Data analysis results of DauThau.info software for bid solicitors Project Management Unit 8 as follows:
- Has relationships with 11 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 1 contractor selection plans with a total of 1 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 28 packages (with 28 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 14 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 1 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 67.86%, Consultancy 32.14%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 109,877,685,429 VND, of which the total winning bid value is: 103,286,347,303 VND.
- The savings rate is: 6.00%.
Data analysis results of DauThau.info software for bid solicitors Project Management Unit 8 as follows:
- Has relationships with 11 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 67.86%, Consulting 32.14%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 109,877,685,429 VND, in which the total winning value is: 103,286,347,303 VND.
- The savings rate is: 6.00%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 1 Contractor selection plan in which 1 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 12 bidding packages in which 12 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package No. 2: Construction of the investor Project Management Unit 8.
15/06/2023 10:15
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package No. 3: Construction of the investor Project Management Unit 8.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG CÔNG TRÌNH VÀ THƯƠNG MẠI THỊNH PHÁT
14/06/2023 22:08
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package 02: Consultancy on surveying, making BVTC design and cost estimate of the investor Project Management Unit 8.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG VÀ PHÁT TRIỂN CÔNG NGHỆ
08/06/2023 13:57
The Bid solicitor Project Management Unit 8 has posted the request Plan for selecting contractor for preparation of Economic - Technical report on construction investment of the investor Project Management Unit 8 with 1 bidding package.
08/06/2023 09:43
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package No. 3: Construction of the investor Project Management Unit 8.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG B.M.T
07/06/2023 16:24
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package No. 3: Construction of the investor Project Management Unit 8.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG CÔNG TRÌNH 717
30/05/2023 16:10
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package 3: Construction supervision consultancy of the investor Project Management Unit 8.
30/05/2023 14:53
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package No. 2: Construction of the investor Project Management Unit 8.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG CÔNG TRÌNH 717
22/05/2023 11:46
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package No. 3: Construction of the investor Project Management Unit 8.
- Winning bidder: CÔNG TY CỔ PHẦN CE VIỆT NAM
09/05/2023 23:45
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package No. 2: Construction of the investor Project Management Unit 8.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG CÔNG TRÌNH GIAO THÔNG 73
09/05/2023 18:55
The data sheet has been partially hidden, to see the full information please Login or Register
Project Management Unit 8 announced the results of the bid package Package No. 2: Construction .
- Winning bidder:
15/06/2023 10:15
Project Management Unit 8 announced the results of the bid package Package No. 3: Construction .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG CÔNG TRÌNH VÀ THƯƠNG MẠI THỊNH PHÁT
14/06/2023 22:08
Project Management Unit 8 announced the results of the bid package Package 02: Consultancy on surveying, making BVTC design and cost estimate .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG VÀ PHÁT TRIỂN CÔNG NGHỆ
08/06/2023 13:57
Project Management Unit 8 publishes the plan Plan for selecting contractor for preparation of Economic - Technical report on construction investment with 1 bidding package .
08/06/2023 09:43
Project Management Unit 8 announced the results of the bid package Package No. 3: Construction .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG B.M.T
07/06/2023 16:24
Project Management Unit 8 announced the results of the bid package Package No. 3: Construction .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG CÔNG TRÌNH SỐ 2-715, CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG CÔNG TRÌNH 717
30/05/2023 16:10
Project Management Unit 8 announced the results of the bid package Package 3: Construction supervision consultancy .
- Winning bidder:
30/05/2023 14:53
Project Management Unit 8 announced the results of the bid package Package No. 2: Construction .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG CÔNG TRÌNH 717
22/05/2023 11:46
Project Management Unit 8 announced the results of the bid package Package No. 3: Construction .
- Winning bidder: CÔNG TY CỔ PHẦN CE VIỆT NAM
09/05/2023 23:45
Project Management Unit 8 announced the results of the bid package Package No. 2: Construction .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG CÔNG TRÌNH GIAO THÔNG 73
09/05/2023 18:55
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package No. 2: Construction of the investor Project Management Unit 8.
15/06/2023 10:15
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package No. 3: Construction of the investor Project Management Unit 8.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG CÔNG TRÌNH VÀ THƯƠNG MẠI THỊNH PHÁT
14/06/2023 22:08
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package 02: Consultancy on surveying, making BVTC design and cost estimate of the investor Project Management Unit 8.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG VÀ PHÁT TRIỂN CÔNG NGHỆ
08/06/2023 13:57
The Bid solicitor Project Management Unit 8 has posted the request Plan for selecting contractor for preparation of Economic - Technical report on construction investment of the investor Project Management Unit 8 with 1 bidding package.
08/06/2023 09:43
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package No. 3: Construction of the investor Project Management Unit 8.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG B.M.T
07/06/2023 16:24
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package No. 3: Construction of the investor Project Management Unit 8.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG CÔNG TRÌNH 717
30/05/2023 16:10
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package 3: Construction supervision consultancy of the investor Project Management Unit 8.
30/05/2023 14:53
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package No. 2: Construction of the investor Project Management Unit 8.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG CÔNG TRÌNH 717
22/05/2023 11:46
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package No. 3: Construction of the investor Project Management Unit 8.
- Winning bidder: CÔNG TY CỔ PHẦN CE VIỆT NAM
09/05/2023 23:45
The Bid solicitor Project Management Unit 8 has posted the results of the bidding package Package No. 2: Construction of the investor Project Management Unit 8.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG CÔNG TRÌNH GIAO THÔNG 73
09/05/2023 18:55
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Project Management Unit 8 has posted 1 of the contractor selection plan, which contains 1 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Project Management Unit 8 has posted 28 Tender Notice in the 28 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project Management Unit 8 has posted 14 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 14 package, canceled the bid 0 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Project Management Unit 8 has a relationship with 11 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Project Management Unit 8 has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Project Management Unit 8 is the investor of 12 package, of which 12 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Project Management Unit 8 is the owner of 1 contractor selection plan. In which, they self-invite 1 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Project Management Unit 8 is an investor with 6 contractor. The data sheet has been partially hidden, to see the full information please Login or Register