Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý bảo trì đường bộ as follows:
- Has relationships with 9 contractor.
- Announced 10 investment development project, of which 9 projects have not yet announced the prequalification documents.
- Announced 12 contractor selection plans with a total of 40 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 33 packages (with 34 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 12 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 39 packages that have not fully posted the contractor selection results. Of these 38 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 2.94%, Construction 73.53%, Consultancy 20.59%, Non-consultancy 2.94%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 56,000,427,242 VND, of which the total winning bid value is: 54,848,797,527 VND.
- The savings rate is: 2.06%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý bảo trì đường bộ as follows:
- Has relationships with 9 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 2.94%, Construction 73.53%, Consulting 20.59%, Non-consulting 2.94%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 56,000,427,242 VND, in which the total winning value is: 54,848,797,527 VND.
- The savings rate is: 2.06%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 10 investment and development projects.
- As the owner of 12 Contractor selection plan in which 12 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 20 bidding packages in which 20 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Ban Quản lý bảo trì đường bộ Posted Development Investment Project Handling locations with traffic safety risk Km169+350-Km169+650, Km172+250-Km172+400, Km172+600-Km173, Km173+300-Km173+500, Km174+500-Km174+900 , Km175+00, Km175+350-Km175+600, Km175+900, m176+300-Km176+900, National Highway 34, Cao Bang province.
11/07/2023 11:11
The Bid solicitor Ban Quản lý bảo trì đường bộ has posted the results of the bidding package Construction supervision consultancy of the investor Ban Quản lý bảo trì đường bộ.
08/07/2023 09:54
Bid solicitor Ban Quản lý bảo trì đường bộ has posted Tender Notice Civil Works of the investor Ban Quản lý bảo trì đường bộ with the form Open bidding.
30/06/2023 08:44
The Bid solicitor Ban Quản lý bảo trì đường bộ has posted the results of the bidding package Civil Works of the investor Ban Quản lý bảo trì đường bộ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TỔNG HỢP NAM SƠN
29/06/2023 15:08
The Bid solicitor Ban Quản lý bảo trì đường bộ has posted the results of the bidding package Package No. 01: Repair works of the investor Ban Quản lý bảo trì đường bộ.
- Winning bidder: CÔNG TY TNHH ÁNH TRANG SƠN LA
29/06/2023 11:11
The Bid solicitor Ban Quản lý bảo trì đường bộ has posted the request Construction contractor selection plan: Repair of partial damage to the foundation, road surface and works
Km18+00-Km22+300, Tel.216 of the investor Ban Quản lý bảo trì đường bộ with 4 bidding package.
27/06/2023 09:11
The Bid solicitor Ban Quản lý bảo trì đường bộ has posted the request Approval of the contractor selection plan for the project: Repair of partial damage to the foundation, road surface and works Km9+500-Km13+500, Tel.216 of the investor Ban Quản lý bảo trì đường bộ with 4 bidding package.
27/06/2023 09:08
The Bid solicitor Ban Quản lý bảo trì đường bộ has posted the request Contractor selection plan Repair of partial damage to foundation, road surface and works section Km17 - Km18+500, Km19+750 - Km20+100, Km21+500 - Km21+830, Tel.206 of the investor Ban Quản lý bảo trì đường bộ with 4 bidding package.
27/06/2023 09:05
The Bid solicitor Ban Quản lý bảo trì đường bộ has posted the request Approval of contractor selection plan Works: Repair of partial damage to foundation, road surface and works section Km2+700-Km6+500, Tel.206 of the investor Ban Quản lý bảo trì đường bộ with 4 bidding package.
27/06/2023 09:03
The Bid solicitor Ban Quản lý bảo trì đường bộ has posted the request Decision approving the plan for selection of construction contractors: Repairing of partial damage to road surface and works section Km15+300-Km18+00 (Kau Mon pass), repairing Km2-Km8 drainage system, repairing repair traffic safety system Km0-Km15, Tel.207 of the investor Ban Quản lý bảo trì đường bộ with 4 bidding package.
27/06/2023 09:01
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý bảo trì đường bộ announced the results of the bid package Construction supervision consultancy .
- Winning bidder:
08/07/2023 09:54
Ban Quản lý bảo trì đường bộ publishes Tender Notice Civil Works in the form Open bidding .
30/06/2023 08:44
Ban Quản lý bảo trì đường bộ announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TỔNG HỢP NAM SƠN
29/06/2023 15:08
Ban Quản lý bảo trì đường bộ announced the results of the bid package Package No. 01: Repair works .
- Winning bidder: CÔNG TY TNHH ÁNH TRANG SƠN LA
29/06/2023 11:11
Ban Quản lý bảo trì đường bộ publishes the plan Construction contractor selection plan: Repair of partial damage to the foundation, road surface and works
Km18+00-Km22+300, Tel.216 with 4 bidding package .
27/06/2023 09:11
Ban Quản lý bảo trì đường bộ publishes the plan Approval of the contractor selection plan for the project: Repair of partial damage to the foundation, road surface and works Km9+500-Km13+500, Tel.216 with 4 bidding package .
27/06/2023 09:08
Ban Quản lý bảo trì đường bộ publishes the plan Contractor selection plan Repair of partial damage to foundation, road surface and works section Km17 - Km18+500, Km19+750 - Km20+100, Km21+500 - Km21+830, Tel.206 with 4 bidding package .
27/06/2023 09:05
Ban Quản lý bảo trì đường bộ publishes the plan Approval of contractor selection plan Works: Repair of partial damage to foundation, road surface and works section Km2+700-Km6+500, Tel.206 with 4 bidding package .
27/06/2023 09:03
Ban Quản lý bảo trì đường bộ publishes the plan Decision approving the plan for selection of construction contractors: Repairing of partial damage to road surface and works section Km15+300-Km18+00 (Kau Mon pass), repairing Km2-Km8 drainage system, repairing repair traffic safety system Km0-Km15, Tel.207 with 4 bidding package .
27/06/2023 09:01
Ban Quản lý bảo trì đường bộ publishes the plan Approving the project contractor selection plan: Unexpected repair of the intersection at the traffic island at the intersection of Bang Giang bridge and Na Can bridgehead with 3 bidding package .
26/06/2023 18:08
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý bảo trì đường bộ Posted Development Investment Project Handling locations with traffic safety risk Km169+350-Km169+650, Km172+250-Km172+400, Km172+600-Km173, Km173+300-Km173+500, Km174+500-Km174+900 , Km175+00, Km175+350-Km175+600, Km175+900, m176+300-Km176+900, National Highway 34, Cao Bang province.
11/07/2023 11:11
The Bid solicitor Ban Quản lý bảo trì đường bộ has posted the results of the bidding package Construction supervision consultancy of the investor Ban Quản lý bảo trì đường bộ.
08/07/2023 09:54
Bid solicitor Ban Quản lý bảo trì đường bộ has posted Tender Notice Civil Works of the investor Ban Quản lý bảo trì đường bộ with the form Open bidding.
30/06/2023 08:44
The Bid solicitor Ban Quản lý bảo trì đường bộ has posted the results of the bidding package Civil Works of the investor Ban Quản lý bảo trì đường bộ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TỔNG HỢP NAM SƠN
29/06/2023 15:08
The Bid solicitor Ban Quản lý bảo trì đường bộ has posted the results of the bidding package Package No. 01: Repair works of the investor Ban Quản lý bảo trì đường bộ.
- Winning bidder: CÔNG TY TNHH ÁNH TRANG SƠN LA
29/06/2023 11:11
The Bid solicitor Ban Quản lý bảo trì đường bộ has posted the request Construction contractor selection plan: Repair of partial damage to the foundation, road surface and works
Km18+00-Km22+300, Tel.216 of the investor Ban Quản lý bảo trì đường bộ with 4 bidding package.
27/06/2023 09:11
The Bid solicitor Ban Quản lý bảo trì đường bộ has posted the request Approval of the contractor selection plan for the project: Repair of partial damage to the foundation, road surface and works Km9+500-Km13+500, Tel.216 of the investor Ban Quản lý bảo trì đường bộ with 4 bidding package.
27/06/2023 09:08
The Bid solicitor Ban Quản lý bảo trì đường bộ has posted the request Contractor selection plan Repair of partial damage to foundation, road surface and works section Km17 - Km18+500, Km19+750 - Km20+100, Km21+500 - Km21+830, Tel.206 of the investor Ban Quản lý bảo trì đường bộ with 4 bidding package.
27/06/2023 09:05
The Bid solicitor Ban Quản lý bảo trì đường bộ has posted the request Approval of contractor selection plan Works: Repair of partial damage to foundation, road surface and works section Km2+700-Km6+500, Tel.206 of the investor Ban Quản lý bảo trì đường bộ with 4 bidding package.
27/06/2023 09:03
The Bid solicitor Ban Quản lý bảo trì đường bộ has posted the request Decision approving the plan for selection of construction contractors: Repairing of partial damage to road surface and works section Km15+300-Km18+00 (Kau Mon pass), repairing Km2-Km8 drainage system, repairing repair traffic safety system Km0-Km15, Tel.207 of the investor Ban Quản lý bảo trì đường bộ with 4 bidding package.
27/06/2023 09:01
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý bảo trì đường bộ has posted 12 of the contractor selection plan, which contains 40 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý bảo trì đường bộ has posted 34 Tender Notice in the 33 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý bảo trì đường bộ has posted 12 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 12 package, canceled the bid 0 package (among the bidding packages above).
- There are 4 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý bảo trì đường bộ has a relationship with 9 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý bảo trì đường bộ has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý bảo trì đường bộ is the investor of 20 package, of which 20 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý bảo trì đường bộ is the owner of 12 contractor selection plan. In which, they self-invite 12 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban Quản lý bảo trì đường bộ is an investor with 5 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý bảo trì đường bộ is the investor of 10 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code