Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. as follows:
- Has relationships with 5 contractor.
- Announced 7 investment development project, of which 7 projects have not yet announced the prequalification documents.
- Announced 6 contractor selection plans with a total of 35 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 19 packages (with 20 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 4 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 34 packages that have not fully posted the contractor selection results. Of these 31 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 5.00%, Construction 95.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 5,671,618,000 VND, of which the total winning bid value is: 5,603,918,000 VND.
- The savings rate is: 1.19%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. as follows:
- Has relationships with 5 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 5.00%, Construction 95.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 5,671,618,000 VND, in which the total winning value is: 5,603,918,000 VND.
- The savings rate is: 1.19%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 7 investment and development projects.
- As the owner of 6 Contractor selection plan in which 6 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 13 bidding packages in which 13 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. Posted Development Investment Project Construction of technical infrastructure to create land fund in Vinh Ninh commune, Quang Ninh district.
11/07/2023 14:14
The Bid solicitor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. has posted the request Construction contractor selection plan: Upgrading the road from Vinh Tuy village 1 to Vinh Tuy village 3 of the investor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. with 2 bidding package.
04/07/2023 09:14
Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. Posted Development Investment Project Upgrading the road from Vinh Tuy 1 village to Vinh Tuy 3 village.
04/07/2023 08:08
Bid solicitor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. has posted Tender Notice Package 3: Construction and installation (including contingency costs) of the investor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. with the form Open bidding.
21/06/2023 11:12
Bid solicitor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. has posted Tender Notice Civil Works of the investor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. with the form Open bidding.
21/06/2023 10:36
Bid solicitor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. has posted Tender Notice Package 3: Construction and installation (including contingency costs, traffic safety costs, auxiliary costs for bridge construction) of the investor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. with the form Open bidding.
12/06/2023 09:51
Bid solicitor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. has posted Tender Notice Construction + equipment (new construction of Truong Son Commune Health Station) (Including contingency costs) of the investor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. with the form Open bidding.
06/06/2023 15:45
Bid solicitor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. has posted Tender Notice Construction (Including construction cost+contingency cost+traffic guarantee) of the investor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. with the form Open bidding.
05/06/2023 16:22
The Bid solicitor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. has posted the request Project contractor selection plan: Anti-erosion embankment in Hien Ninh and Truong Xuan communes of the investor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. with 8 bidding package.
05/06/2023 14:13
Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. Posted Development Investment Project Building embankments to prevent landslides in Hien Ninh and Truong Xuan communes.
05/06/2023 13:13
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. publishes the plan Construction contractor selection plan: Upgrading the road from Vinh Tuy village 1 to Vinh Tuy village 3 with 2 bidding package .
04/07/2023 09:14
Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. publishes Tender Notice Package 3: Construction and installation (including contingency costs) in the form Open bidding .
21/06/2023 11:12
Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. publishes Tender Notice Civil Works in the form Open bidding .
21/06/2023 10:36
Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. publishes Tender Notice Package 3: Construction and installation (including contingency costs, traffic safety costs, auxiliary costs for bridge construction) in the form Open bidding .
12/06/2023 09:51
Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. publishes Tender Notice Construction + equipment (new construction of Truong Son Commune Health Station) (Including contingency costs) in the form Open bidding .
06/06/2023 15:45
Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. publishes Tender Notice Construction (Including construction cost+contingency cost+traffic guarantee) in the form Open bidding .
05/06/2023 16:22
Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. publishes the plan Project contractor selection plan: Anti-erosion embankment in Hien Ninh and Truong Xuan communes with 8 bidding package .
05/06/2023 14:13
Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. announced the results of the bid package Package 3: Construction and installation (including cost of safety, contingency cost) .
- Winning bidder: CÔNG TY TNHH HOÀNG HƯNG, CÔNG TY TNHH THƯƠNG MẠI & XÂY DỰNG TỔNG HỢP HOÀNG HUY
03/06/2023 14:38
Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. publishes Tender Notice Construction + Equipment (Renovating and upgrading district health centers and medical stations) (including contingency costs) in the form Open bidding .
02/06/2023 14:36
Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. publishes Tender Notice Construction (Including Construction cost + Contingency cost) in the form Open bidding .
02/06/2023 09:40
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. Posted Development Investment Project Construction of technical infrastructure to create land fund in Vinh Ninh commune, Quang Ninh district.
11/07/2023 14:14
The Bid solicitor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. has posted the request Construction contractor selection plan: Upgrading the road from Vinh Tuy village 1 to Vinh Tuy village 3 of the investor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. with 2 bidding package.
04/07/2023 09:14
Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. Posted Development Investment Project Upgrading the road from Vinh Tuy 1 village to Vinh Tuy 3 village.
04/07/2023 08:08
Bid solicitor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. has posted Tender Notice Package 3: Construction and installation (including contingency costs) of the investor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. with the form Open bidding.
21/06/2023 11:12
Bid solicitor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. has posted Tender Notice Civil Works of the investor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. with the form Open bidding.
21/06/2023 10:36
Bid solicitor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. has posted Tender Notice Package 3: Construction and installation (including contingency costs, traffic safety costs, auxiliary costs for bridge construction) of the investor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. with the form Open bidding.
12/06/2023 09:51
Bid solicitor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. has posted Tender Notice Construction + equipment (new construction of Truong Son Commune Health Station) (Including contingency costs) of the investor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. with the form Open bidding.
06/06/2023 15:45
Bid solicitor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. has posted Tender Notice Construction (Including construction cost+contingency cost+traffic guarantee) of the investor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. with the form Open bidding.
05/06/2023 16:22
The Bid solicitor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. has posted the request Project contractor selection plan: Anti-erosion embankment in Hien Ninh and Truong Xuan communes of the investor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. with 8 bidding package.
05/06/2023 14:13
Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. Posted Development Investment Project Building embankments to prevent landslides in Hien Ninh and Truong Xuan communes.
05/06/2023 13:13
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. has posted 6 of the contractor selection plan, which contains 35 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. has posted 20 Tender Notice in the 19 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. has posted 4 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 4 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. has a relationship with 5 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. is the investor of 13 package, of which 13 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. is the owner of 6 contractor selection plan. In which, they self-invite 6 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. is an investor with 5 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. is the investor of 7 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code