Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải as follows:
- Has relationships with 3 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 1 contractor selection plans with a total of 1 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 5 packages (with 5 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 5 packages with results that do not have tender notice or prequalification notice.
- There are 1 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 20.00%, Consultancy 60.00%, Non-consultancy 20.00%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 23,367,468,574 VND, of which the total winning bid value is: 19,768,929,633 VND.
- The savings rate is: 15.40%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải as follows:
- Has relationships with 3 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 20.00%, Consulting 60.00%, Non-consulting 20.00%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 23,367,468,574 VND, in which the total winning value is: 19,768,929,633 VND.
- The savings rate is: 15.40%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 1 Contractor selection plan in which 1 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 5 bidding packages in which 5 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted Tender Notice Experimenting bored piles, Osterberg during the construction and installation of the main bridge from T37 pier to T40 pier (including water traffic regulation) of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải with the form Open bidding.
06/07/2023 09:23
The Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted the results of the bidding package Construction supervision consultant for main bridge from T37 to T40 pillar (including water traffic regulation) of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải.
- Winning bidder: THANG LONG CONSTRUCTION QUALITY CONSULTANT JOINT STOCK CONPANY
16/06/2023 20:36
The Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted the results of the bidding package Consulting on setting up bidding documents and evaluating bids for consulting and non-consulting bidding packages of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải.
13/06/2023 19:32
The Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted the results of the bidding package Consultancy on verification of technical and financial accounts (including traffic safety verification) of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải.
13/06/2023 19:23
The Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted the results of the bidding package Estimation consulting of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải.
13/06/2023 19:17
The Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted the results of the bidding package Clearing mines and explosives of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải.
13/06/2023 19:01
The Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted the results of the bidding package Consulting, supervising and surveying the steps of technical design and engineering design of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải.
13/06/2023 18:51
The Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted the request Approving the adjustment of the content of package 13 (Consultation on preparation of Bidding Documents, Bidding Documents and Evaluation of Proposal and Bid) of component 3 project of Bien Hoa - Vung Tau expressway construction investment project phase 1 of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải with 1 bidding package.
26/05/2023 13:37
Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted Tender Notice Experimenting bored piles, Osterberg during the construction and installation of the bridge leading from the beginning of the route to the T36-T37 pillar of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải with the form Open bidding.
19/05/2023 10:38
Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted Tender Notice Construction supervision consultant for main bridge from T37 to T40 pillar (including water traffic regulation) of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải with the form Open bidding.
11/05/2023 16:21
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải publishes Tender Notice Experimenting bored piles, Osterberg during the construction and installation of the main bridge from T37 pier to T40 pier (including water traffic regulation) in the form Open bidding .
06/07/2023 09:23
Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải announced the results of the bid package Construction supervision consultant for main bridge from T37 to T40 pillar (including water traffic regulation) .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG CÔNG TRÌNH GIAO THÔNG 1 , CÔNG TY TƯ VẤN CÔNG TRÌNH CHÂU Á THÁI BÌNH DƯƠNG, THANG LONG CONSTRUCTION QUALITY CONSULTANT JOINT STOCK CONPANY
16/06/2023 20:36
Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải announced the results of the bid package Consulting on setting up bidding documents and evaluating bids for consulting and non-consulting bidding packages .
- Winning bidder:
13/06/2023 19:32
Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải announced the results of the bid package Consultancy on verification of technical and financial accounts (including traffic safety verification) .
- Winning bidder:
13/06/2023 19:23
Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải announced the results of the bid package Estimation consulting .
- Winning bidder:
13/06/2023 19:17
Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải announced the results of the bid package Clearing mines and explosives .
- Winning bidder:
13/06/2023 19:01
Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải announced the results of the bid package Consulting, supervising and surveying the steps of technical design and engineering design .
- Winning bidder:
13/06/2023 18:51
Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải publishes the plan Approving the adjustment of the content of package 13 (Consultation on preparation of Bidding Documents, Bidding Documents and Evaluation of Proposal and Bid) of component 3 project of Bien Hoa - Vung Tau expressway construction investment project phase 1 with 1 bidding package .
26/05/2023 13:37
Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải publishes Tender Notice Experimenting bored piles, Osterberg during the construction and installation of the bridge leading from the beginning of the route to the T36-T37 pillar in the form Open bidding .
19/05/2023 10:38
Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải publishes Tender Notice Construction supervision consultant for main bridge from T37 to T40 pillar (including water traffic regulation) in the form Open bidding .
11/05/2023 16:21
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted Tender Notice Experimenting bored piles, Osterberg during the construction and installation of the main bridge from T37 pier to T40 pier (including water traffic regulation) of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải with the form Open bidding.
06/07/2023 09:23
The Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted the results of the bidding package Construction supervision consultant for main bridge from T37 to T40 pillar (including water traffic regulation) of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải.
- Winning bidder: THANG LONG CONSTRUCTION QUALITY CONSULTANT JOINT STOCK CONPANY
16/06/2023 20:36
The Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted the results of the bidding package Consulting on setting up bidding documents and evaluating bids for consulting and non-consulting bidding packages of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải.
13/06/2023 19:32
The Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted the results of the bidding package Consultancy on verification of technical and financial accounts (including traffic safety verification) of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải.
13/06/2023 19:23
The Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted the results of the bidding package Estimation consulting of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải.
13/06/2023 19:17
The Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted the results of the bidding package Clearing mines and explosives of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải.
13/06/2023 19:01
The Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted the results of the bidding package Consulting, supervising and surveying the steps of technical design and engineering design of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải.
13/06/2023 18:51
The Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted the request Approving the adjustment of the content of package 13 (Consultation on preparation of Bidding Documents, Bidding Documents and Evaluation of Proposal and Bid) of component 3 project of Bien Hoa - Vung Tau expressway construction investment project phase 1 of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải with 1 bidding package.
26/05/2023 13:37
Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted Tender Notice Experimenting bored piles, Osterberg during the construction and installation of the bridge leading from the beginning of the route to the T36-T37 pillar of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải with the form Open bidding.
19/05/2023 10:38
Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted Tender Notice Construction supervision consultant for main bridge from T37 to T40 pillar (including water traffic regulation) of the investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải with the form Open bidding.
11/05/2023 16:21
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted 1 of the contractor selection plan, which contains 1 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted 5 Tender Notice in the 5 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 5 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has a relationship with 3 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải is the investor of 5 package, of which 5 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải is the owner of 1 contractor selection plan. In which, they self-invite 1 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban Quản lý dự án Giao thông Khu vực cảng Cái Mép Thị Vải is an investor with 3 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code