Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý as follows:
- Has relationships with 0 contractor.
- Announced 2 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 8 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 6 packages that have not fully posted the contractor selection results. Of these 5 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 300,783,090 VND, of which the total winning bid value is: 300,779,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 300,783,090 VND, in which the total winning value is: 300,779,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 2 investment and development projects.
- As the owner of 3 Contractor selection plan in which 3 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 4 bidding packages in which 0 packages are self-invited, and 4 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý has posted the request Customer selects contractor for package No. 03 and 04 works: Waste water collection and drainage system after treatment of Military Medical Center
Phu Quy district folk medicine of the investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý with 2 bidding package.
23/06/2023 13:07
Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý Posted Development Investment Project Wastewater collection and drainage system after treatment of the Military Medical Center of Phu Quy District.
23/06/2023 12:12
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý has posted the results of the bidding package Package 02: Topographic survey supervision consultancy of the investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý.
24/05/2023 08:26
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý has posted the request Plan to select contractor for package No. 01, No. 02 and No. 03 for the works of upgrading sidewalks in front of the Culture - Information - Sports Center of the investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý with 3 bidding package.
22/05/2023 14:57
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý has posted the results of the bidding package Package No. 04: Consulting on setting up Bid Documents and evaluating Bid Package No. 03 of the investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý.
18/05/2023 08:25
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý has posted the request Upgrading and expanding the cafeteria area of Tam Thanh Primary School (My Khe site) of the investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý with 3 bidding package.
15/05/2023 07:40
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý has posted the results of the bidding package Package 05: Construction supervision consultancy package No. 03 of the investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý.
11/05/2023 14:01
Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý Posted Development Investment Project Upgrading and expanding the cafeteria area of Tam Thanh Primary School (My Khe site).
05/05/2023 15:15
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý has posted the results of the bidding package Package 03: Consultancy and verification of construction drawing design, cost estimate of the investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý.
05/05/2023 14:17
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý has posted the results of the bidding package Package 03: Consultancy and verification of construction drawing design, cost estimate of the investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý.
05/05/2023 14:15
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý publishes the plan Customer selects contractor for package No. 03 and 04 works: Waste water collection and drainage system after treatment of Military Medical Center
Phu Quy district folk medicine with 2 bidding package .
23/06/2023 13:07
Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý announced the results of the bid package Package 02: Topographic survey supervision consultancy .
- Winning bidder:
24/05/2023 08:26
Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý publishes the plan Plan to select contractor for package No. 01, No. 02 and No. 03 for the works of upgrading sidewalks in front of the Culture - Information - Sports Center with 3 bidding package .
22/05/2023 14:57
Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý announced the results of the bid package Package No. 04: Consulting on setting up Bid Documents and evaluating Bid Package No. 03 .
- Winning bidder:
18/05/2023 08:25
Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý publishes the plan Upgrading and expanding the cafeteria area of Tam Thanh Primary School (My Khe site) with 3 bidding package .
15/05/2023 07:40
Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý announced the results of the bid package Package 05: Construction supervision consultancy package No. 03 .
- Winning bidder:
11/05/2023 14:01
Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý announced the results of the bid package Package 03: Consultancy and verification of construction drawing design, cost estimate .
- Winning bidder:
05/05/2023 14:17
Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý announced the results of the bid package Package 03: Consultancy and verification of construction drawing design, cost estimate .
- Winning bidder:
05/05/2023 14:15
Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý announced the results of the bid package Package 02: Topographic survey supervision consultancy .
- Winning bidder:
18/04/2023 15:30
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý has posted the request Customer selects contractor for package No. 03 and 04 works: Waste water collection and drainage system after treatment of Military Medical Center
Phu Quy district folk medicine of the investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý with 2 bidding package.
23/06/2023 13:07
Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý Posted Development Investment Project Wastewater collection and drainage system after treatment of the Military Medical Center of Phu Quy District.
23/06/2023 12:12
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý has posted the results of the bidding package Package 02: Topographic survey supervision consultancy of the investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý.
24/05/2023 08:26
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý has posted the request Plan to select contractor for package No. 01, No. 02 and No. 03 for the works of upgrading sidewalks in front of the Culture - Information - Sports Center of the investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý with 3 bidding package.
22/05/2023 14:57
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý has posted the results of the bidding package Package No. 04: Consulting on setting up Bid Documents and evaluating Bid Package No. 03 of the investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý.
18/05/2023 08:25
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý has posted the request Upgrading and expanding the cafeteria area of Tam Thanh Primary School (My Khe site) of the investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý with 3 bidding package.
15/05/2023 07:40
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý has posted the results of the bidding package Package 05: Construction supervision consultancy package No. 03 of the investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý.
11/05/2023 14:01
Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý Posted Development Investment Project Upgrading and expanding the cafeteria area of Tam Thanh Primary School (My Khe site).
05/05/2023 15:15
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý has posted the results of the bidding package Package 03: Consultancy and verification of construction drawing design, cost estimate of the investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý.
05/05/2023 14:17
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý has posted the results of the bidding package Package 03: Consultancy and verification of construction drawing design, cost estimate of the investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý.
05/05/2023 14:15
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý has posted 3 of the contractor selection plan, which contains 8 of the bidding package. See full list here
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: Investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý is the owner of 3 contractor selection plan. In which, they self-invite 3 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý is an investor with 4 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng huyện Phú Quý is the investor of 2 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code