Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình as follows:
- Has relationships with 0 contractor.
- Announced 5 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 12 contractor selection plans with a total of 47 bidding packages, of which 6 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 11 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 11 packages with results that do not have tender notice or prequalification notice.
- There are 42 packages that have not fully posted the contractor selection results. Of these 36 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 100.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,517,002,000 VND, of which the total winning bid value is: 1,353,252,000 VND.
- The savings rate is: 10.79%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 100.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,517,002,000 VND, in which the total winning value is: 1,353,252,000 VND.
- The savings rate is: 10.79%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 5 investment and development projects.
- As the owner of 12 Contractor selection plan in which 12 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 14 bidding packages in which 1 packages are self-invited, and 13 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted the results of the bidding package Consultancy on preparation of feasibility study report for adjustment of technical infrastructure project of Lac Chinh new residential area (before TB Hospital), Vu Chinh commune, Thai Binh city of the investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình.
07/07/2023 11:25
The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted the request KHLCNT implements a bidding package for consulting on setting up zoning planning tasks at the scale of 1/2000 in the southern area of Vu Phuc commune, Thai Binh city. of the investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình with 1 bidding package.
05/07/2023 16:34
The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted the request KHLCNT implements consultancy bidding packages for making environmental impact assessment reports under the technical infrastructure project of Lac Chinh new residential area, Vu Chinh commune, Thai Binh city of the investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình with 1 bidding package.
30/06/2023 16:05
The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted the request Planning consultancy bidding packages for surveying the preparation of feasibility study reports for the project of Renovating and embellishing the sidewalks of Tran Hung Dao street (section from Ky Dong street to Ly Thuong Kiet street) and Ky Dong street (section from Quang street) Central to Tran Hung Dao Street), Thai Binh City of the investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình with 2 bidding package.
30/06/2023 15:58
The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted the results of the bidding package Construction insurance of the investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình.
28/06/2023 15:56
The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted the request KHLCNT implements consulting packages for setting up and adjusting technical infrastructure projects for residential areas and resettlement in Lac Chinh village, Vu Chinh commune, Thai Binh city. of the investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình with 2 bidding package.
28/06/2023 15:04
Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình Posted Development Investment Project Technical infrastructure of Lac Chinh new residential area, Vu Chinh commune, Thai Binh city.
28/06/2023 14:14
The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted the request KHLCNT implements consulting bidding packages to prepare feasibility study reports for the project of Renovating and embellishing the sidewalks of Tran Hung Dao street (section from Ky Dong street to Ly Thuong Kiet street) and Ky Dong street (section from Quang Trung street) to Tran Hung Dao Street), Thai Binh city of the investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình with 1 bidding package.
24/06/2023 15:30
The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted the results of the bidding package Construction supervision consultancy of the investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình.
22/06/2023 18:51
The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted the results of the bidding package Construction supervision consultancy of the investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình.
22/06/2023 18:47
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình announced the results of the bid package Consultancy on preparation of feasibility study report for adjustment of technical infrastructure project of Lac Chinh new residential area (before TB Hospital), Vu Chinh commune, Thai Binh city .
- Winning bidder:
07/07/2023 11:25
Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình publishes the plan KHLCNT implements a bidding package for consulting on setting up zoning planning tasks at the scale of 1/2000 in the southern area of Vu Phuc commune, Thai Binh city. with 1 bidding package .
05/07/2023 16:34
Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình publishes the plan KHLCNT implements consultancy bidding packages for making environmental impact assessment reports under the technical infrastructure project of Lac Chinh new residential area, Vu Chinh commune, Thai Binh city with 1 bidding package .
30/06/2023 16:05
Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình publishes the plan Planning consultancy bidding packages for surveying the preparation of feasibility study reports for the project of Renovating and embellishing the sidewalks of Tran Hung Dao street (section from Ky Dong street to Ly Thuong Kiet street) and Ky Dong street (section from Quang street) Central to Tran Hung Dao Street), Thai Binh City with 2 bidding package .
30/06/2023 15:58
Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình announced the results of the bid package Construction insurance .
- Winning bidder:
28/06/2023 15:56
Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình publishes the plan KHLCNT implements consulting packages for setting up and adjusting technical infrastructure projects for residential areas and resettlement in Lac Chinh village, Vu Chinh commune, Thai Binh city. with 2 bidding package .
28/06/2023 15:04
Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình publishes the plan KHLCNT implements consulting bidding packages to prepare feasibility study reports for the project of Renovating and embellishing the sidewalks of Tran Hung Dao street (section from Ky Dong street to Ly Thuong Kiet street) and Ky Dong street (section from Quang Trung street) to Tran Hung Dao Street), Thai Binh city with 1 bidding package .
24/06/2023 15:30
Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình announced the results of the bid package Construction supervision consultancy .
- Winning bidder:
22/06/2023 18:51
Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình announced the results of the bid package Construction supervision consultancy .
- Winning bidder:
22/06/2023 18:47
Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình publishes the plan KHLCNT implements consulting bidding packages for the preparation of feasibility study reports for technical infrastructure projects in the center of Thai Binh city in Le Hong Phong and Bo Xuyen wards, Thai Binh city. with 2 bidding package .
21/06/2023 18:25
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted the results of the bidding package Consultancy on preparation of feasibility study report for adjustment of technical infrastructure project of Lac Chinh new residential area (before TB Hospital), Vu Chinh commune, Thai Binh city of the investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình.
07/07/2023 11:25
The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted the request KHLCNT implements a bidding package for consulting on setting up zoning planning tasks at the scale of 1/2000 in the southern area of Vu Phuc commune, Thai Binh city. of the investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình with 1 bidding package.
05/07/2023 16:34
The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted the request KHLCNT implements consultancy bidding packages for making environmental impact assessment reports under the technical infrastructure project of Lac Chinh new residential area, Vu Chinh commune, Thai Binh city of the investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình with 1 bidding package.
30/06/2023 16:05
The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted the request Planning consultancy bidding packages for surveying the preparation of feasibility study reports for the project of Renovating and embellishing the sidewalks of Tran Hung Dao street (section from Ky Dong street to Ly Thuong Kiet street) and Ky Dong street (section from Quang street) Central to Tran Hung Dao Street), Thai Binh City of the investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình with 2 bidding package.
30/06/2023 15:58
The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted the results of the bidding package Construction insurance of the investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình.
28/06/2023 15:56
The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted the request KHLCNT implements consulting packages for setting up and adjusting technical infrastructure projects for residential areas and resettlement in Lac Chinh village, Vu Chinh commune, Thai Binh city. of the investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình with 2 bidding package.
28/06/2023 15:04
Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình Posted Development Investment Project Technical infrastructure of Lac Chinh new residential area, Vu Chinh commune, Thai Binh city.
28/06/2023 14:14
The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted the request KHLCNT implements consulting bidding packages to prepare feasibility study reports for the project of Renovating and embellishing the sidewalks of Tran Hung Dao street (section from Ky Dong street to Ly Thuong Kiet street) and Ky Dong street (section from Quang Trung street) to Tran Hung Dao Street), Thai Binh city of the investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình with 1 bidding package.
24/06/2023 15:30
The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted the results of the bidding package Construction supervision consultancy of the investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình.
22/06/2023 18:51
The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted the results of the bidding package Construction supervision consultancy of the investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình.
22/06/2023 18:47
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted 12 of the contractor selection plan, which contains 47 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted 1 Tender Notice in the 1 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has posted 11 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 11 package, canceled the bid 0 package (among the bidding packages above).
- There are 11 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: Investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình is the investor of 14 package, of which 1 package is self-invited, other units invite bid 13 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình is the owner of 12 contractor selection plan. In which, they self-invite 12 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình is an investor with 8 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án xây dựng cơ sở hạ tầng thành phố Thái Bình is the investor of 5 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register