Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái as follows:
- Has relationships with 0 contractor.
- Announced 18 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 23 contractor selection plans with a total of 85 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 16 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 79 packages that have not fully posted the contractor selection results. Of these 67 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 769,160,043 VND, of which the total winning bid value is: 760,952,000 VND.
- The savings rate is: 1.07%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 769,160,043 VND, in which the total winning value is: 760,952,000 VND.
- The savings rate is: 1.07%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 18 investment and development projects.
- As the owner of 23 Contractor selection plan in which 23 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 16 bidding packages in which 0 packages are self-invited, and 16 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái Posted Development Investment Project Renovating and upgrading Le Truc street, Dong Tam ward, Yen Bai city.
14/07/2023 09:09
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái Posted Development Investment Project Residential land fund in Tien Phong village (adjacent to Bao Lu resettlement area), Gioi Phien commune, Yen Bai city.
12/07/2023 10:10
The Bid solicitor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái has posted the request The plan to select contractors for consultancy packages to prepare for investment project Paving the corridor of Dien Bien street (section from Cau Dai to Km4 market) and Dinh Tien Hoang street (section from Practice Kindergarten to Km6 market), city Yen Bai street of the investor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái with 3 bidding package.
05/07/2023 14:34
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái Posted Development Investment Project Paving the corridor of Dien Bien street (section from Cau Dai to Km4 market) and Dinh Tien Hoang street (section from Practice Kindergarten to Km6 market), Yen Bai city.
05/07/2023 14:14
The Bid solicitor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái has posted the request The contractor selection plan under the economic - technical report on construction investment for the renovation and repair of Yen Bai city stadium of the investor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái with 5 bidding package.
04/07/2023 17:18
The Bid solicitor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái has posted the request Plan to select contractors for bidding packages to prepare for project investment: Renovating and upgrading canals in Dong Thuc, Rang Nhan, Minh Bao communes of the investor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái with 2 bidding package.
30/06/2023 10:32
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái Posted Development Investment Project Renovating and upgrading canals in the fields of Dong Thuc, Rang Nhan, Minh Bao commune.
30/06/2023 10:10
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái Posted Development Investment Project Renovating and repairing Yen Bai city stadium.
29/06/2023 15:15
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái Posted Development Investment Project Renovating and upgrading Tran Huy Lieu street (area along Thuy Thuy lake), Yen Bai city.
29/06/2023 15:15
The Bid solicitor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái has posted the results of the bidding package Consulting and verifying Design of construction drawings and project construction estimates Ancillary items for communication work of Hong Ha theater, Yen Bai city. of the investor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái.
29/06/2023 15:13
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái publishes the plan The plan to select contractors for consultancy packages to prepare for investment project Paving the corridor of Dien Bien street (section from Cau Dai to Km4 market) and Dinh Tien Hoang street (section from Practice Kindergarten to Km6 market), city Yen Bai street with 3 bidding package .
05/07/2023 14:34
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái publishes the plan The contractor selection plan under the economic - technical report on construction investment for the renovation and repair of Yen Bai city stadium with 5 bidding package .
04/07/2023 17:18
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái publishes the plan Plan to select contractors for bidding packages to prepare for project investment: Renovating and upgrading canals in Dong Thuc, Rang Nhan, Minh Bao communes with 2 bidding package .
30/06/2023 10:32
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái announced the results of the bid package Consulting and verifying Design of construction drawings and project construction estimates Ancillary items for communication work of Hong Ha theater, Yen Bai city. .
- Winning bidder:
29/06/2023 15:13
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái announced the results of the bid package Package 04: Construction supervision of the renovation and expansion of Lo Noi People's Cemetery .
- Winning bidder:
28/06/2023 16:07
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái publishes the plan The contractor selection plan included in the economic-technical report on construction investment Renovating, upgrading and expanding the working houses of the Fatherland Front agencies and socio-political organizations, the City Propaganda Department Party Committee, Yen Bai city with 5 bidding package .
27/06/2023 15:58
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái publishes the plan Contractor selection plan under Economic - technical report on construction investment Ancillary items for communication work of Hong Ha theater, Yen Bai city. with 5 bidding package .
26/06/2023 10:20
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái publishes the plan The plan for selecting contractors in the economic - technical report on construction investment: Renovating and repairing the working house of the City Party Committee, Yen Bai city with 5 bidding package .
23/06/2023 08:23
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái publishes the plan The plan for selecting contractors for investment preparation consultancy bidding packages, making economic and technical reports on construction investment: Renovating and repairing the working houses of the City Party Committee, Yen Bai city with 3 bidding package .
21/06/2023 16:21
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái publishes the plan The contractor selection plan is included in the economic - technical report on investment and construction of the multi-purpose cultural house in Nam Cuong ward, Yen Bai city. with 5 bidding package .
15/06/2023 15:51
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái Posted Development Investment Project Renovating and upgrading Le Truc street, Dong Tam ward, Yen Bai city.
14/07/2023 09:09
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái Posted Development Investment Project Residential land fund in Tien Phong village (adjacent to Bao Lu resettlement area), Gioi Phien commune, Yen Bai city.
12/07/2023 10:10
The Bid solicitor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái has posted the request The plan to select contractors for consultancy packages to prepare for investment project Paving the corridor of Dien Bien street (section from Cau Dai to Km4 market) and Dinh Tien Hoang street (section from Practice Kindergarten to Km6 market), city Yen Bai street of the investor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái with 3 bidding package.
05/07/2023 14:34
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái Posted Development Investment Project Paving the corridor of Dien Bien street (section from Cau Dai to Km4 market) and Dinh Tien Hoang street (section from Practice Kindergarten to Km6 market), Yen Bai city.
05/07/2023 14:14
The Bid solicitor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái has posted the request The contractor selection plan under the economic - technical report on construction investment for the renovation and repair of Yen Bai city stadium of the investor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái with 5 bidding package.
04/07/2023 17:18
The Bid solicitor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái has posted the request Plan to select contractors for bidding packages to prepare for project investment: Renovating and upgrading canals in Dong Thuc, Rang Nhan, Minh Bao communes of the investor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái with 2 bidding package.
30/06/2023 10:32
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái Posted Development Investment Project Renovating and upgrading canals in the fields of Dong Thuc, Rang Nhan, Minh Bao commune.
30/06/2023 10:10
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái Posted Development Investment Project Renovating and repairing Yen Bai city stadium.
29/06/2023 15:15
Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái Posted Development Investment Project Renovating and upgrading Tran Huy Lieu street (area along Thuy Thuy lake), Yen Bai city.
29/06/2023 15:15
The Bid solicitor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái has posted the results of the bidding package Consulting and verifying Design of construction drawings and project construction estimates Ancillary items for communication work of Hong Ha theater, Yen Bai city. of the investor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái.
29/06/2023 15:13
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái has posted 23 of the contractor selection plan, which contains 85 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái has posted 16 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 16 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: Investor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái is the owner of 23 contractor selection plan. In which, they self-invite 23 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban quản lý dự án đầu tư xây dựng thành phố Yên Bái is the investor of 18 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code