Data analysis results of DauThau.info software for bid solicitors CÔNG TY ĐIỆN LỰC HOÀNG MAI as follows:
- Has relationships with 7 contractor.
- Announced 7 investment development project, of which 6 projects have not yet announced the prequalification documents.
- Announced 11 contractor selection plans with a total of 28 bidding packages, of which 9 prequalification documents have not found the investment project.
- Has invited bids for 16 packages (with 17 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 5 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 25 packages that have not fully posted the contractor selection results. Of these 14 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 29.41%, Construction 29.41%, Consultancy 35.29%, Non-consultancy 5.88%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 9,878,168,216 VND, of which the total winning bid value is: 9,210,893,303 VND.
- The savings rate is: 6.76%.
Data analysis results of DauThau.info software for bid solicitors CÔNG TY ĐIỆN LỰC HOÀNG MAI as follows:
- Has relationships with 7 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 29.41%, Construction 29.41%, Consulting 35.29%, Non-consulting 5.88%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 9,878,168,216 VND, in which the total winning value is: 9,210,893,303 VND.
- The savings rate is: 6.76%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 7 investment and development projects.
- As the owner of 11 Contractor selection plan in which 11 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 17 bidding packages in which 17 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
CÔNG TY ĐIỆN LỰC HOÀNG MAI Posted Development Investment Project Purchase of office equipment for the Project Management Board Phase 1 in 2023.
11/07/2023 15:15
The Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted the results of the bidding package Package No. 71-TVTT2023-ĐTRR: “Consultancy, Verification of construction drawing design, cost estimate of construction architecture: Overhaul of substations Tuong Mai public 1, Truong Dinh 4, N1 Dong Tau, N2 Dong Tau , N3 Dong Tau, N7 Phap Van, X2A-1 So Thuong ” of the investor CÔNG TY ĐIỆN LỰC HOÀNG MAI.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ TƯ VẤN VIỄN ĐÔNG
29/06/2023 16:33
Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted Tender Notice Package 67- TVTT2023-DTRR: Consultancy and verification of technical reports of works: Construction of 01 new 22kV underground cable route from 110kV Ho Yen So station to Dau Ca street light and to Tan Mai 3 substation, Highway 461 E1.26 power supply reliability of the investor CÔNG TY ĐIỆN LỰC HOÀNG MAI with the form Open bidding.
13/06/2023 15:02
Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted Tender Notice Bid package No. 64- TVTT2023-DTRR: Consultancy and verification of F/S of works: New construction of 01 22kV underground cable route from 110kV Ho Yen So station to substation B Zone B Cong Trang clear ray circuit, reduce load for Highway 474 E1.26,484 E1.3 of the investor CÔNG TY ĐIỆN LỰC HOÀNG MAI with the form Open bidding.
13/06/2023 15:01
The Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted the results of the bidding package Bid package No. 66- TVTK2023-DTRR: Consulting survey and making technical report for the work: Building a new 22kV underground cable route from 110kV Ho Yen So station to the tail light station and going to Tan Mai 3 substation, Highway 461 E1.26 improve power supply reliability of the investor CÔNG TY ĐIỆN LỰC HOÀNG MAI.
- Winning bidder: CÔNG TY CỔ PHẦN DỊCH VỤ TƯ VẤN XÂY DỰNG ĐIỆN VIỆT NAM
08/06/2023 15:27
The Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted the results of the bidding package Package No. 63- TVTK2023-DTRR: Consulting survey and making technical report for the work: Construction of a new 22kV underground cable route from 110kV Ho Yen So station to the substation area B of Cong Trang area, removing the ray-shaped circuit, reducing the load on the 474 E1 road. .26,484 E1.3 of the investor CÔNG TY ĐIỆN LỰC HOÀNG MAI.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ PHÁT TRIỂN THƯƠNG MẠI HÀ NỘI
08/06/2023 15:20
Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted Tender Notice Tender package No 71-TVTT2023-ĐTRR: “Consultancy, Verification of construction drawing design, cost estimate of construction architecture: Overhaul of substations Tuong Mai public 1, Truong Dinh 4, N1 Dong Tau, N2 Dong Tau , N3 Dong Tau, N7 Phap Van, X2A-1 So Thuong ” of the investor CÔNG TY ĐIỆN LỰC HOÀNG MAI with the form Open bidding.
08/06/2023 14:32
Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted Tender Notice Tender package No 01- TCHC23-CHCT: “Purchasing protective clothing and equipment in 2023” of the investor CÔNG TY ĐIỆN LỰC HOÀNG MAI with the form Competitive Offer.
23/05/2023 16:34
The Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted the request Contractor selection plan Bidding package No. 01- TCHC23-CHCT: “Purchasing protective clothing and equipment in 2023” of the investor CÔNG TY ĐIỆN LỰC HOÀNG MAI with 1 bidding package.
23/05/2023 15:58
Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted Tender Notice Package 70 -TVTK 2023-DTRR: "Consultancy for making construction drawing design - cost estimate: Overhaul of public Tuong Mai substations 1, Truong Dinh 4, N1 Dong Tau, N2 Dong Tau, N3 Dong Train, N7 Phap Van, X2A-1 So Thuong” of the investor CÔNG TY ĐIỆN LỰC HOÀNG MAI with the form Open bidding.
22/05/2023 14:20
The data sheet has been partially hidden, to see the full information please Login or Register
CÔNG TY ĐIỆN LỰC HOÀNG MAI announced the results of the bid package Package No. 71-TVTT2023-ĐTRR: “Consultancy, Verification of construction drawing design, cost estimate of construction architecture: Overhaul of substations Tuong Mai public 1, Truong Dinh 4, N1 Dong Tau, N2 Dong Tau , N3 Dong Tau, N7 Phap Van, X2A-1 So Thuong ” .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ TƯ VẤN VIỄN ĐÔNG
29/06/2023 16:33
CÔNG TY ĐIỆN LỰC HOÀNG MAI publishes Tender Notice Package 67- TVTT2023-DTRR: Consultancy and verification of technical reports of works: Construction of 01 new 22kV underground cable route from 110kV Ho Yen So station to Dau Ca street light and to Tan Mai 3 substation, Highway 461 E1.26 power supply reliability in the form Open bidding .
13/06/2023 15:02
CÔNG TY ĐIỆN LỰC HOÀNG MAI publishes Tender Notice Bid package No. 64- TVTT2023-DTRR: Consultancy and verification of F/S of works: New construction of 01 22kV underground cable route from 110kV Ho Yen So station to substation B Zone B Cong Trang clear ray circuit, reduce load for Highway 474 E1.26,484 E1.3 in the form Open bidding .
13/06/2023 15:01
CÔNG TY ĐIỆN LỰC HOÀNG MAI announced the results of the bid package Bid package No. 66- TVTK2023-DTRR: Consulting survey and making technical report for the work: Building a new 22kV underground cable route from 110kV Ho Yen So station to the tail light station and going to Tan Mai 3 substation, Highway 461 E1.26 improve power supply reliability .
- Winning bidder: CÔNG TY CỔ PHẦN DỊCH VỤ TƯ VẤN XÂY DỰNG ĐIỆN VIỆT NAM
08/06/2023 15:27
CÔNG TY ĐIỆN LỰC HOÀNG MAI announced the results of the bid package Package No. 63- TVTK2023-DTRR: Consulting survey and making technical report for the work: Construction of a new 22kV underground cable route from 110kV Ho Yen So station to the substation area B of Cong Trang area, removing the ray-shaped circuit, reducing the load on the 474 E1 road. .26,484 E1.3 .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN ASIS, CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ PHÁT TRIỂN THƯƠNG MẠI HÀ NỘI
08/06/2023 15:20
CÔNG TY ĐIỆN LỰC HOÀNG MAI publishes Tender Notice Tender package No 71-TVTT2023-ĐTRR: “Consultancy, Verification of construction drawing design, cost estimate of construction architecture: Overhaul of substations Tuong Mai public 1, Truong Dinh 4, N1 Dong Tau, N2 Dong Tau , N3 Dong Tau, N7 Phap Van, X2A-1 So Thuong ” in the form Open bidding .
08/06/2023 14:32
CÔNG TY ĐIỆN LỰC HOÀNG MAI publishes Tender Notice Tender package No 01- TCHC23-CHCT: “Purchasing protective clothing and equipment in 2023” in the form Competitive Offer .
23/05/2023 16:34
CÔNG TY ĐIỆN LỰC HOÀNG MAI publishes the plan Contractor selection plan Bidding package No. 01- TCHC23-CHCT: “Purchasing protective clothing and equipment in 2023” with 1 bidding package .
23/05/2023 15:58
CÔNG TY ĐIỆN LỰC HOÀNG MAI publishes Tender Notice Package 70 -TVTK 2023-DTRR: "Consultancy for making construction drawing design - cost estimate: Overhaul of public Tuong Mai substations 1, Truong Dinh 4, N1 Dong Tau, N2 Dong Tau, N3 Dong Train, N7 Phap Van, X2A-1 So Thuong” in the form Open bidding .
22/05/2023 14:20
CÔNG TY ĐIỆN LỰC HOÀNG MAI publishes the plan Plan for selecting contractors for bidding packages Consulting for making construction drawings design - cost estimation and consulting for verifying construction drawing design - construction architectural part estimation: Overhaul of public future substations 1 , Truong Dinh 4, N1 Dong Tau, N2 Dong Tau, N3 Dong Tau, N7 Phap Van, X2A-1 So Thuong with 2 bidding package .
15/05/2023 13:59
The data sheet has been partially hidden, to see the full information please Login or Register
CÔNG TY ĐIỆN LỰC HOÀNG MAI Posted Development Investment Project Purchase of office equipment for the Project Management Board Phase 1 in 2023.
11/07/2023 15:15
The Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted the results of the bidding package Package No. 71-TVTT2023-ĐTRR: “Consultancy, Verification of construction drawing design, cost estimate of construction architecture: Overhaul of substations Tuong Mai public 1, Truong Dinh 4, N1 Dong Tau, N2 Dong Tau , N3 Dong Tau, N7 Phap Van, X2A-1 So Thuong ” of the investor CÔNG TY ĐIỆN LỰC HOÀNG MAI.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ TƯ VẤN VIỄN ĐÔNG
29/06/2023 16:33
Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted Tender Notice Package 67- TVTT2023-DTRR: Consultancy and verification of technical reports of works: Construction of 01 new 22kV underground cable route from 110kV Ho Yen So station to Dau Ca street light and to Tan Mai 3 substation, Highway 461 E1.26 power supply reliability of the investor CÔNG TY ĐIỆN LỰC HOÀNG MAI with the form Open bidding.
13/06/2023 15:02
Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted Tender Notice Bid package No. 64- TVTT2023-DTRR: Consultancy and verification of F/S of works: New construction of 01 22kV underground cable route from 110kV Ho Yen So station to substation B Zone B Cong Trang clear ray circuit, reduce load for Highway 474 E1.26,484 E1.3 of the investor CÔNG TY ĐIỆN LỰC HOÀNG MAI with the form Open bidding.
13/06/2023 15:01
The Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted the results of the bidding package Bid package No. 66- TVTK2023-DTRR: Consulting survey and making technical report for the work: Building a new 22kV underground cable route from 110kV Ho Yen So station to the tail light station and going to Tan Mai 3 substation, Highway 461 E1.26 improve power supply reliability of the investor CÔNG TY ĐIỆN LỰC HOÀNG MAI.
- Winning bidder: CÔNG TY CỔ PHẦN DỊCH VỤ TƯ VẤN XÂY DỰNG ĐIỆN VIỆT NAM
08/06/2023 15:27
The Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted the results of the bidding package Package No. 63- TVTK2023-DTRR: Consulting survey and making technical report for the work: Construction of a new 22kV underground cable route from 110kV Ho Yen So station to the substation area B of Cong Trang area, removing the ray-shaped circuit, reducing the load on the 474 E1 road. .26,484 E1.3 of the investor CÔNG TY ĐIỆN LỰC HOÀNG MAI.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ PHÁT TRIỂN THƯƠNG MẠI HÀ NỘI
08/06/2023 15:20
Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted Tender Notice Tender package No 71-TVTT2023-ĐTRR: “Consultancy, Verification of construction drawing design, cost estimate of construction architecture: Overhaul of substations Tuong Mai public 1, Truong Dinh 4, N1 Dong Tau, N2 Dong Tau , N3 Dong Tau, N7 Phap Van, X2A-1 So Thuong ” of the investor CÔNG TY ĐIỆN LỰC HOÀNG MAI with the form Open bidding.
08/06/2023 14:32
Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted Tender Notice Tender package No 01- TCHC23-CHCT: “Purchasing protective clothing and equipment in 2023” of the investor CÔNG TY ĐIỆN LỰC HOÀNG MAI with the form Competitive Offer.
23/05/2023 16:34
The Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted the request Contractor selection plan Bidding package No. 01- TCHC23-CHCT: “Purchasing protective clothing and equipment in 2023” of the investor CÔNG TY ĐIỆN LỰC HOÀNG MAI with 1 bidding package.
23/05/2023 15:58
Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted Tender Notice Package 70 -TVTK 2023-DTRR: "Consultancy for making construction drawing design - cost estimate: Overhaul of public Tuong Mai substations 1, Truong Dinh 4, N1 Dong Tau, N2 Dong Tau, N3 Dong Train, N7 Phap Van, X2A-1 So Thuong” of the investor CÔNG TY ĐIỆN LỰC HOÀNG MAI with the form Open bidding.
22/05/2023 14:20
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted 11 of the contractor selection plan, which contains 28 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted 17 Tender Notice in the 16 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has posted 5 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 5 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor CÔNG TY ĐIỆN LỰC HOÀNG MAI has a relationship with 7 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor CÔNG TY ĐIỆN LỰC HOÀNG MAI has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor CÔNG TY ĐIỆN LỰC HOÀNG MAI is the investor of 17 package, of which 17 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor CÔNG TY ĐIỆN LỰC HOÀNG MAI is the owner of 11 contractor selection plan. In which, they self-invite 11 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor CÔNG TY ĐIỆN LỰC HOÀNG MAI is an investor with 7 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor CÔNG TY ĐIỆN LỰC HOÀNG MAI is the investor of 7 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register