Data analysis results of DauThau.info software for bid solicitors CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH as follows:
- Has relationships with 2 contractor.
- Announced 7 investment development project, of which 7 projects have not yet announced the prequalification documents.
- Announced 6 contractor selection plans with a total of 6 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 6 packages (with 6 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 6 packages that have not fully posted the contractor selection results. Of these 4 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,379,000,000 VND, of which the total winning bid value is: 2,259,000,000 VND.
- The savings rate is: 5.04%.
Data analysis results of DauThau.info software for bid solicitors CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH as follows:
- Has relationships with 2 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,379,000,000 VND, in which the total winning value is: 2,259,000,000 VND.
- The savings rate is: 5.04%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 7 investment and development projects.
- As the owner of 6 Contractor selection plan in which 6 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 6 bidding packages in which 6 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Bid solicitor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH has posted Tender Notice Package 2023.HH.06: Supply of VTTB (including installation), connection, testing, calibration of SCADA system and purchase of construction insurance: “Complete SCADA system for Cu Chi 220kV substation” of the investor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH with the form Open bidding.
20/07/2023 10:52
Bid solicitor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH has posted Tender Notice Package 2023.HH.05: Provide VTTB (including installation, connection, complete testing) for the project: "Equip and upgrade hardware infrastructure for SCADA system of Control Center 1" of the investor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH with the form Open bidding.
09/06/2023 08:26
The Bid solicitor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH has posted the request Contractor selection plan for SCADA system completion project for Tham Luong 110kV substation of the investor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH with 1 bidding package.
23/05/2023 09:35
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH Posted Development Investment Project Completing SCADA system for Tham Luong 110kV substation.
23/05/2023 09:09
The Bid solicitor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH has posted the request Plan for selecting contractor for the SCADA system completion project for the 110kV Thanh Loc substation of the investor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH with 1 bidding package.
23/05/2023 08:46
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH Posted Development Investment Project Completing SCADA system for Thanh Loc 110kV substation.
23/05/2023 08:08
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH Posted Development Investment Project Completing SCADA system for Tham Luong 110kV substation.
23/05/2023 08:08
The Bid solicitor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH has posted the request Project contractor selection plan: Complete SCADA system for 110kV Lang Cat substation of the investor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH with 1 bidding package.
22/05/2023 16:17
The Bid solicitor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH has posted the request Project contractor selection plan: Complete SCADA system for 110kV Tan Binh 3 . substation of the investor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH with 1 bidding package.
22/05/2023 16:13
The Bid solicitor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH has posted the request Project contractor selection plan: Completion of SCADA system for 220kV Cu Chi substation of the investor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH with 1 bidding package.
22/05/2023 16:09
The data sheet has been partially hidden, to see the full information please Login or Register
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH publishes Tender Notice Package 2023.HH.06: Supply of VTTB (including installation), connection, testing, calibration of SCADA system and purchase of construction insurance: “Complete SCADA system for Cu Chi 220kV substation” in the form Open bidding .
20/07/2023 10:52
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH publishes Tender Notice Package 2023.HH.05: Provide VTTB (including installation, connection, complete testing) for the project: "Equip and upgrade hardware infrastructure for SCADA system of Control Center 1" in the form Open bidding .
09/06/2023 08:26
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH publishes the plan Contractor selection plan for SCADA system completion project for Tham Luong 110kV substation with 1 bidding package .
23/05/2023 09:35
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH publishes the plan Plan for selecting contractor for the SCADA system completion project for the 110kV Thanh Loc substation with 1 bidding package .
23/05/2023 08:46
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH publishes the plan Project contractor selection plan: Complete SCADA system for 110kV Lang Cat substation with 1 bidding package .
22/05/2023 16:17
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH publishes the plan Project contractor selection plan: Complete SCADA system for 110kV Tan Binh 3 . substation with 1 bidding package .
22/05/2023 16:13
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH publishes the plan Project contractor selection plan: Completion of SCADA system for 220kV Cu Chi substation with 1 bidding package .
22/05/2023 16:09
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH publishes Tender Notice Package 2023.HH.02: Supplying information display system of HCMC power grid for Control Center 1. in the form Open bidding .
12/05/2023 10:46
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH publishes the plan Project contractor selection plan: “Equip and upgrade hardware infrastructure for SCADA system of Control Center 1” with 1 bidding package .
25/04/2023 15:35
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH announced the results of the bid package Package 2023.HH.01: Provide key and short circuit calculation software (including installation, connection and complete testing) for the project: “Upgrading the key of short circuit calculation simulation software for calculation relay calculation to meet the grid operation with many renewable energy sources” .
- Winning bidder: CÔNG TY TNHH CÔNG NGHỆ VÀ HỆ THỐNG, CÔNG TY CỔ PHẦN PHÁT TRIỂN NGUỒN MỞ VÀ DỊCH VỤ FDS
21/04/2023 09:55
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH has posted Tender Notice Package 2023.HH.06: Supply of VTTB (including installation), connection, testing, calibration of SCADA system and purchase of construction insurance: “Complete SCADA system for Cu Chi 220kV substation” of the investor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH with the form Open bidding.
20/07/2023 10:52
Bid solicitor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH has posted Tender Notice Package 2023.HH.05: Provide VTTB (including installation, connection, complete testing) for the project: "Equip and upgrade hardware infrastructure for SCADA system of Control Center 1" of the investor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH with the form Open bidding.
09/06/2023 08:26
The Bid solicitor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH has posted the request Contractor selection plan for SCADA system completion project for Tham Luong 110kV substation of the investor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH with 1 bidding package.
23/05/2023 09:35
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH Posted Development Investment Project Completing SCADA system for Tham Luong 110kV substation.
23/05/2023 09:09
The Bid solicitor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH has posted the request Plan for selecting contractor for the SCADA system completion project for the 110kV Thanh Loc substation of the investor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH with 1 bidding package.
23/05/2023 08:46
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH Posted Development Investment Project Completing SCADA system for Thanh Loc 110kV substation.
23/05/2023 08:08
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH Posted Development Investment Project Completing SCADA system for Tham Luong 110kV substation.
23/05/2023 08:08
The Bid solicitor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH has posted the request Project contractor selection plan: Complete SCADA system for 110kV Lang Cat substation of the investor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH with 1 bidding package.
22/05/2023 16:17
The Bid solicitor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH has posted the request Project contractor selection plan: Complete SCADA system for 110kV Tan Binh 3 . substation of the investor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH with 1 bidding package.
22/05/2023 16:13
The Bid solicitor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH has posted the request Project contractor selection plan: Completion of SCADA system for 220kV Cu Chi substation of the investor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH with 1 bidding package.
22/05/2023 16:09
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH has posted 6 of the contractor selection plan, which contains 6 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH has posted 6 Tender Notice in the 6 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH has a relationship with 2 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH is the investor of 6 package, of which 6 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH is the owner of 6 contractor selection plan. In which, they self-invite 6 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH is an investor with 2 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - TRUNG TÂM ĐIỀU ĐỘ HỆ THỐNG ĐIỆN THÀNH PHỐ HỒ CHÍ MINH is the investor of 7 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code