Data analysis results of DauThau.info software for bid solicitors Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa as follows:
- Has relationships with 0 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 4 contractor selection plans with a total of 4 bidding packages, of which 4 prequalification documents have not found the investment project.
- Has invited bids for 5 packages (with 5 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 4 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 60.00%, Construction 40.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 60.00%, Construction 40.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 4 Contractor selection plan in which 4 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 5 bidding packages in which 5 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Bid solicitor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted Tender Notice Construction to ensure the safe operation of the 500kV transmission line in the hot season in the Thanh Hoa Power Transmission area of the investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa with the form Shortened competitive offer.
12/07/2023 23:18
The Bid solicitor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted the request Construction of 500kV . transmission lines of the investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa with 1 bidding package.
05/07/2023 16:32
Bid solicitor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted Tender Notice Supplying materials for regular repair works of Bim Son 220kV substation of the investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa with the form Shortened competitive offer.
20/06/2023 17:16
The Bid solicitor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted the request Supplying materials for regular repair works of Bim Son 220kV substation of the investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa with 1 bidding package.
19/06/2023 21:48
The Bid solicitor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted the request The third phase of contractor selection plan: 220 kV transmission line project of Nam Sum - Nong Cong cutting station (the part of the line in the territory of Vietnam) of the investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa with 1 bidding package.
14/06/2023 14:44
Bid solicitor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted Tender Notice Procurement of leakage current measuring instruments for resistive components of substation valve lightning arresters for production of the investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa with the form Shortened competitive offer.
30/05/2023 10:34
The Bid solicitor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted the request Procurement of leakage current measuring instruments for resistive components of substation valve lightning arresters for production of the investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa with 1 bidding package.
26/05/2023 16:09
Bid solicitor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted Tender Notice Procurement of tools and equipment for occupational safety - hygiene - fire prevention in 2023 - Thanh Hoa power transmission of the investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa with the form Open bidding.
20/04/2023 22:55
Bid solicitor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted Tender Notice Package 02TC/SCL TH2023 Construction: Handling and leveling of phase-earth distance between columns 215 - 216 500kV transmission lines 584,564 Nghi Son 2 - 571;572 T500 Nho Quan (T500NQ) single circuit of the investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa with the form Shortened competitive offer.
07/04/2023 10:34
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa publishes Tender Notice Construction to ensure the safe operation of the 500kV transmission line in the hot season in the Thanh Hoa Power Transmission area in the form Shortened competitive offer .
12/07/2023 23:18
Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa publishes the plan Construction of 500kV . transmission lines with 1 bidding package .
05/07/2023 16:32
Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa publishes Tender Notice Supplying materials for regular repair works of Bim Son 220kV substation in the form Shortened competitive offer .
20/06/2023 17:16
Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa publishes the plan Supplying materials for regular repair works of Bim Son 220kV substation with 1 bidding package .
19/06/2023 21:48
Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa publishes the plan The third phase of contractor selection plan: 220 kV transmission line project of Nam Sum - Nong Cong cutting station (the part of the line in the territory of Vietnam) with 1 bidding package .
14/06/2023 14:44
Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa publishes Tender Notice Procurement of leakage current measuring instruments for resistive components of substation valve lightning arresters for production in the form Shortened competitive offer .
30/05/2023 10:34
Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa publishes the plan Procurement of leakage current measuring instruments for resistive components of substation valve lightning arresters for production with 1 bidding package .
26/05/2023 16:09
Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa publishes Tender Notice Procurement of tools and equipment for occupational safety - hygiene - fire prevention in 2023 - Thanh Hoa power transmission in the form Open bidding .
20/04/2023 22:55
Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa publishes Tender Notice Package 02TC/SCL TH2023 Construction: Handling and leveling of phase-earth distance between columns 215 - 216 500kV transmission lines 584,564 Nghi Son 2 - 571;572 T500 Nho Quan (T500NQ) single circuit in the form Shortened competitive offer .
07/04/2023 10:34
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted Tender Notice Construction to ensure the safe operation of the 500kV transmission line in the hot season in the Thanh Hoa Power Transmission area of the investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa with the form Shortened competitive offer.
12/07/2023 23:18
The Bid solicitor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted the request Construction of 500kV . transmission lines of the investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa with 1 bidding package.
05/07/2023 16:32
Bid solicitor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted Tender Notice Supplying materials for regular repair works of Bim Son 220kV substation of the investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa with the form Shortened competitive offer.
20/06/2023 17:16
The Bid solicitor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted the request Supplying materials for regular repair works of Bim Son 220kV substation of the investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa with 1 bidding package.
19/06/2023 21:48
The Bid solicitor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted the request The third phase of contractor selection plan: 220 kV transmission line project of Nam Sum - Nong Cong cutting station (the part of the line in the territory of Vietnam) of the investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa with 1 bidding package.
14/06/2023 14:44
Bid solicitor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted Tender Notice Procurement of leakage current measuring instruments for resistive components of substation valve lightning arresters for production of the investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa with the form Shortened competitive offer.
30/05/2023 10:34
The Bid solicitor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted the request Procurement of leakage current measuring instruments for resistive components of substation valve lightning arresters for production of the investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa with 1 bidding package.
26/05/2023 16:09
Bid solicitor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted Tender Notice Procurement of tools and equipment for occupational safety - hygiene - fire prevention in 2023 - Thanh Hoa power transmission of the investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa with the form Open bidding.
20/04/2023 22:55
Bid solicitor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted Tender Notice Package 02TC/SCL TH2023 Construction: Handling and leveling of phase-earth distance between columns 215 - 216 500kV transmission lines 584,564 Nghi Son 2 - 571;572 T500 Nho Quan (T500NQ) single circuit of the investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa with the form Shortened competitive offer.
07/04/2023 10:34
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted 4 of the contractor selection plan, which contains 4 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has posted 5 Tender Notice in the 5 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa is the investor of 5 package, of which 5 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty truyền tải điện 1 - Truyền tải điện Thanh Hóa is the owner of 4 contractor selection plan. In which, they self-invite 4 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!