Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Cục Đường bộ Việt Nam as follows:
- Has relationships with 0 contractor.
- Announced 21 investment development project, of which 21 projects have not yet announced the prequalification documents.
- Announced 25 contractor selection plans with a total of 65 bidding packages, of which 20 prequalification documents have not found the investment project.
- Has invited bids for 2 packages (with 2 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 57 packages that have not fully posted the contractor selection results. Of these 50 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Cục Đường bộ Việt Nam as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 21 investment and development projects.
- As the owner of 25 Contractor selection plan in which 25 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 99 bidding packages in which 2 packages are self-invited, and 97 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Cục Đường bộ Việt Nam has posted the request Approving additional contractor selection plan Works: Repairing damage to road surface and works Km163+00-Km163+600, Km164+00-Km164+500, Km164+900-Km166+330, Km167+100- Km167+350, Km168+00-Km169+650, Km170+400-Km171+500, Repair of longitudinal grooves Km166+050-Km166+100(PT), Km166+560-Km166+700(PT), Km169+600- Km169+820(PT),
National Highway 2, Tuyen Quang province of the investor Cục Đường bộ Việt Nam with 3 bidding package.
20/07/2023 10:38
The Bid solicitor Cục Đường bộ Việt Nam has posted the request Approving additional cost of inspection and contractor selection plan for package No. 6: Consulting for project quality inspection: Repairing road surface sections Km1430+000 - Km1433+200(P), Km1449+300 - Km1449+800 National Highway 1, Khanh Hoa province. of the investor Cục Đường bộ Việt Nam with 1 bidding package.
20/07/2023 10:34
The Bid solicitor Cục Đường bộ Việt Nam has posted the request About the additional approval of contractor selection plan Works: Repairing damaged road surface section Km173+00 – Km175+00 National Highway 6, Son La province of the investor Cục Đường bộ Việt Nam with 3 bidding package.
19/07/2023 16:25
The Bid solicitor Cục Đường bộ Việt Nam has posted the request Regarding the additional approval of contractor selection plan Works: Repairing damage to the road surface section Km128+670 – Km130+880, Km135 – Km135+650, National Highway 10, Nam Dinh province. of the investor Cục Đường bộ Việt Nam with 3 bidding package.
19/07/2023 16:12
Cục Đường bộ Việt Nam Posted Development Investment Project Local repair of road surface, road section Km64+900 - Km65+370; Km71+300 - Km72+600; Km74+500 - Km76+100; Km88+00 - Km88+200; Km117+100 - Km117+500; Repairing the roadside of the section Km56+930 – Km64+900; Repairing drainage ditch at section Km90+140 - Km94+800; Adding a local longitudinal trench at the section Km101+070 - Km138+745 of Ho Chi Minh road (Western branch), Quang Binh province.
14/07/2023 16:16
Cục Đường bộ Việt Nam Posted Development Investment Project Repairing damage to foundation, road surface and traffic safety system at sections Km262+322 - Km262+925, Km273+685 - Km274+010, Km287+980 – Km288+110, Km288+605 - Km288+882, Km291 +890 - Km292+100, Km292+120 - Km292+451, Km292+466 - Km292+634, Km295+290 - Km295+500, Km299+690 - Km300+010, Ho Chi Minh Road (West Branch), Quang Province Treatment.
14/07/2023 15:15
Cục Đường bộ Việt Nam Posted Development Investment Project Ta Luong bridge repair Km57+222; Additional inspection level for Cross bridges Km64+520; Aluminum Km65+216; Dry Km65+782; Dry Km67+853; Land Km68+038; Land Km69+559; Land Km69+812; Land Km70+363; Crow Mine Km71+883, National Highway 49, Thua Thien Hue province.
13/07/2023 15:15
Cục Đường bộ Việt Nam Posted Development Investment Project Repairing Dakrong bridge Km249+824, Ho Chi Minh road (West branch), Quang Tri province.
13/07/2023 15:15
Cục Đường bộ Việt Nam Posted Development Investment Project Repairing damage to foundation and road surface sections from Km121+00 - Km121+350, Km123+00 - Km123+570, Km136+090 - Km137+500, Km138+1000 - Km139+00, Km139+350 - Km139+800 , Km141+670 - Km142+370, Km145+600 - Km145+650, Km145+950 - Km146+600, National Highway 7, Nghe An province..
13/07/2023 10:10
The data sheet has been partially hidden, to see the full information please Login or Register
Cục Đường bộ Việt Nam publishes the plan Approving additional contractor selection plan Works: Repairing damage to road surface and works Km163+00-Km163+600, Km164+00-Km164+500, Km164+900-Km166+330, Km167+100- Km167+350, Km168+00-Km169+650, Km170+400-Km171+500, Repair of longitudinal grooves Km166+050-Km166+100(PT), Km166+560-Km166+700(PT), Km169+600- Km169+820(PT),
National Highway 2, Tuyen Quang province with 3 bidding package .
20/07/2023 10:38
Cục Đường bộ Việt Nam publishes the plan Approving additional cost of inspection and contractor selection plan for package No. 6: Consulting for project quality inspection: Repairing road surface sections Km1430+000 - Km1433+200(P), Km1449+300 - Km1449+800 National Highway 1, Khanh Hoa province. with 1 bidding package .
20/07/2023 10:34
Cục Đường bộ Việt Nam publishes the plan About the additional approval of contractor selection plan Works: Repairing damaged road surface section Km173+00 – Km175+00 National Highway 6, Son La province with 3 bidding package .
19/07/2023 16:25
Cục Đường bộ Việt Nam publishes the plan Regarding the additional approval of contractor selection plan Works: Repairing damage to the road surface section Km128+670 – Km130+880, Km135 – Km135+650, National Highway 10, Nam Dinh province. with 3 bidding package .
19/07/2023 16:12
Cục Đường bộ Việt Nam publishes the plan The plan to select contractors for the equipment rental package to implement the Ministry-level Science and Technology project "Research and application of carbon fiber reinforced concrete in the repair of reinforced concrete bridge girders", code DT2309 with 2 bidding package .
07/07/2023 10:36
Cục Đường bộ Việt Nam publishes the plan Plan to select contractors for bidding packages to propagate and disseminate the law on traffic safety in the road sector on the mass media in 2023 with 10 bidding package .
03/07/2023 15:21
Cục Đường bộ Việt Nam publishes the plan The contractor selection plan for the preparation of the feasibility study report, Works: Repairing to ensure traffic safety, completing the traffic safety system at sections Km2290+330 - Km2290+730; Km2291+360 - Km2291+760; Km2292+500 - Km2293+300; Km2295+420 - Km2296+310, National Highway 1, Ca Mau province with 2 bidding package .
24/06/2023 14:43
Cục Đường bộ Việt Nam publishes the plan Contractor selection plan for preparation of economic - technical reports, Works: Repairing traffic warning lights Km2163+300, Km2165+110, Km2186+670, Km2218+300, Km2218+600, Km2219+ 260, Km2219+780, Km2231+350, Km2250+400, Km2279+400, National Highway 1, Soc Trang Province, Bac Lieu, Ca Mau with 4 bidding package .
15/06/2023 10:00
Cục Đường bộ Việt Nam publishes the plan Construction and operation of the website of the Vietnam Road Administration with 1 bidding package .
13/06/2023 17:01
Cục Đường bộ Việt Nam publishes Tender Notice Tender package: "Purchase printer for international driving license" in the form Competitive Offer .
09/06/2023 10:13
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Cục Đường bộ Việt Nam has posted the request Approving additional contractor selection plan Works: Repairing damage to road surface and works Km163+00-Km163+600, Km164+00-Km164+500, Km164+900-Km166+330, Km167+100- Km167+350, Km168+00-Km169+650, Km170+400-Km171+500, Repair of longitudinal grooves Km166+050-Km166+100(PT), Km166+560-Km166+700(PT), Km169+600- Km169+820(PT),
National Highway 2, Tuyen Quang province of the investor Cục Đường bộ Việt Nam with 3 bidding package.
20/07/2023 10:38
The Bid solicitor Cục Đường bộ Việt Nam has posted the request Approving additional cost of inspection and contractor selection plan for package No. 6: Consulting for project quality inspection: Repairing road surface sections Km1430+000 - Km1433+200(P), Km1449+300 - Km1449+800 National Highway 1, Khanh Hoa province. of the investor Cục Đường bộ Việt Nam with 1 bidding package.
20/07/2023 10:34
The Bid solicitor Cục Đường bộ Việt Nam has posted the request About the additional approval of contractor selection plan Works: Repairing damaged road surface section Km173+00 – Km175+00 National Highway 6, Son La province of the investor Cục Đường bộ Việt Nam with 3 bidding package.
19/07/2023 16:25
The Bid solicitor Cục Đường bộ Việt Nam has posted the request Regarding the additional approval of contractor selection plan Works: Repairing damage to the road surface section Km128+670 – Km130+880, Km135 – Km135+650, National Highway 10, Nam Dinh province. of the investor Cục Đường bộ Việt Nam with 3 bidding package.
19/07/2023 16:12
Cục Đường bộ Việt Nam Posted Development Investment Project Local repair of road surface, road section Km64+900 - Km65+370; Km71+300 - Km72+600; Km74+500 - Km76+100; Km88+00 - Km88+200; Km117+100 - Km117+500; Repairing the roadside of the section Km56+930 – Km64+900; Repairing drainage ditch at section Km90+140 - Km94+800; Adding a local longitudinal trench at the section Km101+070 - Km138+745 of Ho Chi Minh road (Western branch), Quang Binh province.
14/07/2023 16:16
Cục Đường bộ Việt Nam Posted Development Investment Project Repairing damage to foundation, road surface and traffic safety system at sections Km262+322 - Km262+925, Km273+685 - Km274+010, Km287+980 – Km288+110, Km288+605 - Km288+882, Km291 +890 - Km292+100, Km292+120 - Km292+451, Km292+466 - Km292+634, Km295+290 - Km295+500, Km299+690 - Km300+010, Ho Chi Minh Road (West Branch), Quang Province Treatment.
14/07/2023 15:15
Cục Đường bộ Việt Nam Posted Development Investment Project Ta Luong bridge repair Km57+222; Additional inspection level for Cross bridges Km64+520; Aluminum Km65+216; Dry Km65+782; Dry Km67+853; Land Km68+038; Land Km69+559; Land Km69+812; Land Km70+363; Crow Mine Km71+883, National Highway 49, Thua Thien Hue province.
13/07/2023 15:15
Cục Đường bộ Việt Nam Posted Development Investment Project Repairing Dakrong bridge Km249+824, Ho Chi Minh road (West branch), Quang Tri province.
13/07/2023 15:15
Cục Đường bộ Việt Nam Posted Development Investment Project Repairing damage to foundation and road surface sections from Km121+00 - Km121+350, Km123+00 - Km123+570, Km136+090 - Km137+500, Km138+1000 - Km139+00, Km139+350 - Km139+800 , Km141+670 - Km142+370, Km145+600 - Km145+650, Km145+950 - Km146+600, National Highway 7, Nghe An province..
13/07/2023 10:10
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Cục Đường bộ Việt Nam has posted 25 of the contractor selection plan, which contains 65 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Cục Đường bộ Việt Nam has posted 2 Tender Notice in the 2 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Cục Đường bộ Việt Nam has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Cục Đường bộ Việt Nam is the investor of 99 package, of which 2 package is self-invited, other units invite bid 97 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Cục Đường bộ Việt Nam is the owner of 25 contractor selection plan. In which, they self-invite 25 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Cục Đường bộ Việt Nam is an investor with 39 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Cục Đường bộ Việt Nam is the investor of 21 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code