Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án 5 as follows:
- Has relationships with 7 contractor.
- Announced 2 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 7 contractor selection plans with a total of 6 bidding packages, of which 7 prequalification documents have not found the investment project.
- Has invited bids for 15 packages (with 20 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 4 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 1 packages with results that do not have tender notice or prequalification notice.
- There are 6 packages that have not fully posted the contractor selection results. Of these 6 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.50 contractors.
- Breakdown by bidding field: Goods 0%, Construction 60.00%, Consultancy 40.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 18,773,602,000 VND, of which the total winning bid value is: 18,596,712,000 VND.
- The savings rate is: 0.94%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án 5 as follows:
- Has relationships with 7 contractor.
- The average number of contractors participating in each bidding package is: 1.50 contractors.
- Proportion of bidding fields: Goods 0%, Construction 60.00%, Consulting 40.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 18,773,602,000 VND, in which the total winning value is: 18,596,712,000 VND.
- The savings rate is: 0.94%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 2 investment and development projects.
- As the owner of 7 Contractor selection plan in which 7 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 0 bidding packages in which 0 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý dự án 5 has posted the request Supplementing the project contractor selection plan: Waterproofing treatment of roof, septum, outer wall; replace new corrugated iron roof, replace damaged windows; Newly painted exterior walls, corridors, offices of the office of the Project Management Board5 of the investor Ban Quản lý dự án 5 with 2 bidding package.
03/07/2023 09:59
The Bid solicitor Ban Quản lý dự án 5 has posted the request Supplementing the project contractor selection plan: Waterproofing treatment of roof, septum, outer wall; replace new corrugated iron roof, replace damaged windows; Newly painted exterior walls, corridors, offices of the office of the Project Management Board5 of the investor Ban Quản lý dự án 5 with 2 bidding package.
03/07/2023 09:49
The Bid solicitor Ban Quản lý dự án 5 has posted the request Supplementing the project contractor selection plan: Waterproofing treatment of roof, septum, outer wall; replace new corrugated iron roof, replace damaged windows; Newly painted exterior walls, corridors, offices of the office of the Project Management Board5 of the investor Ban Quản lý dự án 5 with 2 bidding package.
30/06/2023 08:30
The Bid solicitor Ban Quản lý dự án 5 has posted the request Supplementing the project contractor selection plan: Waterproofing treatment of roof, septum, outer wall; replace new corrugated iron roof, replace damaged windows; Newly painted exterior walls, corridors, offices of the office of the Project Management Board5 of the investor Ban Quản lý dự án 5 with 2 bidding package.
29/06/2023 16:07
The Bid solicitor Ban Quản lý dự án 5 has posted the request Supplementing the project contractor selection plan: Waterproofing treatment of roof, septum, outer wall; replace new corrugated iron roof, replace damaged windows; Newly painted exterior walls, corridors, offices of the office of the Project Management Board5 of the investor Ban Quản lý dự án 5 with 2 bidding package.
29/06/2023 16:00
The Bid solicitor Ban Quản lý dự án 5 has posted the results of the bidding package Package 4: Construction supervision consultancy of the investor Ban Quản lý dự án 5.
- Winning bidder: CÔNG TY CP TƯ VẤN THIẾT KẾ GIAO THÔNG VẬN TẢI 4
23/06/2023 09:21
The Bid solicitor Ban Quản lý dự án 5 has posted the request Contractor selection plan for the preparation of the feasibility study report, Works: Repairing the road surface section Km1275+00 - Km1275+220, Km1275+400 - Km1276+100, Km1281+500 - Km1281+594, Km1283+350 - Km1284+00 National Highway 1, Phu Yen province of the investor Ban Quản lý dự án 5 with 1 bidding package.
20/06/2023 18:46
The Bid solicitor Ban Quản lý dự án 5 has posted the request Contractor selection plan for preparation of Feasibility Study Report for Construction Investment, Works: Repairing the road surface section Km1265+00-Km1265+500; Km1266 - Km1266+500; Km1267 - Km1267+500; National Highway 1, Phu Yen province of the investor Ban Quản lý dự án 5 with 1 bidding package.
20/06/2023 18:40
Ban Quản lý dự án 5 Posted Development Investment Project Repairing the road surface section Km1265+00-Km1265+500; Km1266 - Km1266+500; Km1267 - Km1267+500; National Highway 1, Phu Yen province.
20/06/2023 18:18
Ban Quản lý dự án 5 Posted Development Investment Project Repairing road surface sections Km1275+00 - Km1275+220, Km1275+400 - Km1276+100, Km1281+500 - Km1281+594, Km1283+350 - Km1284+00 National Highway 1, Phu Yen province.
20/06/2023 18:18
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án 5 publishes the plan Supplementing the project contractor selection plan: Waterproofing treatment of roof, septum, outer wall; replace new corrugated iron roof, replace damaged windows; Newly painted exterior walls, corridors, offices of the office of the Project Management Board5 with 2 bidding package .
03/07/2023 09:59
Ban Quản lý dự án 5 publishes the plan Supplementing the project contractor selection plan: Waterproofing treatment of roof, septum, outer wall; replace new corrugated iron roof, replace damaged windows; Newly painted exterior walls, corridors, offices of the office of the Project Management Board5 with 2 bidding package .
03/07/2023 09:49
Ban Quản lý dự án 5 publishes the plan Supplementing the project contractor selection plan: Waterproofing treatment of roof, septum, outer wall; replace new corrugated iron roof, replace damaged windows; Newly painted exterior walls, corridors, offices of the office of the Project Management Board5 with 2 bidding package .
30/06/2023 08:30
Ban Quản lý dự án 5 publishes the plan Supplementing the project contractor selection plan: Waterproofing treatment of roof, septum, outer wall; replace new corrugated iron roof, replace damaged windows; Newly painted exterior walls, corridors, offices of the office of the Project Management Board5 with 2 bidding package .
29/06/2023 16:07
Ban Quản lý dự án 5 publishes the plan Supplementing the project contractor selection plan: Waterproofing treatment of roof, septum, outer wall; replace new corrugated iron roof, replace damaged windows; Newly painted exterior walls, corridors, offices of the office of the Project Management Board5 with 2 bidding package .
29/06/2023 16:00
Ban Quản lý dự án 5 announced the results of the bid package Package 4: Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ DỊCH VỤ AN THỊNH, CÔNG TY CP TƯ VẤN THIẾT KẾ GIAO THÔNG VẬN TẢI 4
23/06/2023 09:21
Ban Quản lý dự án 5 publishes the plan Contractor selection plan for the preparation of the feasibility study report, Works: Repairing the road surface section Km1275+00 - Km1275+220, Km1275+400 - Km1276+100, Km1281+500 - Km1281+594, Km1283+350 - Km1284+00 National Highway 1, Phu Yen province with 1 bidding package .
20/06/2023 18:46
Ban Quản lý dự án 5 publishes the plan Contractor selection plan for preparation of Feasibility Study Report for Construction Investment, Works: Repairing the road surface section Km1265+00-Km1265+500; Km1266 - Km1266+500; Km1267 - Km1267+500; National Highway 1, Phu Yen province with 1 bidding package .
20/06/2023 18:40
Ban Quản lý dự án 5 announced the results of the bid package Package 4: Construction supervision consultancy .
- Winning bidder: CÔNG TY CP TƯ VẤN XÂY DỰNG CÔNG TRÌNH TRƯỜNG THÀNH
09/06/2023 14:33
Ban Quản lý dự án 5 announced the results of the bid package Package 03: Construction supervision consultancy .
- Winning bidder:
23/05/2023 22:12
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý dự án 5 has posted the request Supplementing the project contractor selection plan: Waterproofing treatment of roof, septum, outer wall; replace new corrugated iron roof, replace damaged windows; Newly painted exterior walls, corridors, offices of the office of the Project Management Board5 of the investor Ban Quản lý dự án 5 with 2 bidding package.
03/07/2023 09:59
The Bid solicitor Ban Quản lý dự án 5 has posted the request Supplementing the project contractor selection plan: Waterproofing treatment of roof, septum, outer wall; replace new corrugated iron roof, replace damaged windows; Newly painted exterior walls, corridors, offices of the office of the Project Management Board5 of the investor Ban Quản lý dự án 5 with 2 bidding package.
03/07/2023 09:49
The Bid solicitor Ban Quản lý dự án 5 has posted the request Supplementing the project contractor selection plan: Waterproofing treatment of roof, septum, outer wall; replace new corrugated iron roof, replace damaged windows; Newly painted exterior walls, corridors, offices of the office of the Project Management Board5 of the investor Ban Quản lý dự án 5 with 2 bidding package.
30/06/2023 08:30
The Bid solicitor Ban Quản lý dự án 5 has posted the request Supplementing the project contractor selection plan: Waterproofing treatment of roof, septum, outer wall; replace new corrugated iron roof, replace damaged windows; Newly painted exterior walls, corridors, offices of the office of the Project Management Board5 of the investor Ban Quản lý dự án 5 with 2 bidding package.
29/06/2023 16:07
The Bid solicitor Ban Quản lý dự án 5 has posted the request Supplementing the project contractor selection plan: Waterproofing treatment of roof, septum, outer wall; replace new corrugated iron roof, replace damaged windows; Newly painted exterior walls, corridors, offices of the office of the Project Management Board5 of the investor Ban Quản lý dự án 5 with 2 bidding package.
29/06/2023 16:00
The Bid solicitor Ban Quản lý dự án 5 has posted the results of the bidding package Package 4: Construction supervision consultancy of the investor Ban Quản lý dự án 5.
- Winning bidder: CÔNG TY CP TƯ VẤN THIẾT KẾ GIAO THÔNG VẬN TẢI 4
23/06/2023 09:21
The Bid solicitor Ban Quản lý dự án 5 has posted the request Contractor selection plan for the preparation of the feasibility study report, Works: Repairing the road surface section Km1275+00 - Km1275+220, Km1275+400 - Km1276+100, Km1281+500 - Km1281+594, Km1283+350 - Km1284+00 National Highway 1, Phu Yen province of the investor Ban Quản lý dự án 5 with 1 bidding package.
20/06/2023 18:46
The Bid solicitor Ban Quản lý dự án 5 has posted the request Contractor selection plan for preparation of Feasibility Study Report for Construction Investment, Works: Repairing the road surface section Km1265+00-Km1265+500; Km1266 - Km1266+500; Km1267 - Km1267+500; National Highway 1, Phu Yen province of the investor Ban Quản lý dự án 5 with 1 bidding package.
20/06/2023 18:40
Ban Quản lý dự án 5 Posted Development Investment Project Repairing the road surface section Km1265+00-Km1265+500; Km1266 - Km1266+500; Km1267 - Km1267+500; National Highway 1, Phu Yen province.
20/06/2023 18:18
Ban Quản lý dự án 5 Posted Development Investment Project Repairing road surface sections Km1275+00 - Km1275+220, Km1275+400 - Km1276+100, Km1281+500 - Km1281+594, Km1283+350 - Km1284+00 National Highway 1, Phu Yen province.
20/06/2023 18:18
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án 5 has posted 7 of the contractor selection plan, which contains 6 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án 5 has posted 20 Tender Notice in the 15 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án 5 has posted 4 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 4 package, canceled the bid 0 package (among the bidding packages above).
- There are 1 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án 5 has a relationship with 7 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án 5 has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án 5 is the owner of 7 contractor selection plan. In which, they self-invite 7 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban Quản lý dự án 5 is the investor of 2 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register