Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban quản lý vịnh Hạ Long as follows:
- Has relationships with 1 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 13 contractor selection plans with a total of 20 bidding packages, of which 13 prequalification documents have not found the investment project.
- Has invited bids for 6 packages (with 6 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 3 packages with results that do not have tender notice or prequalification notice.
- There are 20 packages that have not fully posted the contractor selection results. Of these 16 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 50.00%, Construction 33.33%, Consultancy 0%, Non-consultancy 16.67%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 229,125,000 VND, of which the total winning bid value is: 229,125,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý vịnh Hạ Long as follows:
- Has relationships with 1 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 50.00%, Construction 33.33%, Consulting 0%, Non-consulting 16.67%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 229,125,000 VND, in which the total winning value is: 229,125,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 13 Contractor selection plan in which 13 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 6 bidding packages in which 6 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban quản lý vịnh Hạ Long has posted the request Hire vehicles to transport workers and workers at sea at route I, Ha Long Bay of the investor Ban quản lý vịnh Hạ Long with 3 bidding package.
20/07/2023 08:37
The Bid solicitor Ban quản lý vịnh Hạ Long has posted the request Hire vehicles to transport workers and workers at sea at route I, Ha Long Bay of the investor Ban quản lý vịnh Hạ Long with 3 bidding package.
20/07/2023 08:22
Bid solicitor Ban quản lý vịnh Hạ Long has posted Tender Notice Package 01: Purchase of fire pumps for fire prevention, disaster prevention and search and rescue at units under Ha Long Bay Management Board of the investor Ban quản lý vịnh Hạ Long with the form Competitive Offer.
04/07/2023 15:30
Bid solicitor Ban quản lý vịnh Hạ Long has posted Tender Notice Package 02: Cost of construction equipment of the investor Ban quản lý vịnh Hạ Long with the form Competitive Offer.
27/06/2023 09:34
Bid solicitor Ban quản lý vịnh Hạ Long has posted Tender Notice Package 01: Construction of technical infrastructure of the investor Ban quản lý vịnh Hạ Long with the form Competitive Offer.
23/06/2023 17:42
Bid solicitor Ban quản lý vịnh Hạ Long has posted Tender Notice Procurement and repair of some items of facilities at the conservation center I under the Ha Long Bay Management Board of the investor Ban quản lý vịnh Hạ Long with the form Competitive Offer.
23/06/2023 16:49
The Bid solicitor Ban quản lý vịnh Hạ Long has posted the request Purchase spare parts and supplies, repair desktop computers for employees in the Operations Department - Research of the investor Ban quản lý vịnh Hạ Long with 1 bidding package.
22/06/2023 17:35
The Bid solicitor Ban quản lý vịnh Hạ Long has posted the request Surveying, measuring and drawing in detail a site of geological - geomorphological heritage in order to preserve and promote sustainably the geological - geomorphological value of Ha Long Bay Heritage of the investor Ban quản lý vịnh Hạ Long with 1 bidding package.
22/06/2023 10:28
The Bid solicitor Ban quản lý vịnh Hạ Long has posted the request Contractor selection plan for the package: Purchase of fire pumps for fire prevention and fighting, disaster prevention and search and rescue at units under the Ha Long Bay Management Board of the investor Ban quản lý vịnh Hạ Long with 1 bidding package.
22/06/2023 09:22
The Bid solicitor Ban quản lý vịnh Hạ Long has posted the results of the bidding package Survey and assess the current status of coral reef ecosystems as a basis for implementing solutions to preserve and promote sustainable heritage values; Proposing zoning of some coral reefs with high coverage in Ha Long Bay of the investor Ban quản lý vịnh Hạ Long.
22/06/2023 08:36
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý vịnh Hạ Long publishes the plan Hire vehicles to transport workers and workers at sea at route I, Ha Long Bay with 3 bidding package .
20/07/2023 08:37
Ban quản lý vịnh Hạ Long publishes the plan Hire vehicles to transport workers and workers at sea at route I, Ha Long Bay with 3 bidding package .
20/07/2023 08:22
Ban quản lý vịnh Hạ Long publishes Tender Notice Package 01: Purchase of fire pumps for fire prevention, disaster prevention and search and rescue at units under Ha Long Bay Management Board in the form Competitive Offer .
04/07/2023 15:30
Ban quản lý vịnh Hạ Long publishes Tender Notice Package 02: Cost of construction equipment in the form Competitive Offer .
27/06/2023 09:34
Ban quản lý vịnh Hạ Long publishes Tender Notice Package 01: Construction of technical infrastructure in the form Competitive Offer .
23/06/2023 17:42
Ban quản lý vịnh Hạ Long publishes Tender Notice Procurement and repair of some items of facilities at the conservation center I under the Ha Long Bay Management Board in the form Competitive Offer .
23/06/2023 16:49
Ban quản lý vịnh Hạ Long publishes the plan Purchase spare parts and supplies, repair desktop computers for employees in the Operations Department - Research with 1 bidding package .
22/06/2023 17:35
Ban quản lý vịnh Hạ Long publishes the plan Surveying, measuring and drawing in detail a site of geological - geomorphological heritage in order to preserve and promote sustainably the geological - geomorphological value of Ha Long Bay Heritage with 1 bidding package .
22/06/2023 10:28
Ban quản lý vịnh Hạ Long publishes the plan Contractor selection plan for the package: Purchase of fire pumps for fire prevention and fighting, disaster prevention and search and rescue at units under the Ha Long Bay Management Board with 1 bidding package .
22/06/2023 09:22
Ban quản lý vịnh Hạ Long announced the results of the bid package Survey and assess the current status of coral reef ecosystems as a basis for implementing solutions to preserve and promote sustainable heritage values; Proposing zoning of some coral reefs with high coverage in Ha Long Bay .
- Winning bidder:
22/06/2023 08:36
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý vịnh Hạ Long has posted the request Hire vehicles to transport workers and workers at sea at route I, Ha Long Bay of the investor Ban quản lý vịnh Hạ Long with 3 bidding package.
20/07/2023 08:37
The Bid solicitor Ban quản lý vịnh Hạ Long has posted the request Hire vehicles to transport workers and workers at sea at route I, Ha Long Bay of the investor Ban quản lý vịnh Hạ Long with 3 bidding package.
20/07/2023 08:22
Bid solicitor Ban quản lý vịnh Hạ Long has posted Tender Notice Package 01: Purchase of fire pumps for fire prevention, disaster prevention and search and rescue at units under Ha Long Bay Management Board of the investor Ban quản lý vịnh Hạ Long with the form Competitive Offer.
04/07/2023 15:30
Bid solicitor Ban quản lý vịnh Hạ Long has posted Tender Notice Package 02: Cost of construction equipment of the investor Ban quản lý vịnh Hạ Long with the form Competitive Offer.
27/06/2023 09:34
Bid solicitor Ban quản lý vịnh Hạ Long has posted Tender Notice Package 01: Construction of technical infrastructure of the investor Ban quản lý vịnh Hạ Long with the form Competitive Offer.
23/06/2023 17:42
Bid solicitor Ban quản lý vịnh Hạ Long has posted Tender Notice Procurement and repair of some items of facilities at the conservation center I under the Ha Long Bay Management Board of the investor Ban quản lý vịnh Hạ Long with the form Competitive Offer.
23/06/2023 16:49
The Bid solicitor Ban quản lý vịnh Hạ Long has posted the request Purchase spare parts and supplies, repair desktop computers for employees in the Operations Department - Research of the investor Ban quản lý vịnh Hạ Long with 1 bidding package.
22/06/2023 17:35
The Bid solicitor Ban quản lý vịnh Hạ Long has posted the request Surveying, measuring and drawing in detail a site of geological - geomorphological heritage in order to preserve and promote sustainably the geological - geomorphological value of Ha Long Bay Heritage of the investor Ban quản lý vịnh Hạ Long with 1 bidding package.
22/06/2023 10:28
The Bid solicitor Ban quản lý vịnh Hạ Long has posted the request Contractor selection plan for the package: Purchase of fire pumps for fire prevention and fighting, disaster prevention and search and rescue at units under the Ha Long Bay Management Board of the investor Ban quản lý vịnh Hạ Long with 1 bidding package.
22/06/2023 09:22
The Bid solicitor Ban quản lý vịnh Hạ Long has posted the results of the bidding package Survey and assess the current status of coral reef ecosystems as a basis for implementing solutions to preserve and promote sustainable heritage values; Proposing zoning of some coral reefs with high coverage in Ha Long Bay of the investor Ban quản lý vịnh Hạ Long.
22/06/2023 08:36
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý vịnh Hạ Long has posted 13 of the contractor selection plan, which contains 20 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý vịnh Hạ Long has posted 6 Tender Notice in the 6 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý vịnh Hạ Long has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 3 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý vịnh Hạ Long has a relationship with 1 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý vịnh Hạ Long has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý vịnh Hạ Long is the investor of 6 package, of which 6 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý vịnh Hạ Long is the owner of 13 contractor selection plan. In which, they self-invite 13 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban quản lý vịnh Hạ Long is an investor with 1 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code