Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án thị xã Long Khánh as follows:
- Has relationships with 0 contractor.
- Announced 3 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 10 contractor selection plans with a total of 70 bidding packages, of which 7 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 70 packages that have not fully posted the contractor selection results. Of these 60 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án thị xã Long Khánh as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 3 investment and development projects.
- As the owner of 10 Contractor selection plan in which 10 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 14 bidding packages in which 0 packages are self-invited, and 14 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý dự án thị xã Long Khánh has posted the request Plan to select contractor to build Sen Hong Kindergarten, Suoi Tre ward of the investor Ban Quản lý dự án thị xã Long Khánh with 14 bidding package.
29/06/2023 14:46
The Bid solicitor Ban Quản lý dự án thị xã Long Khánh has posted the request The plan to select a consultant contractor to supplement the preparation of the detailed planning 1/500 of the resettlement area (about 7.33ha) in Xuan An ward, Xuan Hoa ward of the investor Ban Quản lý dự án thị xã Long Khánh with 6 bidding package.
19/06/2023 15:58
The Bid solicitor Ban Quản lý dự án thị xã Long Khánh has posted the request Plan to select contractor for Xuan Trung primary school of the investor Ban Quản lý dự án thị xã Long Khánh with 8 bidding package.
12/06/2023 11:09
The Bid solicitor Ban Quản lý dự án thị xã Long Khánh has posted the request Plan to select contractor to upgrade and repair Ho Thi Huong Secondary School of the investor Ban Quản lý dự án thị xã Long Khánh with 14 bidding package.
08/06/2023 14:58
The Bid solicitor Ban Quản lý dự án thị xã Long Khánh has posted the request Plan to select contractor for Xuan Trung primary school of the investor Ban Quản lý dự án thị xã Long Khánh with 5 bidding package.
22/05/2023 11:09
The Bid solicitor Ban Quản lý dự án thị xã Long Khánh has posted the request Contractor selection plan Economic and technical report on construction investment New construction project Suoi Tre ward Medical station, Long Khanh city of the investor Ban Quản lý dự án thị xã Long Khánh with 9 bidding package.
19/05/2023 15:19
The Bid solicitor Ban Quản lý dự án thị xã Long Khánh has posted the request Plan to select contractor for the project of Renovating and repairing 04 medical stations in Xuan An ward, Xuan Thanh ward, Xuan Binh ward, Phu Binh ward, Long Khanh city of the investor Ban Quản lý dự án thị xã Long Khánh with 10 bidding package.
19/05/2023 14:49
Ban Quản lý dự án thị xã Long Khánh Posted Development Investment Project New construction of a medical station in Suoi Tre ward, Long Khanh city.
19/05/2023 14:14
Ban Quản lý dự án thị xã Long Khánh Posted Development Investment Project Renovating and repairing 04 medical stations in Xuan An ward, Xuan Thanh ward, Xuan Binh ward, Phu Binh ward, Long Khanh city.
19/05/2023 10:10
The Bid solicitor Ban Quản lý dự án thị xã Long Khánh has posted the request Plan to select contractor for Xuan Trung primary school of the investor Ban Quản lý dự án thị xã Long Khánh with 5 bidding package.
18/05/2023 14:15
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án thị xã Long Khánh publishes the plan Plan to select contractor to build Sen Hong Kindergarten, Suoi Tre ward with 14 bidding package .
29/06/2023 14:46
Ban Quản lý dự án thị xã Long Khánh publishes the plan The plan to select a consultant contractor to supplement the preparation of the detailed planning 1/500 of the resettlement area (about 7.33ha) in Xuan An ward, Xuan Hoa ward with 6 bidding package .
19/06/2023 15:58
Ban Quản lý dự án thị xã Long Khánh publishes the plan Plan to select contractor for Xuan Trung primary school with 8 bidding package .
12/06/2023 11:09
Ban Quản lý dự án thị xã Long Khánh publishes the plan Plan to select contractor to upgrade and repair Ho Thi Huong Secondary School with 14 bidding package .
08/06/2023 14:58
Ban Quản lý dự án thị xã Long Khánh publishes the plan Plan to select contractor for Xuan Trung primary school with 5 bidding package .
22/05/2023 11:09
Ban Quản lý dự án thị xã Long Khánh publishes the plan Contractor selection plan Economic and technical report on construction investment New construction project Suoi Tre ward Medical station, Long Khanh city with 9 bidding package .
19/05/2023 15:19
Ban Quản lý dự án thị xã Long Khánh publishes the plan Plan to select contractor for the project of Renovating and repairing 04 medical stations in Xuan An ward, Xuan Thanh ward, Xuan Binh ward, Phu Binh ward, Long Khanh city with 10 bidding package .
19/05/2023 14:49
Ban Quản lý dự án thị xã Long Khánh publishes the plan Plan to select contractor for Xuan Trung primary school with 5 bidding package .
18/05/2023 14:15
Ban Quản lý dự án thị xã Long Khánh publishes the plan Plan to select contractors for consulting packages of Hoang Dieu Road Upgrading Project, Long Khanh City with 5 bidding package .
18/05/2023 08:53
Ban Quản lý dự án thị xã Long Khánh publishes the plan Construction contractor selection plan for Nguyen Hue Primary School (classrooms and function rooms; ground floor) with 4 bidding package .
19/04/2023 10:59
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý dự án thị xã Long Khánh has posted the request Plan to select contractor to build Sen Hong Kindergarten, Suoi Tre ward of the investor Ban Quản lý dự án thị xã Long Khánh with 14 bidding package.
29/06/2023 14:46
The Bid solicitor Ban Quản lý dự án thị xã Long Khánh has posted the request The plan to select a consultant contractor to supplement the preparation of the detailed planning 1/500 of the resettlement area (about 7.33ha) in Xuan An ward, Xuan Hoa ward of the investor Ban Quản lý dự án thị xã Long Khánh with 6 bidding package.
19/06/2023 15:58
The Bid solicitor Ban Quản lý dự án thị xã Long Khánh has posted the request Plan to select contractor for Xuan Trung primary school of the investor Ban Quản lý dự án thị xã Long Khánh with 8 bidding package.
12/06/2023 11:09
The Bid solicitor Ban Quản lý dự án thị xã Long Khánh has posted the request Plan to select contractor to upgrade and repair Ho Thi Huong Secondary School of the investor Ban Quản lý dự án thị xã Long Khánh with 14 bidding package.
08/06/2023 14:58
The Bid solicitor Ban Quản lý dự án thị xã Long Khánh has posted the request Plan to select contractor for Xuan Trung primary school of the investor Ban Quản lý dự án thị xã Long Khánh with 5 bidding package.
22/05/2023 11:09
The Bid solicitor Ban Quản lý dự án thị xã Long Khánh has posted the request Contractor selection plan Economic and technical report on construction investment New construction project Suoi Tre ward Medical station, Long Khanh city of the investor Ban Quản lý dự án thị xã Long Khánh with 9 bidding package.
19/05/2023 15:19
The Bid solicitor Ban Quản lý dự án thị xã Long Khánh has posted the request Plan to select contractor for the project of Renovating and repairing 04 medical stations in Xuan An ward, Xuan Thanh ward, Xuan Binh ward, Phu Binh ward, Long Khanh city of the investor Ban Quản lý dự án thị xã Long Khánh with 10 bidding package.
19/05/2023 14:49
Ban Quản lý dự án thị xã Long Khánh Posted Development Investment Project New construction of a medical station in Suoi Tre ward, Long Khanh city.
19/05/2023 14:14
Ban Quản lý dự án thị xã Long Khánh Posted Development Investment Project Renovating and repairing 04 medical stations in Xuan An ward, Xuan Thanh ward, Xuan Binh ward, Phu Binh ward, Long Khanh city.
19/05/2023 10:10
The Bid solicitor Ban Quản lý dự án thị xã Long Khánh has posted the request Plan to select contractor for Xuan Trung primary school of the investor Ban Quản lý dự án thị xã Long Khánh with 5 bidding package.
18/05/2023 14:15
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án thị xã Long Khánh has posted 10 of the contractor selection plan, which contains 70 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án thị xã Long Khánh has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án thị xã Long Khánh is the owner of 10 contractor selection plan. In which, they self-invite 10 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban Quản lý dự án thị xã Long Khánh is the investor of 3 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code