Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án đầu tư xây dựng huyện Xín Mần as follows:
- Has relationships with 0 contractor.
- Announced 19 investment development project, of which 5 projects have not yet announced the prequalification documents.
- Announced 28 contractor selection plans with a total of 85 bidding packages, of which 6 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 9 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 81 packages that have not fully posted the contractor selection results. Of these 70 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,519,399,411 VND, of which the total winning bid value is: 1,397,516,799 VND.
- The savings rate is: 8.02%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án đầu tư xây dựng huyện Xín Mần as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,519,399,411 VND, in which the total winning value is: 1,397,516,799 VND.
- The savings rate is: 8.02%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 19 investment and development projects.
- As the owner of 28 Contractor selection plan in which 28 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 18 bidding packages in which 0 packages are self-invited, and 18 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần has posted the results of the bidding package Package 03: Construction supervision consulting service and equipment installation of the investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần.
29/06/2023 07:48
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần has posted the request The contractor selection plan in the investment preparation stage of the project: Domestic water supply in Ta Lu Than village, Pa Vay Su commune of the investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần with 2 bidding package.
28/06/2023 15:05
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần has posted the request Contractor selection plan Project investment preparation stage: Low voltage station Suoi Thau village, Coc Pai town of the investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần with 2 bidding package.
28/06/2023 15:00
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần has posted the results of the bidding package Package 03: Construction supervision consulting service of the investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần.
13/06/2023 08:38
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần has posted the request Renovating and repairing the inter-commune road: Na Chi - Quang Nguyen (section from Khau Lau village, Na Chi commune to the center of Quang Nguyen central commune) of the investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần with 3 bidding package.
07/06/2023 10:02
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần has posted the request Upgrading the route from the center of Trung Thinh commune, Xin Man district to the border with Nang Don commune, Hoang Su Phi district (section from Trung Thinh commune center to Km8 Trung Thinh - Nang Don) of the investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần with 6 bidding package.
07/06/2023 09:48
Ban quản lý dự án đầu tư xây dựng huyện Xín Mần Posted Development Investment Project Upgrading the route from the center of Trung Thinh commune, Xin Man district to the border with Nang Don commune, Hoang Su Phi district (section from Trung Thinh commune center to Km8 Trung Thinh - Nang Don).
07/06/2023 09:09
Ban quản lý dự án đầu tư xây dựng huyện Xín Mần Posted Development Investment Project Renovating and repairing the inter-commune road: Na Chi - Quang Nguyen (section from Khau Lau village, Na Chi commune to the center of Quang Nguyen central commune).
07/06/2023 09:09
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần has posted the request Contractor selection plan in the investment preparation stage of the project: Upgrading the road from the center of Trung Thinh commune, Xin Man district to the border with Nang Don commune, Hoang Su Phi district (the section from the center of Trung Thinh commune to Km8 Trung Thinh - Lady Don) of the investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần with 2 bidding package.
06/06/2023 15:24
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần has posted the request Upgrading and renovating the route from National Highway 4 to Suoi Thau of the investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần with 3 bidding package.
06/06/2023 09:31
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án đầu tư xây dựng huyện Xín Mần announced the results of the bid package Package 03: Construction supervision consulting service and equipment installation .
- Winning bidder:
29/06/2023 07:48
Ban quản lý dự án đầu tư xây dựng huyện Xín Mần publishes the plan The contractor selection plan in the investment preparation stage of the project: Domestic water supply in Ta Lu Than village, Pa Vay Su commune with 2 bidding package .
28/06/2023 15:05
Ban quản lý dự án đầu tư xây dựng huyện Xín Mần publishes the plan Contractor selection plan Project investment preparation stage: Low voltage station Suoi Thau village, Coc Pai town with 2 bidding package .
28/06/2023 15:00
Ban quản lý dự án đầu tư xây dựng huyện Xín Mần announced the results of the bid package Package 03: Construction supervision consulting service .
- Winning bidder:
13/06/2023 08:38
Ban quản lý dự án đầu tư xây dựng huyện Xín Mần publishes the plan Renovating and repairing the inter-commune road: Na Chi - Quang Nguyen (section from Khau Lau village, Na Chi commune to the center of Quang Nguyen central commune) with 3 bidding package .
07/06/2023 10:02
Ban quản lý dự án đầu tư xây dựng huyện Xín Mần publishes the plan Upgrading the route from the center of Trung Thinh commune, Xin Man district to the border with Nang Don commune, Hoang Su Phi district (section from Trung Thinh commune center to Km8 Trung Thinh - Nang Don) with 6 bidding package .
07/06/2023 09:48
Ban quản lý dự án đầu tư xây dựng huyện Xín Mần publishes the plan Contractor selection plan in the investment preparation stage of the project: Upgrading the road from the center of Trung Thinh commune, Xin Man district to the border with Nang Don commune, Hoang Su Phi district (the section from the center of Trung Thinh commune to Km8 Trung Thinh - Lady Don) with 2 bidding package .
06/06/2023 15:24
Ban quản lý dự án đầu tư xây dựng huyện Xín Mần publishes the plan Upgrading and renovating the route from National Highway 4 to Suoi Thau with 3 bidding package .
06/06/2023 09:31
Ban quản lý dự án đầu tư xây dựng huyện Xín Mần publishes the plan Contractor selection plan in the pre-investment stage of the project: Renovating and repairing the inter-commune road: Na Chi - Quang Nguyen (section from Khau Lau village, Na Chi commune to the center of central Quang Nguyen commune) with 3 bidding package .
05/06/2023 10:44
Ban quản lý dự án đầu tư xây dựng huyện Xín Mần publishes the plan Upgrading Trung Thinh Central Market, Xin Man District with 2 bidding package .
01/06/2023 09:08
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần has posted the results of the bidding package Package 03: Construction supervision consulting service and equipment installation of the investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần.
29/06/2023 07:48
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần has posted the request The contractor selection plan in the investment preparation stage of the project: Domestic water supply in Ta Lu Than village, Pa Vay Su commune of the investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần with 2 bidding package.
28/06/2023 15:05
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần has posted the request Contractor selection plan Project investment preparation stage: Low voltage station Suoi Thau village, Coc Pai town of the investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần with 2 bidding package.
28/06/2023 15:00
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần has posted the results of the bidding package Package 03: Construction supervision consulting service of the investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần.
13/06/2023 08:38
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần has posted the request Renovating and repairing the inter-commune road: Na Chi - Quang Nguyen (section from Khau Lau village, Na Chi commune to the center of Quang Nguyen central commune) of the investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần with 3 bidding package.
07/06/2023 10:02
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần has posted the request Upgrading the route from the center of Trung Thinh commune, Xin Man district to the border with Nang Don commune, Hoang Su Phi district (section from Trung Thinh commune center to Km8 Trung Thinh - Nang Don) of the investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần with 6 bidding package.
07/06/2023 09:48
Ban quản lý dự án đầu tư xây dựng huyện Xín Mần Posted Development Investment Project Upgrading the route from the center of Trung Thinh commune, Xin Man district to the border with Nang Don commune, Hoang Su Phi district (section from Trung Thinh commune center to Km8 Trung Thinh - Nang Don).
07/06/2023 09:09
Ban quản lý dự án đầu tư xây dựng huyện Xín Mần Posted Development Investment Project Renovating and repairing the inter-commune road: Na Chi - Quang Nguyen (section from Khau Lau village, Na Chi commune to the center of Quang Nguyen central commune).
07/06/2023 09:09
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần has posted the request Contractor selection plan in the investment preparation stage of the project: Upgrading the road from the center of Trung Thinh commune, Xin Man district to the border with Nang Don commune, Hoang Su Phi district (the section from the center of Trung Thinh commune to Km8 Trung Thinh - Lady Don) of the investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần with 2 bidding package.
06/06/2023 15:24
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần has posted the request Upgrading and renovating the route from National Highway 4 to Suoi Thau of the investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần with 3 bidding package.
06/06/2023 09:31
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án đầu tư xây dựng huyện Xín Mần has posted 28 of the contractor selection plan, which contains 85 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần has posted 9 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 9 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần is the owner of 28 contractor selection plan. In which, they self-invite 28 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần is an investor with 4 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Xín Mần is the investor of 19 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code