Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa as follows:
- Has relationships with 4 contractor.
- Announced 8 investment development project, of which 6 projects have not yet announced the prequalification documents.
- Announced 8 contractor selection plans with a total of 13 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 26 packages (with 29 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 5 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 13 packages that have not fully posted the contractor selection results. Of these 5 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 75.86%, Consultancy 24.14%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 38,025,390,000 VND, of which the total winning bid value is: 37,732,627,000 VND.
- The savings rate is: 0.77%.
Data analysis results of DauThau.info software for bid solicitors Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 75.86%, Consulting 24.14%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 38,025,390,000 VND, in which the total winning value is: 37,732,627,000 VND.
- The savings rate is: 0.77%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 8 investment and development projects.
- As the owner of 8 Contractor selection plan in which 8 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 29 bidding packages in which 29 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Bid solicitor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa has posted Tender Notice Tender package No 2: Construction of the investor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa with the form Competitive Offer.
04/07/2023 15:50
The Bid solicitor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa has posted the request Moving medium and low voltage power lines and transformer stations in service of site clearance for project implementation: Upgrading and expanding Thinh-Dong road, Hoang Hoa district (phase 2) of the investor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa with 1 bidding package.
22/06/2023 18:34
Bid solicitor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa has posted Tender Notice Package 02: Consulting survey, making project feasibility study report of the investor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa with the form Open bidding.
20/06/2023 21:17
The Bid solicitor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa has posted the request Road from Phuc Ngu canal to Giang Son village, Hoang Truong commune, Hoang Hoa district of the investor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa with 1 bidding package.
20/06/2023 17:52
Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa Posted Development Investment Project Road from Phuc Ngu canal to Giang Son village, Hoang Truong commune, Hoang Hoa district.
20/06/2023 17:17
Bid solicitor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa has posted Tender Notice Package 02:Construction + equipment of the investor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa with the form Open bidding.
15/06/2023 09:29
The Bid solicitor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa has posted the request Investment in construction of residential area 1 Hong Thai village, Hoang Dong commune (MBQH No. 58/MBQH-UBND dated July 15, 2020) Hoang Hoa district of the investor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa with 1 bidding package.
15/06/2023 08:16
Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa Posted Development Investment Project Investment in construction of residential area 1 Hong Thai village, Hoang Dong commune (MBQH No. 58/MBQH-UBND dated July 15, 2020) Hoang Hoa district.
15/06/2023 08:08
The data sheet has been partially hidden, to see the full information please Login or Register
Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa publishes Tender Notice Tender package No 2: Construction in the form Competitive Offer .
04/07/2023 15:50
Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa publishes the plan Moving medium and low voltage power lines and transformer stations in service of site clearance for project implementation: Upgrading and expanding Thinh-Dong road, Hoang Hoa district (phase 2) with 1 bidding package .
22/06/2023 18:34
Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa publishes Tender Notice Package 02: Consulting survey, making project feasibility study report in the form Open bidding .
20/06/2023 21:17
Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa publishes the plan Road from Phuc Ngu canal to Giang Son village, Hoang Truong commune, Hoang Hoa district with 1 bidding package .
20/06/2023 17:52
Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa publishes Tender Notice Package 02:Construction + equipment in the form Open bidding .
15/06/2023 09:29
Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa publishes the plan Investment in construction of residential area 1 Hong Thai village, Hoang Dong commune (MBQH No. 58/MBQH-UBND dated July 15, 2020) Hoang Hoa district with 1 bidding package .
15/06/2023 08:16
Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa announced the results of the bid package Construction supervision .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG CÔNG TRÌNH THĂNG LONG
13/06/2023 16:50
Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa publishes Tender Notice Package 02:Construction + insurance in the form Open bidding .
25/05/2023 17:42
Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa announced the results of the bid package Package 02:Construction + equipment .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG TÂY BẮC THANH HÓA
22/05/2023 08:43
Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa publishes the plan Upgrading the canals leading to the fields, Hoang Quy commune, Hoang Hoa district with 1 bidding package .
19/05/2023 11:26
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa has posted Tender Notice Tender package No 2: Construction of the investor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa with the form Competitive Offer.
04/07/2023 15:50
The Bid solicitor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa has posted the request Moving medium and low voltage power lines and transformer stations in service of site clearance for project implementation: Upgrading and expanding Thinh-Dong road, Hoang Hoa district (phase 2) of the investor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa with 1 bidding package.
22/06/2023 18:34
Bid solicitor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa has posted Tender Notice Package 02: Consulting survey, making project feasibility study report of the investor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa with the form Open bidding.
20/06/2023 21:17
The Bid solicitor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa has posted the request Road from Phuc Ngu canal to Giang Son village, Hoang Truong commune, Hoang Hoa district of the investor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa with 1 bidding package.
20/06/2023 17:52
Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa Posted Development Investment Project Road from Phuc Ngu canal to Giang Son village, Hoang Truong commune, Hoang Hoa district.
20/06/2023 17:17
Bid solicitor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa has posted Tender Notice Package 02:Construction + equipment of the investor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa with the form Open bidding.
15/06/2023 09:29
The Bid solicitor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa has posted the request Investment in construction of residential area 1 Hong Thai village, Hoang Dong commune (MBQH No. 58/MBQH-UBND dated July 15, 2020) Hoang Hoa district of the investor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa with 1 bidding package.
15/06/2023 08:16
Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa Posted Development Investment Project Investment in construction of residential area 1 Hong Thai village, Hoang Dong commune (MBQH No. 58/MBQH-UBND dated July 15, 2020) Hoang Hoa district.
15/06/2023 08:08
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa has posted 8 of the contractor selection plan, which contains 13 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa has posted 29 Tender Notice in the 26 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa has posted 5 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 5 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa is the investor of 29 package, of which 29 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa is the owner of 8 contractor selection plan. In which, they self-invite 8 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa is an investor with 4 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban QLDA Đầu tư xây dựng huyện Hoằng Hóa is the investor of 8 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code