Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm as follows:
- Has relationships with 11 contractor.
- Announced 9 investment development project, of which 7 projects have not yet announced the prequalification documents.
- Announced 15 contractor selection plans with a total of 82 bidding packages, of which 8 prequalification documents have not found the investment project.
- Has invited bids for 30 packages (with 38 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 7 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 1 packages with results that do not have tender notice or prequalification notice.
- There are 80 packages that have not fully posted the contractor selection results. Of these 72 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 2.63%, Construction 57.89%, Consultancy 39.47%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 41,166,946,000 VND, of which the total winning bid value is: 38,044,593,000 VND.
- The savings rate is: 7.58%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm as follows:
- Has relationships with 11 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 2.63%, Construction 57.89%, Consulting 39.47%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 41,166,946,000 VND, in which the total winning value is: 38,044,593,000 VND.
- The savings rate is: 7.58%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 9 investment and development projects.
- As the owner of 15 Contractor selection plan in which 15 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 37 bidding packages in which 37 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm has posted the results of the bidding package Package No. 07: Moving electricity of the investor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm.
- Winning bidder: Công ty cổ phần tư vấn đầu tư xây dựng Thuận An Việt Nam
19/07/2023 16:28
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm has posted Tender Notice Package 20: Construction supervision consultancy and equipment procurement and installation, the supplementary package number 13, 14 of the investor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm with the form Open bidding.
15/07/2023 09:59
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm has posted Tender Notice Package 13: Construction work and procurement and installation of additional equipment of the investor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm with the form Open bidding.
15/07/2023 09:59
Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm Posted Development Investment Project to build Gia Lam district's cultural, information and sports center.
13/07/2023 10:10
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm has posted the results of the bidding package Package 13: Procurement and installation of equipment of the investor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm.
- Winning bidder: DONG NAM TRADING COMPANY LIMITED
07/07/2023 11:01
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm has posted Tender Notice Package 6: Design consultancy for BVTC and estimating the main house and auxiliary infrastructure, fire protection of the investor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm with the form Open bidding.
06/07/2023 15:43
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm has posted Tender Notice Tender package No 07: Moving electricity of the investor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm with the form Open bidding.
05/07/2023 14:36
Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm Posted Development Investment Project Building a route from road 179 to the land auction area in Trung Duong village, Kieu Ky commune, Gia Lam district.
05/07/2023 09:09
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm has posted the request To build Da Ton kindergarten in Ngoc Dong village, Da Ton commune, Gia Lam district of the investor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm with 11 bidding package.
30/06/2023 16:17
Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm Posted Development Investment Project To build Da Ton kindergarten in Ngoc Dong village, Da Ton commune, Gia Lam district.
30/06/2023 16:16
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm announced the results of the bid package Package No. 07: Moving electricity .
- Winning bidder: Công ty cổ phần tư vấn đầu tư xây dựng Thuận An Việt Nam
19/07/2023 16:28
Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm publishes Tender Notice Package 20: Construction supervision consultancy and equipment procurement and installation, the supplementary package number 13, 14 in the form Open bidding .
15/07/2023 09:59
Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm publishes Tender Notice Package 13: Construction work and procurement and installation of additional equipment in the form Open bidding .
15/07/2023 09:59
Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm announced the results of the bid package Package 13: Procurement and installation of equipment .
- Winning bidder: DONG NAM TRADING COMPANY LIMITED
07/07/2023 11:01
Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm publishes Tender Notice Package 6: Design consultancy for BVTC and estimating the main house and auxiliary infrastructure, fire protection in the form Open bidding .
06/07/2023 15:43
Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm publishes Tender Notice Tender package No 07: Moving electricity in the form Open bidding .
05/07/2023 14:36
Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm publishes the plan To build Da Ton kindergarten in Ngoc Dong village, Da Ton commune, Gia Lam district with 11 bidding package .
30/06/2023 16:17
Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm publishes the plan Construction of the planned route from Ỷ Lan road, Duong Xa commune across Thien Duc river to the end of De Tru 7 village, Duong Quang commune, Gia Lam district with 5 bidding package .
29/06/2023 10:41
Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm publishes Tender Notice Tender package No 08: Consulting on setting up construction drawing design and cost estimate of main works, auxiliary infrastructure; Fire protection and substations in the form Open bidding .
28/06/2023 16:09
Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm publishes the plan Construction of Van Duc primary school, Gia Lam district with 5 bidding package .
26/06/2023 16:43
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm has posted the results of the bidding package Package No. 07: Moving electricity of the investor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm.
- Winning bidder: Công ty cổ phần tư vấn đầu tư xây dựng Thuận An Việt Nam
19/07/2023 16:28
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm has posted Tender Notice Package 20: Construction supervision consultancy and equipment procurement and installation, the supplementary package number 13, 14 of the investor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm with the form Open bidding.
15/07/2023 09:59
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm has posted Tender Notice Package 13: Construction work and procurement and installation of additional equipment of the investor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm with the form Open bidding.
15/07/2023 09:59
Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm Posted Development Investment Project to build Gia Lam district's cultural, information and sports center.
13/07/2023 10:10
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm has posted the results of the bidding package Package 13: Procurement and installation of equipment of the investor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm.
- Winning bidder: DONG NAM TRADING COMPANY LIMITED
07/07/2023 11:01
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm has posted Tender Notice Package 6: Design consultancy for BVTC and estimating the main house and auxiliary infrastructure, fire protection of the investor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm with the form Open bidding.
06/07/2023 15:43
Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm has posted Tender Notice Tender package No 07: Moving electricity of the investor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm with the form Open bidding.
05/07/2023 14:36
Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm Posted Development Investment Project Building a route from road 179 to the land auction area in Trung Duong village, Kieu Ky commune, Gia Lam district.
05/07/2023 09:09
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm has posted the request To build Da Ton kindergarten in Ngoc Dong village, Da Ton commune, Gia Lam district of the investor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm with 11 bidding package.
30/06/2023 16:17
Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm Posted Development Investment Project To build Da Ton kindergarten in Ngoc Dong village, Da Ton commune, Gia Lam district.
30/06/2023 16:16
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm has posted 15 of the contractor selection plan, which contains 82 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm has posted 38 Tender Notice in the 30 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm has posted 7 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 7 package, canceled the bid 0 package (among the bidding packages above).
- There are 1 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm has a relationship with 11 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm is the investor of 37 package, of which 37 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm is the owner of 15 contractor selection plan. In which, they self-invite 15 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm is an investor with 11 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng huyện Gia Lâm is the investor of 9 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code