Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST as follows:
- Has relationships with 5 contractor.
- Announced 4 investment development project, of which 4 projects have not yet announced the prequalification documents.
- Announced 11 contractor selection plans with a total of 54 bidding packages, of which 6 prequalification documents have not found the investment project.
- Has invited bids for 51 packages (with 51 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 9 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 53 packages that have not fully posted the contractor selection results. Of these 30 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 78.43%, Construction 15.69%, Consultancy 0%, Non-consultancy 5.88%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 15,662,237,552 VND, of which the total winning bid value is: 15,310,955,051 VND.
- The savings rate is: 2.24%.
Data analysis results of DauThau.info software for bid solicitors CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST as follows:
- Has relationships with 5 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 78.43%, Construction 15.69%, Consulting 0%, Non-consulting 5.88%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 15,662,237,552 VND, in which the total winning value is: 15,310,955,051 VND.
- The savings rate is: 2.24%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 4 investment and development projects.
- As the owner of 11 Contractor selection plan in which 11 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 51 bidding packages in which 51 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted Tender Notice Invest in auxiliary materials, coaxial network supplies and installation materials to serve the small operations of SCTV branches and centers in 2022 - phase 3 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST with the form Shortened competitive offer.
12/07/2023 14:30
Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted Tender Notice Construction of pulling 2FO cable to customer's house for GPON deployment at Thu Duc hub in 2023 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST with the form Shortened competitive offer.
07/07/2023 16:13
Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted Tender Notice Invest in GPON equipment for hub Hoang Mai, Hanoi in 2023 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST with the form Competitive Offer.
06/07/2023 16:35
The Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted the request Apply for approval to purchase additional installation materials in 2023 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST with 1 bidding package.
06/07/2023 16:30
Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted Tender Notice Invest in optical materials for GPON hub project Hoang Mai, Hanoi in 2023 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST with the form Competitive Offer.
03/07/2023 17:08
Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted Tender Notice Invest in auxiliary materials for the project of GPON hub Hoang Mai, Hanoi in 2023 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST with the form Shortened competitive offer.
30/06/2023 17:12
Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted Tender Notice Construction of cable pulling and equipment connection in the North to serve the transition of suspended network to underground in 2023, phase 1 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST with the form Shortened competitive offer.
30/06/2023 16:59
Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted Tender Notice Invest in tools and tools for the project of GPON hub Hoang Mai, Hanoi in 2023 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST with the form Shortened competitive offer.
30/06/2023 15:59
Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted Tender Notice Invest in fiber optic cable for GPON hub project Hoang Mai, Hanoi in 2023 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST with the form Shortened competitive offer.
30/06/2023 15:23
The Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted the results of the bidding package Buy spare supplies for Headend at Vung Tau Branch in 2022 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST.
- Winning bidder: CÔNG TY TNHH ĐIỆN TỬ VIỄN THÔNG BẢO KIM
29/06/2023 17:02
The data sheet has been partially hidden, to see the full information please Login or Register
CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST publishes Tender Notice Invest in auxiliary materials, coaxial network supplies and installation materials to serve the small operations of SCTV branches and centers in 2022 - phase 3 in the form Shortened competitive offer .
12/07/2023 14:30
CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST publishes Tender Notice Construction of pulling 2FO cable to customer's house for GPON deployment at Thu Duc hub in 2023 in the form Shortened competitive offer .
07/07/2023 16:13
CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST publishes Tender Notice Invest in GPON equipment for hub Hoang Mai, Hanoi in 2023 in the form Competitive Offer .
06/07/2023 16:35
CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST publishes the plan Apply for approval to purchase additional installation materials in 2023 with 1 bidding package .
06/07/2023 16:30
CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST publishes Tender Notice Invest in optical materials for GPON hub project Hoang Mai, Hanoi in 2023 in the form Competitive Offer .
03/07/2023 17:08
CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST publishes Tender Notice Invest in auxiliary materials for the project of GPON hub Hoang Mai, Hanoi in 2023 in the form Shortened competitive offer .
30/06/2023 17:12
CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST publishes Tender Notice Construction of cable pulling and equipment connection in the North to serve the transition of suspended network to underground in 2023, phase 1 in the form Shortened competitive offer .
30/06/2023 16:59
CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST publishes Tender Notice Invest in tools and tools for the project of GPON hub Hoang Mai, Hanoi in 2023 in the form Shortened competitive offer .
30/06/2023 15:59
CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST publishes Tender Notice Invest in fiber optic cable for GPON hub project Hoang Mai, Hanoi in 2023 in the form Shortened competitive offer .
30/06/2023 15:23
CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST announced the results of the bid package Buy spare supplies for Headend at Vung Tau Branch in 2022 .
- Winning bidder: CÔNG TY TNHH ĐIỆN TỬ VIỄN THÔNG BẢO KIM
29/06/2023 17:02
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted Tender Notice Invest in auxiliary materials, coaxial network supplies and installation materials to serve the small operations of SCTV branches and centers in 2022 - phase 3 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST with the form Shortened competitive offer.
12/07/2023 14:30
Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted Tender Notice Construction of pulling 2FO cable to customer's house for GPON deployment at Thu Duc hub in 2023 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST with the form Shortened competitive offer.
07/07/2023 16:13
Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted Tender Notice Invest in GPON equipment for hub Hoang Mai, Hanoi in 2023 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST with the form Competitive Offer.
06/07/2023 16:35
The Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted the request Apply for approval to purchase additional installation materials in 2023 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST with 1 bidding package.
06/07/2023 16:30
Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted Tender Notice Invest in optical materials for GPON hub project Hoang Mai, Hanoi in 2023 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST with the form Competitive Offer.
03/07/2023 17:08
Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted Tender Notice Invest in auxiliary materials for the project of GPON hub Hoang Mai, Hanoi in 2023 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST with the form Shortened competitive offer.
30/06/2023 17:12
Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted Tender Notice Construction of cable pulling and equipment connection in the North to serve the transition of suspended network to underground in 2023, phase 1 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST with the form Shortened competitive offer.
30/06/2023 16:59
Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted Tender Notice Invest in tools and tools for the project of GPON hub Hoang Mai, Hanoi in 2023 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST with the form Shortened competitive offer.
30/06/2023 15:59
Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted Tender Notice Invest in fiber optic cable for GPON hub project Hoang Mai, Hanoi in 2023 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST with the form Shortened competitive offer.
30/06/2023 15:23
The Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted the results of the bidding package Buy spare supplies for Headend at Vung Tau Branch in 2022 of the investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST.
- Winning bidder: CÔNG TY TNHH ĐIỆN TỬ VIỄN THÔNG BẢO KIM
29/06/2023 17:02
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted 11 of the contractor selection plan, which contains 54 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted 51 Tender Notice in the 51 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has posted 9 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 9 package, canceled the bid 0 package (among the bidding packages above).
- There are 4 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has a relationship with 5 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST is the investor of 51 package, of which 51 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST is the owner of 11 contractor selection plan. In which, they self-invite 11 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST is an investor with 5 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor CÔNG TY TNHH TRUYỀN HÌNH CÁP SAIGONTOURIST is the investor of 4 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code