Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang as follows:
- Has relationships with 10 contractor.
- Announced 23 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 59 contractor selection plans with a total of 101 bidding packages, of which 32 prequalification documents have not found the investment project.
- Has invited bids for 30 packages (with 32 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 25 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 15 packages with results that do not have tender notice or prequalification notice.
- There are 87 packages that have not fully posted the contractor selection results. Of these 71 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 3.13%, Construction 93.75%, Consultancy 3.13%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 46,497,070,000 VND, of which the total winning bid value is: 46,368,264,000 VND.
- The savings rate is: 0.28%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang as follows:
- Has relationships with 10 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 3.13%, Construction 93.75%, Consulting 3.13%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 46,497,070,000 VND, in which the total winning value is: 46,368,264,000 VND.
- The savings rate is: 0.28%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 23 investment and development projects.
- As the owner of 59 Contractor selection plan in which 59 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 32 bidding packages in which 32 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the request The plan to select the survey consultant contractor, prepare the economic - technical report for the construction of the rural road from Khau Trang, Na Sen to Na Giao area, Khuoi Phai village, Hong Thai commune,
Na Hang district, Tuyen Quang province of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang with 1 bidding package.
20/07/2023 11:30
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the request Plan for selection of contractors for construction works Construction of rural transport infrastructure system, Ban Nuay village, Na Chang village, Khong May village, Nang Kha commune, Na Hang district, Tuyen Quang province of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang with 2 bidding package.
20/07/2023 11:25
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the request The plan to select contractors for construction works Drainage ditches for roads in Na La village, Son Phu commune, Na Hang district, Tuyen Quang province of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang with 2 bidding package.
20/07/2023 11:14
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the request The plan to select the construction contractor for the construction of embankments to protect fields in Na Chang village, Nang Kha commune, Na Hang district, Tuyen Quang province of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang with 2 bidding package.
20/07/2023 11:04
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the results of the bidding package Package 01: Consulting survey, making economic - technical reports for construction works of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang.
19/07/2023 17:26
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the request Planning for selection of survey consultancy contractors, preparation of construction economic - technical reports; consulting, verifying the design and construction cost estimate of the rural traffic road in Na Che, Na Luong village, Yen Hoa commune, Na Hang district, Tuyen Quang province of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang with 2 bidding package.
19/07/2023 17:21
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the request Planning for selection of survey consultancy contractors, preparation of construction economic - technical reports; consulting, verifying design and construction estimate for construction of rural roads in Ban Luc village, Na Pin village, Na Duc village, Da Vi commune, Na Hang district, Tuyen Quang province of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang with 2 bidding package.
19/07/2023 17:18
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the request Contractor selection plan Consultant for making construction drawing design and cost estimate; Consultancy and verification of construction drawing design and cost estimate of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang with 2 bidding package.
19/07/2023 16:59
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the request Contractor selection plan Consultant for making construction drawing design and cost estimate; Consultancy and verification of construction drawing design and cost estimate of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang with 2 bidding package.
19/07/2023 16:47
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the request Contractor selection plan Consultant for making construction drawing design and cost estimate; Consultancy and verification of construction drawing design and cost estimate of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang with 2 bidding package.
19/07/2023 16:34
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang publishes the plan The plan to select the survey consultant contractor, prepare the economic - technical report for the construction of the rural road from Khau Trang, Na Sen to Na Giao area, Khuoi Phai village, Hong Thai commune,
Na Hang district, Tuyen Quang province with 1 bidding package .
20/07/2023 11:30
Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang publishes the plan Plan for selection of contractors for construction works Construction of rural transport infrastructure system, Ban Nuay village, Na Chang village, Khong May village, Nang Kha commune, Na Hang district, Tuyen Quang province with 2 bidding package .
20/07/2023 11:25
Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang publishes the plan The plan to select contractors for construction works Drainage ditches for roads in Na La village, Son Phu commune, Na Hang district, Tuyen Quang province with 2 bidding package .
20/07/2023 11:14
Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang publishes the plan The plan to select the construction contractor for the construction of embankments to protect fields in Na Chang village, Nang Kha commune, Na Hang district, Tuyen Quang province with 2 bidding package .
20/07/2023 11:04
Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang announced the results of the bid package Package 01: Consulting survey, making economic - technical reports for construction works .
- Winning bidder:
19/07/2023 17:26
Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang publishes the plan Planning for selection of survey consultancy contractors, preparation of construction economic - technical reports; consulting, verifying the design and construction cost estimate of the rural traffic road in Na Che, Na Luong village, Yen Hoa commune, Na Hang district, Tuyen Quang province with 2 bidding package .
19/07/2023 17:21
Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang publishes the plan Planning for selection of survey consultancy contractors, preparation of construction economic - technical reports; consulting, verifying design and construction estimate for construction of rural roads in Ban Luc village, Na Pin village, Na Duc village, Da Vi commune, Na Hang district, Tuyen Quang province with 2 bidding package .
19/07/2023 17:18
Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang publishes the plan Contractor selection plan Consultant for making construction drawing design and cost estimate; Consultancy and verification of construction drawing design and cost estimate with 2 bidding package .
19/07/2023 16:59
Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang publishes the plan Contractor selection plan Consultant for making construction drawing design and cost estimate; Consultancy and verification of construction drawing design and cost estimate with 2 bidding package .
19/07/2023 16:47
Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang publishes the plan Contractor selection plan Consultant for making construction drawing design and cost estimate; Consultancy and verification of construction drawing design and cost estimate with 2 bidding package .
19/07/2023 16:34
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the request The plan to select the survey consultant contractor, prepare the economic - technical report for the construction of the rural road from Khau Trang, Na Sen to Na Giao area, Khuoi Phai village, Hong Thai commune,
Na Hang district, Tuyen Quang province of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang with 1 bidding package.
20/07/2023 11:30
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the request Plan for selection of contractors for construction works Construction of rural transport infrastructure system, Ban Nuay village, Na Chang village, Khong May village, Nang Kha commune, Na Hang district, Tuyen Quang province of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang with 2 bidding package.
20/07/2023 11:25
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the request The plan to select contractors for construction works Drainage ditches for roads in Na La village, Son Phu commune, Na Hang district, Tuyen Quang province of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang with 2 bidding package.
20/07/2023 11:14
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the request The plan to select the construction contractor for the construction of embankments to protect fields in Na Chang village, Nang Kha commune, Na Hang district, Tuyen Quang province of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang with 2 bidding package.
20/07/2023 11:04
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the results of the bidding package Package 01: Consulting survey, making economic - technical reports for construction works of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang.
19/07/2023 17:26
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the request Planning for selection of survey consultancy contractors, preparation of construction economic - technical reports; consulting, verifying the design and construction cost estimate of the rural traffic road in Na Che, Na Luong village, Yen Hoa commune, Na Hang district, Tuyen Quang province of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang with 2 bidding package.
19/07/2023 17:21
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the request Planning for selection of survey consultancy contractors, preparation of construction economic - technical reports; consulting, verifying design and construction estimate for construction of rural roads in Ban Luc village, Na Pin village, Na Duc village, Da Vi commune, Na Hang district, Tuyen Quang province of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang with 2 bidding package.
19/07/2023 17:18
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the request Contractor selection plan Consultant for making construction drawing design and cost estimate; Consultancy and verification of construction drawing design and cost estimate of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang with 2 bidding package.
19/07/2023 16:59
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the request Contractor selection plan Consultant for making construction drawing design and cost estimate; Consultancy and verification of construction drawing design and cost estimate of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang with 2 bidding package.
19/07/2023 16:47
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted the request Contractor selection plan Consultant for making construction drawing design and cost estimate; Consultancy and verification of construction drawing design and cost estimate of the investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang with 2 bidding package.
19/07/2023 16:34
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted 59 of the contractor selection plan, which contains 101 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted 32 Tender Notice in the 30 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has posted 25 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 25 package, canceled the bid 0 package (among the bidding packages above).
- There are 15 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has a relationship with 10 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang is the investor of 32 package, of which 32 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang is the owner of 59 contractor selection plan. In which, they self-invite 59 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang is an investor with 10 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực huyện Na Hang, tỉnh Tuyên Quang is the investor of 23 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register