Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà as follows:
- Has relationships with 0 contractor.
- Announced 4 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 5 contractor selection plans with a total of 32 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 3 packages with results that do not have tender notice or prequalification notice.
- There are 29 packages that have not fully posted the contractor selection results. Of these 23 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 338,317,000 VND, of which the total winning bid value is: 334,886,000 VND.
- The savings rate is: 1.01%.
Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 338,317,000 VND, in which the total winning value is: 334,886,000 VND.
- The savings rate is: 1.01%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 4 investment and development projects.
- As the owner of 5 Contractor selection plan in which 5 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 12 bidding packages in which 1 packages are self-invited, and 11 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà has posted the results of the bidding package Package No. 08: Placing piles for ground clearance of the investor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà.
19/06/2023 08:20
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà has posted the request Plan for selecting contractors for bidding packages of the project: Dredging and river embankment 223, Hung Ha district (phase 1) of the investor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà with 4 bidding package.
12/06/2023 10:02
Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà Posted Development Investment Project Dredging and embankment of river 223, Hung Ha district.
12/06/2023 09:09
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà has posted the results of the bidding package Package number 03:
Consultancy Prepare bidding documents and evaluate bids for survey and design consultancy bidding packages, deploy after basic design of the investor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà.
12/06/2023 08:40
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà has posted the request Plan to select contractors for some consulting bidding packages under the project: New residential area technical infrastructure (zone 1) Dan Chang 2,
Hung Ha town, Hung Ha district of the investor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà with 6 bidding package.
09/06/2023 08:13
Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà Posted Development Investment Project Technical infrastructure of new residential area (zone 1) Dan Chang 2, Hung Ha town, Hung Ha district.
08/06/2023 08:08
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà has posted the request The plan to select contractors for a number of bidding packages under the project of dredging the river on axis B, the section from Thanh Lang intersection, Minh Hoa commune to Chanh bridge, Chi Hoa commune of the investor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà with 4 bidding package.
06/06/2023 08:16
Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà Posted Development Investment Project Dredging the B axis river, the section from Thanh Lang intersection, Minh Hoa commune to Chanh bridge, Chi Hoa commune.
06/06/2023 08:08
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà has posted the results of the bidding package Bidding package No. 05: Consulting for making bidding documents and evaluating bids for construction bidding packages and Construction supervision consultancy of the investor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà.
06/06/2023 07:47
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà has posted the request The plan to select contractors for a number of bidding packages under the project of Road connecting from Truong Vi Sy revolutionary historical site to the cultural and historical relic of Dieu Dung Princess Temple, Chi Hoa commune, Hung Ha district, stage 3. of the investor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà with 12 bidding package.
05/06/2023 15:12
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà announced the results of the bid package Package No. 08: Placing piles for ground clearance .
- Winning bidder:
19/06/2023 08:20
Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà publishes the plan Plan for selecting contractors for bidding packages of the project: Dredging and river embankment 223, Hung Ha district (phase 1) with 4 bidding package .
12/06/2023 10:02
Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà announced the results of the bid package Package number 03:
Consultancy Prepare bidding documents and evaluate bids for survey and design consultancy bidding packages, deploy after basic design .
- Winning bidder:
12/06/2023 08:40
Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà publishes the plan Plan to select contractors for some consulting bidding packages under the project: New residential area technical infrastructure (zone 1) Dan Chang 2,
Hung Ha town, Hung Ha district with 6 bidding package .
09/06/2023 08:13
Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà publishes the plan The plan to select contractors for a number of bidding packages under the project of dredging the river on axis B, the section from Thanh Lang intersection, Minh Hoa commune to Chanh bridge, Chi Hoa commune with 4 bidding package .
06/06/2023 08:16
Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà announced the results of the bid package Bidding package No. 05: Consulting for making bidding documents and evaluating bids for construction bidding packages and Construction supervision consultancy .
- Winning bidder:
06/06/2023 07:47
Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà publishes the plan The plan to select contractors for a number of bidding packages under the project of Road connecting from Truong Vi Sy revolutionary historical site to the cultural and historical relic of Dieu Dung Princess Temple, Chi Hoa commune, Hung Ha district, stage 3. with 12 bidding package .
05/06/2023 15:12
Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà publishes the plan The contractor selection plan for a number of consulting bidding packages under the project: Technical infrastructure of Nhan Cau 1 residential area, Hung Ha town,
Hung Ha district with 6 bidding package .
30/05/2023 10:30
Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà publishes Tender Notice Package 02: Construction and installation and static compression of piles in the form Open bidding .
26/05/2023 16:48
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà has posted the results of the bidding package Package No. 08: Placing piles for ground clearance of the investor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà.
19/06/2023 08:20
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà has posted the request Plan for selecting contractors for bidding packages of the project: Dredging and river embankment 223, Hung Ha district (phase 1) of the investor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà with 4 bidding package.
12/06/2023 10:02
Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà Posted Development Investment Project Dredging and embankment of river 223, Hung Ha district.
12/06/2023 09:09
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà has posted the results of the bidding package Package number 03:
Consultancy Prepare bidding documents and evaluate bids for survey and design consultancy bidding packages, deploy after basic design of the investor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà.
12/06/2023 08:40
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà has posted the request Plan to select contractors for some consulting bidding packages under the project: New residential area technical infrastructure (zone 1) Dan Chang 2,
Hung Ha town, Hung Ha district of the investor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà with 6 bidding package.
09/06/2023 08:13
Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà Posted Development Investment Project Technical infrastructure of new residential area (zone 1) Dan Chang 2, Hung Ha town, Hung Ha district.
08/06/2023 08:08
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà has posted the request The plan to select contractors for a number of bidding packages under the project of dredging the river on axis B, the section from Thanh Lang intersection, Minh Hoa commune to Chanh bridge, Chi Hoa commune of the investor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà with 4 bidding package.
06/06/2023 08:16
Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà Posted Development Investment Project Dredging the B axis river, the section from Thanh Lang intersection, Minh Hoa commune to Chanh bridge, Chi Hoa commune.
06/06/2023 08:08
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà has posted the results of the bidding package Bidding package No. 05: Consulting for making bidding documents and evaluating bids for construction bidding packages and Construction supervision consultancy of the investor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà.
06/06/2023 07:47
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà has posted the request The plan to select contractors for a number of bidding packages under the project of Road connecting from Truong Vi Sy revolutionary historical site to the cultural and historical relic of Dieu Dung Princess Temple, Chi Hoa commune, Hung Ha district, stage 3. of the investor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà with 12 bidding package.
05/06/2023 15:12
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà has posted 5 of the contractor selection plan, which contains 32 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà has posted 1 Tender Notice in the 1 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 3 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà is the investor of 12 package, of which 1 package is self-invited, other units invite bid 11 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà is the owner of 5 contractor selection plan. In which, they self-invite 5 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà is an investor with 2 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng huyện Hưng Hà is the investor of 4 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register