Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long as follows:
- Has relationships with 15 contractor.
- Announced 16 investment development project, of which 6 projects have not yet announced the prequalification documents.
- Announced 36 contractor selection plans with a total of 141 bidding packages, of which 13 prequalification documents have not found the investment project.
- Has invited bids for 33 packages (with 38 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 10 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 1 packages with results that do not have tender notice or prequalification notice.
- There are 137 packages that have not fully posted the contractor selection results. Of these 125 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.00 contractors.
- Breakdown by bidding field: Goods 2.63%, Construction 63.16%, Consultancy 18.42%, Non-consultancy 15.79%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 178,124,993,000 VND, of which the total winning bid value is: 138,190,971,940 VND.
- The savings rate is: 22.42%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long as follows:
- Has relationships with 15 contractor.
- The average number of contractors participating in each bidding package is: 2.00 contractors.
- Proportion of bidding fields: Goods 2.63%, Construction 63.16%, Consulting 18.42%, Non-consulting 15.79%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 178,124,993,000 VND, in which the total winning value is: 138,190,971,940 VND.
- The savings rate is: 22.42%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 16 investment and development projects.
- As the owner of 36 Contractor selection plan in which 36 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 37 bidding packages in which 37 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted the results of the bidding package Package 11: Power supply. of the investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long .
- Winning bidder: CÔNG TY CỔ PHẦN THƯƠNG MẠI VÀ XÂY DỰNG ĐIỆN QUẢNG NINH
19/07/2023 16:40
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted the results of the bidding package Package 02: Construction and installation of the investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long .
08/07/2023 15:18
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted the request The plan to select the consulting contractor before the decision to approve the project is made: Renovating and upgrading the regulating reservoir of Ong Do dam and the system of roads and sewers in Group 1, Yen Cu area, Dai Yen ward, city Ha Long of the investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long with 1 bidding package.
05/07/2023 14:18
Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted Tender Notice Tender package No 19: Construction insurance of the investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long with the form Open bidding.
01/07/2023 16:29
Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted Tender Notice Package 19: Procurement of equipment and furniture of the investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long with the form Open bidding.
30/06/2023 19:13
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted the request Adjustment of the contractor selection plan for package 19 of the project: Upgrading, renovating and expanding the inter-commune road, the road from Mo Dong, Son Duong commune to the center of Dong Son commune of the investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long with 1 bidding package.
27/06/2023 16:03
Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted Tender Notice Package 01: Periodic health check of the investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long with the form Shortened competitive offer.
26/06/2023 18:02
Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long Posted Development Investment Project Handling road landslides and overflowing underground in Khe Tre hamlet, Dong Tra village, Dong Lam commune (Dang Van Song house section).
24/06/2023 15:15
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted the request Project contractor selection plan: Treating road landslides and overflowing underground in Khe Tre hamlet, Dong Tra village, Dong Lam commune (Dang Van Song house section) of the investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long with 2 bidding package.
24/06/2023 15:10
Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted Tender Notice Package 02: Designing construction drawings and making total cost estimates. of the investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long with the form Open bidding.
22/06/2023 17:53
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long announced the results of the bid package Package 11: Power supply. .
- Winning bidder: CÔNG TY CỔ PHẦN THƯƠNG MẠI VÀ XÂY DỰNG ĐIỆN QUẢNG NINH
19/07/2023 16:40
Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long announced the results of the bid package Package 02: Construction and installation .
- Winning bidder:
08/07/2023 15:18
Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long publishes the plan The plan to select the consulting contractor before the decision to approve the project is made: Renovating and upgrading the regulating reservoir of Ong Do dam and the system of roads and sewers in Group 1, Yen Cu area, Dai Yen ward, city Ha Long with 1 bidding package .
05/07/2023 14:18
Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long publishes Tender Notice Tender package No 19: Construction insurance in the form Open bidding .
01/07/2023 16:29
Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long publishes Tender Notice Package 19: Procurement of equipment and furniture in the form Open bidding .
30/06/2023 19:13
Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long publishes the plan Adjustment of the contractor selection plan for package 19 of the project: Upgrading, renovating and expanding the inter-commune road, the road from Mo Dong, Son Duong commune to the center of Dong Son commune with 1 bidding package .
27/06/2023 16:03
Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long publishes Tender Notice Package 01: Periodic health check in the form Shortened competitive offer .
26/06/2023 18:02
Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long publishes the plan Project contractor selection plan: Treating road landslides and overflowing underground in Khe Tre hamlet, Dong Tra village, Dong Lam commune (Dang Van Song house section) with 2 bidding package .
24/06/2023 15:10
Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long publishes Tender Notice Package 02: Designing construction drawings and making total cost estimates. in the form Open bidding .
22/06/2023 17:53
Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long publishes the plan Adjustment of the project contractor selection plan: New construction of Ngo Quyen High School in Ha Khanh ward, Ha Long city has been approved by the City People's Committee in Decision No. 4095/QD-UBND dated November 5, 2022 with 10 bidding package .
21/06/2023 19:16
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted the results of the bidding package Package 11: Power supply. of the investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long .
- Winning bidder: CÔNG TY CỔ PHẦN THƯƠNG MẠI VÀ XÂY DỰNG ĐIỆN QUẢNG NINH
19/07/2023 16:40
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted the results of the bidding package Package 02: Construction and installation of the investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long .
08/07/2023 15:18
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted the request The plan to select the consulting contractor before the decision to approve the project is made: Renovating and upgrading the regulating reservoir of Ong Do dam and the system of roads and sewers in Group 1, Yen Cu area, Dai Yen ward, city Ha Long of the investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long with 1 bidding package.
05/07/2023 14:18
Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted Tender Notice Tender package No 19: Construction insurance of the investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long with the form Open bidding.
01/07/2023 16:29
Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted Tender Notice Package 19: Procurement of equipment and furniture of the investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long with the form Open bidding.
30/06/2023 19:13
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted the request Adjustment of the contractor selection plan for package 19 of the project: Upgrading, renovating and expanding the inter-commune road, the road from Mo Dong, Son Duong commune to the center of Dong Son commune of the investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long with 1 bidding package.
27/06/2023 16:03
Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted Tender Notice Package 01: Periodic health check of the investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long with the form Shortened competitive offer.
26/06/2023 18:02
Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long Posted Development Investment Project Handling road landslides and overflowing underground in Khe Tre hamlet, Dong Tra village, Dong Lam commune (Dang Van Song house section).
24/06/2023 15:15
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted the request Project contractor selection plan: Treating road landslides and overflowing underground in Khe Tre hamlet, Dong Tra village, Dong Lam commune (Dang Van Song house section) of the investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long with 2 bidding package.
24/06/2023 15:10
Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted Tender Notice Package 02: Designing construction drawings and making total cost estimates. of the investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long with the form Open bidding.
22/06/2023 17:53
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted 36 of the contractor selection plan, which contains 141 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted 38 Tender Notice in the 33 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has posted 10 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 10 package, canceled the bid 0 package (among the bidding packages above).
- There are 1 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has a relationship with 15 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long is the investor of 37 package, of which 37 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long is the owner of 36 contractor selection plan. In which, they self-invite 36 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long is an investor with 12 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng thành phố Hạ Long is the investor of 16 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code