consultancy 0%, Non-consultancy 66.67%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 656,480,000 VND, of which the total winning bid value is: 655,600,000 VND.
- The savings rate is: 0.13%.
Data analysis results of DauThau.info software for bid solicitors TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA as follows:
- Has relationships with 1 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 33.33%, Construction 0%, Consulting 0%, Non-consulting 66.67%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 656,480,000 VND, in which the total winning value is: 655,600,000 VND.
- The savings rate is: 0.13%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 18 investment and development projects.
- As the owner of 30 Contractor selection plan in which 30 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 142 bidding packages in which 3 packages are self-invited, and 139 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA Posted Development Investment Project 220kV substation connected to the level in 500kV Pho Noi substation.
09/07/2023 22:22
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA Posted Development Investment Project Project: 500kV Thanh Hoa substation.
06/07/2023 15:15
The Bid solicitor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA has posted the request Planning and construction phase 3 project of upgrading power system, protecting 220kV . substations of the investor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA with 6 bidding package.
04/07/2023 09:24
The Bid solicitor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA has posted the results of the bidding package Buy gifts to celebrate the 15th anniversary of the establishment of EVNNPT of the investor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA.
- Winning bidder: CÔNG TY CỔ PHẦN SÁNG TẠO NGHỆ THUẬT VÀ SỰ KIỆN SUN BRIGHT
30/06/2023 19:27
The Bid solicitor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA has posted the request 3rd Phase - Project: 220kV Nha Trang - Thap Cham transmission line of the investor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA with 4 bidding package.
29/06/2023 14:49
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA Posted Development Investment Project Project: 220kV Nha Trang - Thap Cham transmission line.
29/06/2023 14:14
The Bid solicitor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA has posted the request Construction of training site for operation management staff of PTC2 . substation of the investor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA with 8 bidding package.
26/06/2023 16:06
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA Posted Development Investment Project Construction of training site for operation management staff of PTC2 . substation.
26/06/2023 14:14
The Bid solicitor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA has posted the request LCNT phase 3, Go Cong and Go Cong - Can Duoc area (Package 19) of the investor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA with 1 bidding package.
22/06/2023 15:37
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA Posted Development Investment Project Go Cong 220 kV transformer station and Go Cong - Can Duoc connection line.
22/06/2023 15:15
The data sheet has been partially hidden, to see the full information please Login or Register
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA publishes the plan Planning and construction phase 3 project of upgrading power system, protecting 220kV . substations with 6 bidding package .
04/07/2023 09:24
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA announced the results of the bid package Buy gifts to celebrate the 15th anniversary of the establishment of EVNNPT .
- Winning bidder: CÔNG TY CỔ PHẦN SÁNG TẠO NGHỆ THUẬT VÀ SỰ KIỆN SUN BRIGHT
30/06/2023 19:27
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA publishes the plan 3rd Phase - Project: 220kV Nha Trang - Thap Cham transmission line with 4 bidding package .
29/06/2023 14:49
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA publishes the plan Construction of training site for operation management staff of PTC2 . substation with 8 bidding package .
26/06/2023 16:06
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA publishes the plan LCNT phase 3, Go Cong and Go Cong - Can Duoc area (Package 19) with 1 bidding package .
22/06/2023 15:37
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA publishes the plan Plan for selecting contractor for phase 3 - Hai Hau 220 kV substation project and connection lines with 19 bidding package .
19/06/2023 17:55
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA publishes the plan Adjustment of urban planning phase 3 - Project: An Khe 220kV substation and connection with 1 bidding package .
16/06/2023 16:18
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA publishes Tender Notice Rent email service of EVNNPT in the form Competitive Offer .
16/06/2023 16:08
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA publishes the plan Plan for selecting contractor for phase 3 - 220kV Son La - Dien Bien transmission line project with 16 bidding package .
13/06/2023 14:07
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA publishes the plan Approving the 4th phase contractor selection plan for the Project: Installing 2 220kV Chu Se substations with 2 bidding package .
12/06/2023 13:57
The data sheet has been partially hidden, to see the full information please Login or Register
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA Posted Development Investment Project 220kV substation connected to the level in 500kV Pho Noi substation.
09/07/2023 22:22
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA Posted Development Investment Project Project: 500kV Thanh Hoa substation.
06/07/2023 15:15
The Bid solicitor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA has posted the request Planning and construction phase 3 project of upgrading power system, protecting 220kV . substations of the investor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA with 6 bidding package.
04/07/2023 09:24
The Bid solicitor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA has posted the results of the bidding package Buy gifts to celebrate the 15th anniversary of the establishment of EVNNPT of the investor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA.
- Winning bidder: CÔNG TY CỔ PHẦN SÁNG TẠO NGHỆ THUẬT VÀ SỰ KIỆN SUN BRIGHT
30/06/2023 19:27
The Bid solicitor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA has posted the request 3rd Phase - Project: 220kV Nha Trang - Thap Cham transmission line of the investor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA with 4 bidding package.
29/06/2023 14:49
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA Posted Development Investment Project Project: 220kV Nha Trang - Thap Cham transmission line.
29/06/2023 14:14
The Bid solicitor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA has posted the request Construction of training site for operation management staff of PTC2 . substation of the investor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA with 8 bidding package.
26/06/2023 16:06
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA Posted Development Investment Project Construction of training site for operation management staff of PTC2 . substation.
26/06/2023 14:14
The Bid solicitor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA has posted the request LCNT phase 3, Go Cong and Go Cong - Can Duoc area (Package 19) of the investor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA with 1 bidding package.
22/06/2023 15:37
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA Posted Development Investment Project Go Cong 220 kV transformer station and Go Cong - Can Duoc connection line.
22/06/2023 15:15
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA has posted 30 of the contractor selection plan, which contains 100 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA has posted 3 Tender Notice in the 3 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA has a relationship with 1 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA is the investor of 142 package, of which 3 package is self-invited, other units invite bid 139 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA is the owner of 30 contractor selection plan. In which, they self-invite 30 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA is an investor with 14 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA is the investor of 18 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register