Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM as follows:
- Has relationships with 0 contractor.
- Announced 6 investment development project, of which 6 projects have not yet announced the prequalification documents.
- Announced 9 contractor selection plans with a total of 60 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 37 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 58 packages that have not fully posted the contractor selection results. Of these 53 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 3,186,524,000 VND, of which the total winning bid value is: 3,186,524,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 3,186,524,000 VND, in which the total winning value is: 3,186,524,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 6 investment and development projects.
- As the owner of 9 Contractor selection plan in which 9 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 15 bidding packages in which 0 packages are self-invited, and 15 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM Posted Development Investment Project Corn Garden Road.
14/07/2023 10:10
The Bid solicitor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM has posted the request Upgrading Road No. 29, Tra Co Hamlet of the investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM with 5 bidding package.
03/07/2023 16:25
BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM Posted Development Investment Project Upgrading Road No. 29, Tra Co Hamlet.
03/07/2023 16:16
The Bid solicitor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM has posted the results of the bidding package Package 05 (consultation): Measuring and drawing cadastral maps, marking landmarks, painting lines of the investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM.
23/06/2023 15:13
The Bid solicitor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM has posted the results of the bidding package Package 02 (consultation): Geological survey of the investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM.
23/06/2023 14:06
The Bid solicitor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM has posted the results of the bidding package Package No. 01 (consultation): Preparation of economic and technical reports of the investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM.
22/06/2023 14:41
The Bid solicitor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM has posted the results of the bidding package Package 03 (consultancy): Supervision of survey work of the investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM.
22/06/2023 10:55
The Bid solicitor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM has posted the results of the bidding package Package No. 1 (consultation): Preparation of economic and technical reports of the investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM.
22/06/2023 10:04
The Bid solicitor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM has posted the results of the bidding package Package No. 05 (consultation): Verification of construction drawing design - estimate of package No. 01 of the investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM.
22/06/2023 09:03
The Bid solicitor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM has posted the results of the bidding package Package 3 (consultation): Supervision of survey work of the investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM.
22/06/2023 08:16
The data sheet has been partially hidden, to see the full information please Login or Register
BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM publishes the plan Upgrading Road No. 29, Tra Co Hamlet with 5 bidding package .
03/07/2023 16:25
BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM announced the results of the bid package Package 05 (consultation): Measuring and drawing cadastral maps, marking landmarks, painting lines .
- Winning bidder:
23/06/2023 15:13
BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM announced the results of the bid package Package 02 (consultation): Geological survey .
- Winning bidder:
23/06/2023 14:06
BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM announced the results of the bid package Package No. 01 (consultation): Preparation of economic and technical reports .
- Winning bidder:
22/06/2023 14:41
BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM announced the results of the bid package Package 03 (consultancy): Supervision of survey work .
- Winning bidder:
22/06/2023 10:55
BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM announced the results of the bid package Package No. 1 (consultation): Preparation of economic and technical reports .
- Winning bidder:
22/06/2023 10:04
BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM announced the results of the bid package Package No. 05 (consultation): Verification of construction drawing design - estimate of package No. 01 .
- Winning bidder:
22/06/2023 09:03
BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM announced the results of the bid package Package 3 (consultation): Supervision of survey work .
- Winning bidder:
22/06/2023 08:16
BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM publishes the plan Tan Binh primary school in Binh Minh resettlement area (consulting package) with 6 bidding package .
21/06/2023 14:49
BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM announced the results of the bid package Consulting bidding package: Appraisal of bidding documents, LCNT results of construction and installation bidding package .
- Winning bidder:
20/06/2023 07:53
The data sheet has been partially hidden, to see the full information please Login or Register
BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM Posted Development Investment Project Corn Garden Road.
14/07/2023 10:10
The Bid solicitor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM has posted the request Upgrading Road No. 29, Tra Co Hamlet of the investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM with 5 bidding package.
03/07/2023 16:25
BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM Posted Development Investment Project Upgrading Road No. 29, Tra Co Hamlet.
03/07/2023 16:16
The Bid solicitor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM has posted the results of the bidding package Package 05 (consultation): Measuring and drawing cadastral maps, marking landmarks, painting lines of the investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM.
23/06/2023 15:13
The Bid solicitor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM has posted the results of the bidding package Package 02 (consultation): Geological survey of the investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM.
23/06/2023 14:06
The Bid solicitor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM has posted the results of the bidding package Package No. 01 (consultation): Preparation of economic and technical reports of the investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM.
22/06/2023 14:41
The Bid solicitor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM has posted the results of the bidding package Package 03 (consultancy): Supervision of survey work of the investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM.
22/06/2023 10:55
The Bid solicitor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM has posted the results of the bidding package Package No. 1 (consultation): Preparation of economic and technical reports of the investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM.
22/06/2023 10:04
The Bid solicitor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM has posted the results of the bidding package Package No. 05 (consultation): Verification of construction drawing design - estimate of package No. 01 of the investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM.
22/06/2023 09:03
The Bid solicitor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM has posted the results of the bidding package Package 3 (consultation): Supervision of survey work of the investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM.
22/06/2023 08:16
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM has posted 9 of the contractor selection plan, which contains 60 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM has posted 37 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 37 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: Investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM is the owner of 9 contractor selection plan. In which, they self-invite 9 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM is an investor with 6 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor BAN QUẢN LÝ DỰ ÁN HUYỆN TRẢNG BOM is the investor of 6 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code