Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Bộ Chỉ huy Quân sự tỉnh Đồng Nai as follows:
- Has relationships with 0 contractor.
- Announced 4 investment development project, of which 4 projects have not yet announced the prequalification documents.
- Announced 8 contractor selection plans with a total of 20 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 5 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 15 packages that have not fully posted the contractor selection results. Of these 9 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 691,428,971 VND, of which the total winning bid value is: 691,428,904 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Bộ Chỉ huy Quân sự tỉnh Đồng Nai as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 691,428,971 VND, in which the total winning value is: 691,428,904 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 4 investment and development projects.
- As the owner of 8 Contractor selection plan in which 8 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 6 bidding packages in which 0 packages are self-invited, and 6 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted the request The plan to select contractors for the concentrated procurement of militia and self-defense uniforms for the district and commune levels in 2023 in the province of the Military Command of Dong Nai province as the Investor of the investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai with 1 bidding package.
08/07/2023 10:19
The Bid solicitor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted the results of the bidding package Package TV-04 Consulting on setting up bidding documents, evaluating construction bids, equipment of the investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai.
14/06/2023 09:38
The Bid solicitor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted the request Plan for selecting contractors for the procurement of equipment for reserve training and mobilization in 2023 of the investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai with 1 bidding package.
12/06/2023 09:10
The Bid solicitor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted the request Plan for selection of contractor for construction of clean water system of 19th Engineer Company, Nhon Trach Command, Trang Bom, Thong Nhat, Long Khanh, Cam My, Tan Phu/Department of Customs of Dong Nai province/Military zone 7 of the investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai with 5 bidding package.
02/06/2023 08:06
The Bid solicitor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted the request The plan to select contractors for consultancy bidding packages for construction investment projects of some works of the Military Command of Dong Nai province of the investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai with 5 bidding package.
20/05/2023 09:56
The Bid solicitor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted the results of the bidding package Package 03 (consultation) Verification of construction drawing design, construction estimate of the investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai.
20/05/2023 09:55
The Bid solicitor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted the results of the bidding package Package No. 02 (consultation) Preparation of economic and technical reports of the investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai.
20/05/2023 09:53
The Bid solicitor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted the results of the bidding package Package No. 01 (consultation) Project management of the investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai.
20/05/2023 09:50
The Bid solicitor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted the request Contractor selection plan Economic and technical report on construction investment Renovating and repairing Headquarters Legal Division of the investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai with 5 bidding package.
19/05/2023 13:21
The data sheet has been partially hidden, to see the full information please Login or Register
Bộ Chỉ huy Quân sự tỉnh Đồng Nai publishes the plan The plan to select contractors for the concentrated procurement of militia and self-defense uniforms for the district and commune levels in 2023 in the province of the Military Command of Dong Nai province as the Investor with 1 bidding package .
08/07/2023 10:19
Bộ Chỉ huy Quân sự tỉnh Đồng Nai announced the results of the bid package Package TV-04 Consulting on setting up bidding documents, evaluating construction bids, equipment .
- Winning bidder:
14/06/2023 09:38
Bộ Chỉ huy Quân sự tỉnh Đồng Nai publishes the plan Plan for selecting contractors for the procurement of equipment for reserve training and mobilization in 2023 with 1 bidding package .
12/06/2023 09:10
Bộ Chỉ huy Quân sự tỉnh Đồng Nai publishes the plan Plan for selection of contractor for construction of clean water system of 19th Engineer Company, Nhon Trach Command, Trang Bom, Thong Nhat, Long Khanh, Cam My, Tan Phu/Department of Customs of Dong Nai province/Military zone 7 with 5 bidding package .
02/06/2023 08:06
Bộ Chỉ huy Quân sự tỉnh Đồng Nai publishes the plan The plan to select contractors for consultancy bidding packages for construction investment projects of some works of the Military Command of Dong Nai province with 5 bidding package .
20/05/2023 09:56
Bộ Chỉ huy Quân sự tỉnh Đồng Nai announced the results of the bid package Package 03 (consultation) Verification of construction drawing design, construction estimate .
- Winning bidder:
20/05/2023 09:55
Bộ Chỉ huy Quân sự tỉnh Đồng Nai announced the results of the bid package Package No. 02 (consultation) Preparation of economic and technical reports .
- Winning bidder:
20/05/2023 09:53
Bộ Chỉ huy Quân sự tỉnh Đồng Nai announced the results of the bid package Package No. 01 (consultation) Project management .
- Winning bidder:
20/05/2023 09:50
Bộ Chỉ huy Quân sự tỉnh Đồng Nai publishes the plan Contractor selection plan Economic and technical report on construction investment Renovating and repairing Headquarters Legal Division with 5 bidding package .
19/05/2023 13:21
Bộ Chỉ huy Quân sự tỉnh Đồng Nai publishes the plan The plan for selection of consulting contractors (preparatory stage for investment) for the repair and maintenance work of some items of living, working and training works of the Military Command of Dong Nai province with 3 bidding package .
19/05/2023 13:16
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted the request The plan to select contractors for the concentrated procurement of militia and self-defense uniforms for the district and commune levels in 2023 in the province of the Military Command of Dong Nai province as the Investor of the investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai with 1 bidding package.
08/07/2023 10:19
The Bid solicitor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted the results of the bidding package Package TV-04 Consulting on setting up bidding documents, evaluating construction bids, equipment of the investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai.
14/06/2023 09:38
The Bid solicitor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted the request Plan for selecting contractors for the procurement of equipment for reserve training and mobilization in 2023 of the investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai with 1 bidding package.
12/06/2023 09:10
The Bid solicitor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted the request Plan for selection of contractor for construction of clean water system of 19th Engineer Company, Nhon Trach Command, Trang Bom, Thong Nhat, Long Khanh, Cam My, Tan Phu/Department of Customs of Dong Nai province/Military zone 7 of the investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai with 5 bidding package.
02/06/2023 08:06
The Bid solicitor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted the request The plan to select contractors for consultancy bidding packages for construction investment projects of some works of the Military Command of Dong Nai province of the investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai with 5 bidding package.
20/05/2023 09:56
The Bid solicitor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted the results of the bidding package Package 03 (consultation) Verification of construction drawing design, construction estimate of the investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai.
20/05/2023 09:55
The Bid solicitor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted the results of the bidding package Package No. 02 (consultation) Preparation of economic and technical reports of the investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai.
20/05/2023 09:53
The Bid solicitor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted the results of the bidding package Package No. 01 (consultation) Project management of the investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai.
20/05/2023 09:50
The Bid solicitor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted the request Contractor selection plan Economic and technical report on construction investment Renovating and repairing Headquarters Legal Division of the investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai with 5 bidding package.
19/05/2023 13:21
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted 8 of the contractor selection plan, which contains 20 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has posted 5 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 5 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: Investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai is the owner of 8 contractor selection plan. In which, they self-invite 8 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Bộ Chỉ huy Quân sự tỉnh Đồng Nai is the investor of 4 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code