Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái as follows:
- Has relationships with 5 contractor.
- Announced 4 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 16 contractor selection plans with a total of 75 bidding packages, of which 8 prequalification documents have not found the investment project.
- Has invited bids for 14 packages (with 15 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 13 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 10 packages with results that do not have tender notice or prequalification notice.
- There are 69 packages that have not fully posted the contractor selection results. Of these 64 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 6.67%, Construction 26.67%, Consultancy 60.00%, Non-consultancy 6.67%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 7,887,438,359 VND, of which the total winning bid value is: 6,897,386,000 VND.
- The savings rate is: 12.55%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái as follows:
- Has relationships with 5 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 6.67%, Construction 26.67%, Consulting 60.00%, Non-consulting 6.67%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 7,887,438,359 VND, in which the total winning value is: 6,897,386,000 VND.
- The savings rate is: 12.55%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 4 investment and development projects.
- As the owner of 16 Contractor selection plan in which 16 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 15 bidding packages in which 15 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted Tender Notice Tender package No 09: Construction of Yen Bai College of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái with the form Open bidding.
12/07/2023 16:21
Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted Tender Notice Package 07: Procurement and installation of construction equipment for Luc Yen Intermediate School of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái with the form Open bidding.
30/06/2023 17:01
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted the results of the bidding package Package 04: Consulting on setting up survey tasks, designing construction drawings for construction investment projects, new construction, upgrading, renovation and equipment procurement for 07 district and provincial health centers Yen Bai. of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái.
27/06/2023 16:40
Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted Tender Notice Package 05: Consulting survey, making design documents, construction drawings and construction cost estimates Emergency treatment of embankment against landslides on the right bank of the Red River, Quy Mong commune, Tran Yen district of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái with the form Open bidding.
23/06/2023 15:53
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted the results of the bidding package Package 04: Consulting survey, making design documents, construction drawings and construction cost estimates Investing in upgrading, renovating and purchasing equipment for the Provincial Center for Disease Control (CDC) Yen Bai of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái.
22/06/2023 16:15
Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted Tender Notice Package 05: Consulting survey, making design documents, construction drawings and construction cost estimates New construction investment projects, upgrading, renovating and procuring equipment for 07 Medical Centers district level, Yen Bai province. of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái with the form Open bidding.
22/06/2023 15:04
Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted Tender Notice Tender package No 23: Construction of Son Luong - Nam Muoi - Sung Do road, Van Chan district, Yen Bai province (Item: The route extends from the end of branch A, section 2 to Na Noi village, Sung commune. Dollar) of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái with the form Open bidding.
20/06/2023 15:17
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted the request The plan for selecting contractors for the construction investment project of the project Emergency treatment of embankments against landslides on the right bank of the Red River, Quy Mong commune, Tran Yen district of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái with 7 bidding package.
19/06/2023 09:32
Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái Posted Development Investment Project Emergency treatment of anti-erosion embankment on the right bank of the Red River, Quy Mong commune, Tran Yen district.
19/06/2023 08:08
Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted Tender Notice Package 07: Consulting survey, making design documents, construction drawings - construction cost estimates for the construction of a new urban area (Land fund on the road from Bach Lam bridge to Tuan Quan), Yen Ninh ward, Yen Bai city of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái with the form Open bidding.
17/06/2023 17:36
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái publishes Tender Notice Tender package No 09: Construction of Yen Bai College in the form Open bidding .
12/07/2023 16:21
Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái publishes Tender Notice Package 07: Procurement and installation of construction equipment for Luc Yen Intermediate School in the form Open bidding .
30/06/2023 17:01
Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái announced the results of the bid package Package 04: Consulting on setting up survey tasks, designing construction drawings for construction investment projects, new construction, upgrading, renovation and equipment procurement for 07 district and provincial health centers Yen Bai. .
- Winning bidder:
27/06/2023 16:40
Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái publishes Tender Notice Package 05: Consulting survey, making design documents, construction drawings and construction cost estimates Emergency treatment of embankment against landslides on the right bank of the Red River, Quy Mong commune, Tran Yen district in the form Open bidding .
23/06/2023 15:53
Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái announced the results of the bid package Package 04: Consulting survey, making design documents, construction drawings and construction cost estimates Investing in upgrading, renovating and purchasing equipment for the Provincial Center for Disease Control (CDC) Yen Bai .
- Winning bidder:
22/06/2023 16:15
Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái publishes Tender Notice Package 05: Consulting survey, making design documents, construction drawings and construction cost estimates New construction investment projects, upgrading, renovating and procuring equipment for 07 Medical Centers district level, Yen Bai province. in the form Open bidding .
22/06/2023 15:04
Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái publishes Tender Notice Tender package No 23: Construction of Son Luong - Nam Muoi - Sung Do road, Van Chan district, Yen Bai province (Item: The route extends from the end of branch A, section 2 to Na Noi village, Sung commune. Dollar) in the form Open bidding .
20/06/2023 15:17
Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái publishes the plan The plan for selecting contractors for the construction investment project of the project Emergency treatment of embankments against landslides on the right bank of the Red River, Quy Mong commune, Tran Yen district with 7 bidding package .
19/06/2023 09:32
Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái publishes Tender Notice Package 07: Consulting survey, making design documents, construction drawings - construction cost estimates for the construction of a new urban area (Land fund on the road from Bach Lam bridge to Tuan Quan), Yen Ninh ward, Yen Bai city in the form Open bidding .
17/06/2023 17:36
Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái publishes the plan The plan for selecting contractors under the construction investment project of building a new urban area (Land fund on the road from Bach Lam bridge to Tuan Quan), Yen Ninh ward, Yen Bai city (phase 1) with 11 bidding package .
16/06/2023 17:21
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted Tender Notice Tender package No 09: Construction of Yen Bai College of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái with the form Open bidding.
12/07/2023 16:21
Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted Tender Notice Package 07: Procurement and installation of construction equipment for Luc Yen Intermediate School of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái with the form Open bidding.
30/06/2023 17:01
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted the results of the bidding package Package 04: Consulting on setting up survey tasks, designing construction drawings for construction investment projects, new construction, upgrading, renovation and equipment procurement for 07 district and provincial health centers Yen Bai. of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái.
27/06/2023 16:40
Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted Tender Notice Package 05: Consulting survey, making design documents, construction drawings and construction cost estimates Emergency treatment of embankment against landslides on the right bank of the Red River, Quy Mong commune, Tran Yen district of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái with the form Open bidding.
23/06/2023 15:53
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted the results of the bidding package Package 04: Consulting survey, making design documents, construction drawings and construction cost estimates Investing in upgrading, renovating and purchasing equipment for the Provincial Center for Disease Control (CDC) Yen Bai of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái.
22/06/2023 16:15
Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted Tender Notice Package 05: Consulting survey, making design documents, construction drawings and construction cost estimates New construction investment projects, upgrading, renovating and procuring equipment for 07 Medical Centers district level, Yen Bai province. of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái with the form Open bidding.
22/06/2023 15:04
Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted Tender Notice Tender package No 23: Construction of Son Luong - Nam Muoi - Sung Do road, Van Chan district, Yen Bai province (Item: The route extends from the end of branch A, section 2 to Na Noi village, Sung commune. Dollar) of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái with the form Open bidding.
20/06/2023 15:17
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted the request The plan for selecting contractors for the construction investment project of the project Emergency treatment of embankments against landslides on the right bank of the Red River, Quy Mong commune, Tran Yen district of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái with 7 bidding package.
19/06/2023 09:32
Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái Posted Development Investment Project Emergency treatment of anti-erosion embankment on the right bank of the Red River, Quy Mong commune, Tran Yen district.
19/06/2023 08:08
Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted Tender Notice Package 07: Consulting survey, making design documents, construction drawings - construction cost estimates for the construction of a new urban area (Land fund on the road from Bach Lam bridge to Tuan Quan), Yen Ninh ward, Yen Bai city of the investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái with the form Open bidding.
17/06/2023 17:36
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted 16 of the contractor selection plan, which contains 75 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted 15 Tender Notice in the 14 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has posted 13 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 13 package, canceled the bid 0 package (among the bidding packages above).
- There are 10 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has a relationship with 5 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái is the investor of 15 package, of which 15 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái is the owner of 16 contractor selection plan. In which, they self-invite 16 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái is an investor with 5 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng tỉnh Yên Bái is the investor of 4 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register