Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai as follows:
- Has relationships with 0 contractor.
- Announced 4 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 4 contractor selection plans with a total of 14 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 3 packages (with 3 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 14 packages that have not fully posted the contractor selection results. Of these 12 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 66.67%, Consultancy 33.33%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 66.67%, Consulting 33.33%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 4 investment and development projects.
- As the owner of 4 Contractor selection plan in which 4 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 3 bidding packages in which 3 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai Posted Development Investment Project Upgrading and expanding the road from Cau Ham 3, Ho Phong ward to the border with Quyet Chien hamlet, An Trach A commune, Dong Hai district.
14/07/2023 15:15
Bid solicitor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai has posted Tender Notice Tender package No 02: Construction work of the investor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai with the form Open bidding.
14/07/2023 13:42
Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai Posted Development Investment Project New construction of Anh Xuan canal route.
14/07/2023 13:13
Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai Posted Development Investment Project New construction of the school road Hamlet 4, Ward 1.
14/07/2023 11:11
Bid solicitor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai has posted Tender Notice Tender package No 02: Construction work of the investor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai with the form Open bidding.
05/07/2023 17:44
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai has posted the request Building a path to Phong Tan Commune People's Committee Headquarters of the investor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai with 6 bidding package.
05/07/2023 16:20
Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai Posted Development Investment Project Building a path to Phong Tan Commune People's Committee Headquarters.
05/07/2023 16:16
Bid solicitor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai has posted Tender Notice Package 02: Geological and topographic survey consultancy, preparation of feasibility study report (preparation of technical report) of the investor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai with the form Open bidding.
05/07/2023 15:45
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai has posted the request Approving the contractor selection plan for the preparation costs of the project Investment in infrastructure combined with solidification of embankments to serve agricultural production in Gia Rai town of the investor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai with 4 bidding package.
28/06/2023 09:16
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai has posted the request Approving the contractor selection plan (feasibility study report preparation step) project of constructing rural road on the south bank of Quan Lo Phung Hiep canal (section of Phong Thanh Tay commune) of the investor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai with 4 bidding package.
28/06/2023 08:49
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai publishes Tender Notice Tender package No 02: Construction work in the form Open bidding .
14/07/2023 13:42
Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai publishes Tender Notice Tender package No 02: Construction work in the form Open bidding .
05/07/2023 17:44
Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai publishes the plan Building a path to Phong Tan Commune People's Committee Headquarters with 6 bidding package .
05/07/2023 16:20
Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai publishes Tender Notice Package 02: Geological and topographic survey consultancy, preparation of feasibility study report (preparation of technical report) in the form Open bidding .
05/07/2023 15:45
Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai publishes the plan Approving the contractor selection plan for the preparation costs of the project Investment in infrastructure combined with solidification of embankments to serve agricultural production in Gia Rai town with 4 bidding package .
28/06/2023 09:16
Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai publishes the plan Approving the contractor selection plan (feasibility study report preparation step) project of constructing rural road on the south bank of Quan Lo Phung Hiep canal (section of Phong Thanh Tay commune) with 4 bidding package .
28/06/2023 08:49
Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai publishes the plan Approving the contractor selection plan (feasibility study report preparation step) project of constructing rural road on the south bank of Quan Lo Phung Hiep canal (section of Phong Thanh Tay commune) with 4 bidding package .
28/06/2023 08:44
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai Posted Development Investment Project Upgrading and expanding the road from Cau Ham 3, Ho Phong ward to the border with Quyet Chien hamlet, An Trach A commune, Dong Hai district.
14/07/2023 15:15
Bid solicitor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai has posted Tender Notice Tender package No 02: Construction work of the investor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai with the form Open bidding.
14/07/2023 13:42
Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai Posted Development Investment Project New construction of Anh Xuan canal route.
14/07/2023 13:13
Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai Posted Development Investment Project New construction of the school road Hamlet 4, Ward 1.
14/07/2023 11:11
Bid solicitor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai has posted Tender Notice Tender package No 02: Construction work of the investor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai with the form Open bidding.
05/07/2023 17:44
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai has posted the request Building a path to Phong Tan Commune People's Committee Headquarters of the investor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai with 6 bidding package.
05/07/2023 16:20
Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai Posted Development Investment Project Building a path to Phong Tan Commune People's Committee Headquarters.
05/07/2023 16:16
Bid solicitor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai has posted Tender Notice Package 02: Geological and topographic survey consultancy, preparation of feasibility study report (preparation of technical report) of the investor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai with the form Open bidding.
05/07/2023 15:45
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai has posted the request Approving the contractor selection plan for the preparation costs of the project Investment in infrastructure combined with solidification of embankments to serve agricultural production in Gia Rai town of the investor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai with 4 bidding package.
28/06/2023 09:16
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai has posted the request Approving the contractor selection plan (feasibility study report preparation step) project of constructing rural road on the south bank of Quan Lo Phung Hiep canal (section of Phong Thanh Tay commune) of the investor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai with 4 bidding package.
28/06/2023 08:49
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai has posted 4 of the contractor selection plan, which contains 14 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai has posted 3 Tender Notice in the 3 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai is the investor of 3 package, of which 3 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai is the owner of 4 contractor selection plan. In which, they self-invite 4 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban Quản lý dự án đầu tư xây dựng thị xã Giá Rai is the investor of 4 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register