Data analysis results of DauThau.info software for bid solicitors Ban Quản lý bảo trì đường bộ tỉnh Yên Bái as follows:
- Has relationships with 8 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 1 contractor selection plans with a total of 4 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 15 packages (with 15 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 12 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 6 packages with results that do not have tender notice or prequalification notice.
- There are 4 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 6.67%, Construction 66.67%, Consultancy 26.67%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 79,707,412,092 VND, of which the total winning bid value is: 76,432,896,000 VND.
- The savings rate is: 4.11%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý bảo trì đường bộ tỉnh Yên Bái as follows:
- Has relationships with 8 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 6.67%, Construction 66.67%, Consulting 26.67%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 79,707,412,092 VND, in which the total winning value is: 76,432,896,000 VND.
- The savings rate is: 4.11%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 1 Contractor selection plan in which 1 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 1 bidding packages in which 1 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted Tender Notice Construction and repair works, construction of Nhuoc Ly bridge, Km68+940, Yen Bai - Khe Sang street (tel.163) of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái with the form Open bidding.
26/06/2023 18:08
Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted Tender Notice Construction and repair of drainage works at Km20+625, Khanh Hoa - Minh Xuan street (DT.171), Yen Bai province of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái with the form Open bidding.
16/06/2023 08:05
The Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted the results of the bidding package Package 04: Construction and repair of damaged foundation, road surface, drainage system and traffic safety system section: Km10+500 - Km11+200; Km20+900 - Km21+450; Km22+650 - Km23+500; Km24+870 - Km25+230; Km40+200 - Km40+500; Km40+830 - Km41+250; Km43+980 - Km44+200; Km44+450 - Km44+670; Km44+850 - Km45+250, Yen Bai - Khe Sang street (tel.163), Yen Bai province of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái.
- Winning bidder: CÔNG TY CỔ PHẦN TẬP ĐOÀN XÂY DỰNG BÌNH PHÁT
09/06/2023 15:54
The Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted the request Repair and construction of Nhuoc Ly bridge, Km68+940, Yen Bai - Khe Sang street (tel.163) of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái with 4 bidding package.
05/06/2023 15:01
The Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted the results of the bidding package Package No. 05: Construction supervision and repair of damaged foundation, road surface, drainage system and traffic safety system section: Km10+500 - Km11+200; Km20+900 - Km21+450; Km22+650 - Km23+500; Km24+870 - Km25+230; Km40+200 - Km40+500; Km40+830 - Km41+250; Km43+980 - Km44+200; Km44+450 - Km44+670; Km44+850 - Km45+250, Yen Bai - Khe Sang street (tel.163), Yen Bai province of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái.
05/06/2023 08:08
The Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted the results of the bidding package Survey consultant, prepare economic - technical report Repairing partial damage to foundation, road surface, drainage system and traffic safety system section Km243+600 – Km245+400, National Highway 37, province Yen Bai of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái.
04/06/2023 20:39
The Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted the results of the bidding package Package 02: Consulting survey, making design documents, construction drawings, construction cost estimate Repair damage to foundation, road surface, drainage system and traffic safety system section: Km10+ 500 - Km11+200; Km20+900 - Km21+450; Km22+650 - Km23+500; Km24+870 - Km25+230; Km40+200 - Km40+500; Km40+830 - Km41+250; Km43+980 - Km44+200; Km44+450 - Km44+670; Km44+850 - Km45+250, Yen Bai - Khe Sang street (tel.163), Yen Bai province of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái.
04/06/2023 19:01
The Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted the results of the bidding package Survey consultant to prepare feasibility study report of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái.
03/06/2023 15:19
The Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted the results of the bidding package Civil Works of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNG LIÊN BÌNH
31/05/2023 05:46
Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted Tender Notice Purchase, return, and return 2,000 advance steel gabions to overcome the consequences of rainstorms on local roads in 2018 of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái with the form Open bidding.
30/05/2023 20:05
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý bảo trì đường bộ tỉnh Yên Bái publishes Tender Notice Construction and repair works, construction of Nhuoc Ly bridge, Km68+940, Yen Bai - Khe Sang street (tel.163) in the form Open bidding .
26/06/2023 18:08
Ban Quản lý bảo trì đường bộ tỉnh Yên Bái publishes Tender Notice Construction and repair of drainage works at Km20+625, Khanh Hoa - Minh Xuan street (DT.171), Yen Bai province in the form Open bidding .
16/06/2023 08:05
Ban Quản lý bảo trì đường bộ tỉnh Yên Bái announced the results of the bid package Package 04: Construction and repair of damaged foundation, road surface, drainage system and traffic safety system section: Km10+500 - Km11+200; Km20+900 - Km21+450; Km22+650 - Km23+500; Km24+870 - Km25+230; Km40+200 - Km40+500; Km40+830 - Km41+250; Km43+980 - Km44+200; Km44+450 - Km44+670; Km44+850 - Km45+250, Yen Bai - Khe Sang street (tel.163), Yen Bai province .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG THỊNH HƯNG YÊN BÁI, CÔNG TY CỔ PHẦN TẬP ĐOÀN XÂY DỰNG BÌNH PHÁT
09/06/2023 15:54
Ban Quản lý bảo trì đường bộ tỉnh Yên Bái publishes the plan Repair and construction of Nhuoc Ly bridge, Km68+940, Yen Bai - Khe Sang street (tel.163) with 4 bidding package .
05/06/2023 15:01
Ban Quản lý bảo trì đường bộ tỉnh Yên Bái announced the results of the bid package Package No. 05: Construction supervision and repair of damaged foundation, road surface, drainage system and traffic safety system section: Km10+500 - Km11+200; Km20+900 - Km21+450; Km22+650 - Km23+500; Km24+870 - Km25+230; Km40+200 - Km40+500; Km40+830 - Km41+250; Km43+980 - Km44+200; Km44+450 - Km44+670; Km44+850 - Km45+250, Yen Bai - Khe Sang street (tel.163), Yen Bai province .
- Winning bidder:
05/06/2023 08:08
Ban Quản lý bảo trì đường bộ tỉnh Yên Bái announced the results of the bid package Survey consultant, prepare economic - technical report Repairing partial damage to foundation, road surface, drainage system and traffic safety system section Km243+600 – Km245+400, National Highway 37, province Yen Bai .
- Winning bidder:
04/06/2023 20:39
Ban Quản lý bảo trì đường bộ tỉnh Yên Bái announced the results of the bid package Package 02: Consulting survey, making design documents, construction drawings, construction cost estimate Repair damage to foundation, road surface, drainage system and traffic safety system section: Km10+ 500 - Km11+200; Km20+900 - Km21+450; Km22+650 - Km23+500; Km24+870 - Km25+230; Km40+200 - Km40+500; Km40+830 - Km41+250; Km43+980 - Km44+200; Km44+450 - Km44+670; Km44+850 - Km45+250, Yen Bai - Khe Sang street (tel.163), Yen Bai province .
- Winning bidder:
04/06/2023 19:01
Ban Quản lý bảo trì đường bộ tỉnh Yên Bái announced the results of the bid package Survey consultant to prepare feasibility study report .
- Winning bidder:
03/06/2023 15:19
Ban Quản lý bảo trì đường bộ tỉnh Yên Bái announced the results of the bid package Civil Works .
- Winning bidder: TRUONG AN VINH PHUC CONSTRUCTIONS COMPANY LIMITED, CÔNG TY TNHH ANH NAM XUÂN THỦY, CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNG LIÊN BÌNH
31/05/2023 05:46
Ban Quản lý bảo trì đường bộ tỉnh Yên Bái publishes Tender Notice Purchase, return, and return 2,000 advance steel gabions to overcome the consequences of rainstorms on local roads in 2018 in the form Open bidding .
30/05/2023 20:05
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted Tender Notice Construction and repair works, construction of Nhuoc Ly bridge, Km68+940, Yen Bai - Khe Sang street (tel.163) of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái with the form Open bidding.
26/06/2023 18:08
Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted Tender Notice Construction and repair of drainage works at Km20+625, Khanh Hoa - Minh Xuan street (DT.171), Yen Bai province of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái with the form Open bidding.
16/06/2023 08:05
The Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted the results of the bidding package Package 04: Construction and repair of damaged foundation, road surface, drainage system and traffic safety system section: Km10+500 - Km11+200; Km20+900 - Km21+450; Km22+650 - Km23+500; Km24+870 - Km25+230; Km40+200 - Km40+500; Km40+830 - Km41+250; Km43+980 - Km44+200; Km44+450 - Km44+670; Km44+850 - Km45+250, Yen Bai - Khe Sang street (tel.163), Yen Bai province of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái.
- Winning bidder: CÔNG TY CỔ PHẦN TẬP ĐOÀN XÂY DỰNG BÌNH PHÁT
09/06/2023 15:54
The Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted the request Repair and construction of Nhuoc Ly bridge, Km68+940, Yen Bai - Khe Sang street (tel.163) of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái with 4 bidding package.
05/06/2023 15:01
The Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted the results of the bidding package Package No. 05: Construction supervision and repair of damaged foundation, road surface, drainage system and traffic safety system section: Km10+500 - Km11+200; Km20+900 - Km21+450; Km22+650 - Km23+500; Km24+870 - Km25+230; Km40+200 - Km40+500; Km40+830 - Km41+250; Km43+980 - Km44+200; Km44+450 - Km44+670; Km44+850 - Km45+250, Yen Bai - Khe Sang street (tel.163), Yen Bai province of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái.
05/06/2023 08:08
The Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted the results of the bidding package Survey consultant, prepare economic - technical report Repairing partial damage to foundation, road surface, drainage system and traffic safety system section Km243+600 – Km245+400, National Highway 37, province Yen Bai of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái.
04/06/2023 20:39
The Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted the results of the bidding package Package 02: Consulting survey, making design documents, construction drawings, construction cost estimate Repair damage to foundation, road surface, drainage system and traffic safety system section: Km10+ 500 - Km11+200; Km20+900 - Km21+450; Km22+650 - Km23+500; Km24+870 - Km25+230; Km40+200 - Km40+500; Km40+830 - Km41+250; Km43+980 - Km44+200; Km44+450 - Km44+670; Km44+850 - Km45+250, Yen Bai - Khe Sang street (tel.163), Yen Bai province of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái.
04/06/2023 19:01
The Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted the results of the bidding package Survey consultant to prepare feasibility study report of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái.
03/06/2023 15:19
The Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted the results of the bidding package Civil Works of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNG LIÊN BÌNH
31/05/2023 05:46
Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted Tender Notice Purchase, return, and return 2,000 advance steel gabions to overcome the consequences of rainstorms on local roads in 2018 of the investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái with the form Open bidding.
30/05/2023 20:05
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted 1 of the contractor selection plan, which contains 4 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted 15 Tender Notice in the 15 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has posted 12 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 12 package, canceled the bid 0 package (among the bidding packages above).
- There are 6 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has a relationship with 8 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái is the investor of 1 package, of which 1 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý bảo trì đường bộ tỉnh Yên Bái is the owner of 1 contractor selection plan. In which, they self-invite 1 of contractor selection plan, other units invite bids of 0 of contractor selection plan.