Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Lữ đoàn 80/Quân khu 4 as follows:
- Has relationships with 0 contractor.
- Announced 3 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 2 contractor selection plans with a total of 6 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 5 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 13,978,000 VND, of which the total winning bid value is: 13,978,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Lữ đoàn 80/Quân khu 4 as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 13,978,000 VND, in which the total winning value is: 13,978,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 3 investment and development projects.
- As the owner of 2 Contractor selection plan in which 2 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 6 bidding packages in which 0 packages are self-invited, and 6 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted the results of the bidding package Tender Package No. TV-02: Preparation of Bid Documents, Evaluation of Bid for Construction of the investor Lữ đoàn 80/Quân khu 4.
26/06/2023 10:02
The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted the request Contractor selection plan (phase 2): Tennis court/ Information Brigade 80/Military zone 4 of the investor Lữ đoàn 80/Quân khu 4 with 3 bidding package.
15/06/2023 10:07
The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted the request The stands, the road to review the TT80 Brigade / Military Region 4 of the investor Lữ đoàn 80/Quân khu 4 with 3 bidding package.
15/06/2023 09:52
Lữ đoàn 80/Quân khu 4 Posted Development Investment Project The stands, the road to review the TT80 Brigade / Military Region 4.
15/06/2023 09:09
Lữ đoàn 80/Quân khu 4 Posted Development Investment Project Tennis Court/ Information Brigade 80/ Military Region 4.
15/06/2023 09:09
Lữ đoàn 80/Quân khu 4 Posted Development Investment Project Tennis Court/80th Brigade Information 80/Military Region 4.
09/04/2023 07:07
The data sheet has been partially hidden, to see the full information please Login or Register
Lữ đoàn 80/Quân khu 4 announced the results of the bid package Tender Package No. TV-02: Preparation of Bid Documents, Evaluation of Bid for Construction .
- Winning bidder:
26/06/2023 10:02
Lữ đoàn 80/Quân khu 4 publishes the plan Contractor selection plan (phase 2): Tennis court/ Information Brigade 80/Military zone 4 with 3 bidding package .
15/06/2023 10:07
Lữ đoàn 80/Quân khu 4 publishes the plan The stands, the road to review the TT80 Brigade / Military Region 4 with 3 bidding package .
15/06/2023 09:52
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted the results of the bidding package Tender Package No. TV-02: Preparation of Bid Documents, Evaluation of Bid for Construction of the investor Lữ đoàn 80/Quân khu 4.
26/06/2023 10:02
The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted the request Contractor selection plan (phase 2): Tennis court/ Information Brigade 80/Military zone 4 of the investor Lữ đoàn 80/Quân khu 4 with 3 bidding package.
15/06/2023 10:07
The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted the request The stands, the road to review the TT80 Brigade / Military Region 4 of the investor Lữ đoàn 80/Quân khu 4 with 3 bidding package.
15/06/2023 09:52
Lữ đoàn 80/Quân khu 4 Posted Development Investment Project The stands, the road to review the TT80 Brigade / Military Region 4.
15/06/2023 09:09
Lữ đoàn 80/Quân khu 4 Posted Development Investment Project Tennis Court/ Information Brigade 80/ Military Region 4.
15/06/2023 09:09
Lữ đoàn 80/Quân khu 4 Posted Development Investment Project Tennis Court/80th Brigade Information 80/Military Region 4.
09/04/2023 07:07
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Lữ đoàn 80/Quân khu 4 has posted 2 of the contractor selection plan, which contains 6 of the bidding package. See full list here
Summary: The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: Investor Lữ đoàn 80/Quân khu 4 has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Lữ đoàn 80/Quân khu 4 is the owner of 2 contractor selection plan. In which, they self-invite 2 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Lữ đoàn 80/Quân khu 4 is the investor of 3 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code